Planning application

Land at Green Lane, Green Lane, Ockham, GU23 6PQ

Granted Guildford 25/D/00138/1 Discharge of Conditions

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of Condition 10 (surface water drainage) of planning application 23/P/01064 approved 20/06/2025

As published by the council, reference 25/D/00138/1

Application record

Reference
25/D/00138/1
Type
Discharge of Conditions
Status
Decided
Decision
Approve
Received
10 Dec 2025
Validated
7 Jan 2026
Decided
27 Feb 2026
Ward
Clandon & Horsley
Parish
West Horsley
Decision by
Delegated
Postcode
GU23 6PQ

Timeline

Dates from the published record

  1. 10 Dec 2025

    Received by Guildford

  2. 7 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 27 Feb 2026

    Decision issued: Approve

  4. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy

38 applications on PlanIndex · across 20 councils · 38% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • Green Lane House, Green Lane, Ockham, Woking, GU23 6PQ

    25/P/01210 Submitted 3 Sep 2025 0m away

    Construction of a pair of timber entrance gates along with associated rendered piers and railings.

    Withdrawn Full applications 9 docs
  • Land south of Green Lane, West Horsley, GU23 6PQ

    25/P/01546 Submitted 11 Nov 2025 0m away

    Construction of four detached 4-bedroom dwellings, together with single bay garages, associated amenity space, landscaping and the formation of a pedestrian and vehicular access from Edenwood Close.

    Refused Full applications 60 docs
  • Green Lane House, Green Lane, Ockham, Woking, GU23 6PQ

    26/P/00118 Submitted 30 Jan 2026 0m away

    Erection of black metal entrance gates along with associated black metal piers and railings.

    Granted Full applications 8 docs
  • Land at Green Lane, Green Lane, Ockham, GU23 6PQ

    25/D/00138 Submitted 18 Sep 2025 0m away

    Discharge of conditions 3 (site restoration), 5 (external lighting), 6 (sustainability measures), 7 (nature conservation), 8 (cycle storage) and 9 (EV chargers) of planning permission 23/P/01064 (approved 20/06/2025).

    Granted Conditions 14 docs
  • Land at Green Lane, Green Lane, Ockham, GU23 6PQ

    26/P/01041 Submitted 31 Jul 2026 2m away

    86% historically approved · decision due ~1 Oct

    Application under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condi...

    Awaiting decision 15 docs
  • Land at Oakland Farm, Green Lane, Ockham, GU23 6PD

    22/D/00072/10 Submitted 13 Feb 2023 149m away

    Discharge of Condition 4 (External Materials Schedule) of planning permission 21/P/00917 approved 06/05/2022.

    Granted Conditions 6 docs

In Guildford

  • 25/D/00186 Granted

    Land At Wisley Airfield, Hatch Lane, Ockham, GU23 6NU

    Part discharge of condition 2 (external materials) for Phase 3 NH1, sub phases 1.1 and 1.2, of Reserved Matters Approval ref. 25/P/00305, approved 18/09/25, pursuant to Outline Planning Permission ref. 22/P/01175, approved on 24/05/2024.

    5 Dec 2025 Conditions
  • 25/D/00190/3 Granted

    Magnet, Woodbridge Road, Guildford, GU1 1DP

    Discharge of conditions 13 (landscape design) and 24 (cycle parking details) of planning application 24/P/01503 approved 03/12/2025.

    1 May 2026 Conditions
  • 25/D/00079 Refused

    Tap Farm, Orestan Lane, Effingham, Leatherhead, KT24 5SJ

    Discharge of condition 4 (Biodiversity Enhancement) of planning application 23/P/01175 (APP/Y361/W/24/3348005). Approved 02/05/2025

    3 Jun 2025 Conditions
  • 26/D/00036 Granted

    Oxto Energy Limited, First Floor Rear, 173A High Street, Guildford, GU1 3AJ

    Discharge of condition 4 (ventilation system) of planning permission 24/W/00105, approved on 16/01/2025.

    2 Mar 2026 Conditions
  • 24/D/00114/77 Granted

    Land At Wisley Airfield, Hatch Lane, Ockham, GU23 6NU

    Discharge of condition 20 (Veteran Tree Management Plan) for SANG phases 1, 2 and 3, and Access and Landscaping phase 1 and SANG Car Parks of application 22/P/01175, approved at appeal on 24/05/2024.

    6 Mar 2026 Conditions