Planning application
Onslow Arboretum, Manor Way, Guildford
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Improvement works to footpath including installation of lighting assets (description amended and additional information received 30.01.26).
As published by the council, reference 25/P/01221
Application record
- Reference
- 25/P/01221
- Type
- Full Application
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 4 Sep 2025
- Validated
- 7 Oct 2025
- Decided
- 3 Jul 2026
- Ward
- Onslow
- Parish
- Onslow
- Decision by
- Delegated
Timeline
Dates from the published record
-
4 Sep 2025
Received by Guildford
-
7 Oct 2025
Validated
Checked as complete and ready for consideration.
-
3 Jul 2026
Decision issued: Approve
-
30 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
32 documents on file for this application
- Decision notice
- Officer report
- Preliminary ecological appraisal
- Surrey wildlife trust - comment
- Tree officer comment 2
- Tree related drawings
- Bng assessment
- Statutory biodiversity metric calculation tool
- Habitat condition sheets
- Biodiversity impact assessment and enhancement
- Countryside access officer
- Proposed light information
- Proposed section a general arrangement site plan sheet 5/10
- Sign schedule
- Surrey highways - comment
- Climate change questionnaire
- Design & access statement
- Bollard data sheet
- Bollard details
- Site plan
- Site plan with illustrations 1/2
- Site plan with illustrations 2/2
- Application form redacted
- Arboricultural report, impact assessment & method statement
- Tree impacts landscape plan 8
- Tree impacts landscape plan 7
- Cover letter
- Superseded proposed pathways, paving & guardrail plans & elevations
- Superseded proposed section a general arrangement site plan sheet 6/10
- Superseded proposed section a general arrangement site plan sheet 5/10
- Proposed lighting arrangement site plan
- Proposed electrical schematic technical plan
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Guildford granted permission on 3 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Guildford
-
26/P/01278 Awaiting decision
MECA,WORPLESDON UNITED REFORMED CHURCH, Rickford, Worplesdon, GUILDFORD, GU3 3PH
Variation of Condition
-
26/P/01254 Awaiting decision
Elm End Cottage and Hurtwood View Cottage, Little London, Albury, Guildford, GU5 9DG
Temporary change of use of existing dwellings (Use Class C3) to short-term visitor accommodation (to be managed and operated as part of the adjacent Public House with associated changes to access, parking and landscaping)
-
26/P/01210 Awaiting decision
13 Friary Street, Guildford, GU1 4EN
Application under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 3 (operating hours) to enable the restaurant to trade 24 hours a day, seven days a week, for outgoing customer deliveries only of planning permission 19/P/01250 (Application for the change of use from Use Class A3 (restaurant and cafe) to a flexible use within Classes A3 and / or A5 (hot food takeaway)).
-
26/P/01188 Awaiting decision
Poets Cottage, 58 Haydon Place, Guildford, GU1 4NE
Installation of new uPVC windows in existing openings and reconfiguration of external door alterations and removal of existing connected outbuilding
-
26/P/00844 Granted
Hogleys House, Chapel Lane, Pirbright, Guildford, GU24 0LU
Proposed external alterations to the existing dwellinghouse to include replacement ground floor bay windows, works to fenestration, proposed new canopy porch over new side door, flue added to side elevation, removal of chimney stack, together with external insulation works and insertion of rooflights.