Skip to content
PlanIndex Get alerts
Menu

Planning application

26/1745/F

UNIT 4, LOMBARD TRADING ESTATE, ANCHOR AND HOPE LANE, CHARLTON, LONDON, SE7 7SN

Awaiting decision Greenwich Full Planning Permission

Proposal

Installation of new roof with roof lights and PV panels, air source heat pump, EV charging point, replacement of windows, doors and downpipes; and associated works.

As published by the council, reference 26/1745/F

Timeline

Dates from the published record

  1. 12 Jun 2026

    Received by Greenwich

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Greenwich for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/0717/F Awaiting decision

    PLOT A, VIP TRADING ESTATE, ANCHOR AND HOPE LANE, LONDON, SE7 7TE

    Redevelopment for an industrial/logistics warehouse (Use Class B2/B8/E(g)(III)) with ancillary office, creation of new access and associated parking, servicing, landscaping and other associated works.

    5 Mar 2025 190m away Full applications
  • 21/0572/SD Refused

    Antigallican, 428 Woolwich Road, Charlton, SE7 8SU

    Submission of details pursuant to the discharge of Condition 16 (Wheelchair accessibility) of planning permission dated 29/05/2019 (Ref: 18/2673/F)

    15 Feb 2021 401m away Conditions
  • 26/0392/F Granted

    LAND AT MURPHY?S WHARF, LOMBARD WALL, GREENWICH, LONDON SE7 7SH

    Reconfiguration and additions to existing C&D plant and storage areas including erection of unprocessed glass storage area enclosure (enclosed on three sides and covered) and other ancillary plant items, conveyors and structures, to additionally allow for screening and cleaning of glass (as well as continued recycling of C&D waste); Installation of feed ramp, belt feeder and hopper for existing HBM plant; and works associated with provision of sealed drainage system (Retrospective application).

    6 Feb 2026 404m away Full applications
  • 11/0324/F Withdrawn

    35-37 CHARLTON CHURCH LANE, CHARLTON, SE7 7AG

    Amendment to allow scheme (Ref: 061514/F) to create a single storey rear extension and installation of galvanised framed deck access.

    14 Feb 2011 429m away Full applications
  • 10/2157/F Refused

    35-37 CHARLTON CHURCH LANE, CHARLTON, SE7 7AG

    Amendment of allowed scheme (Ref: 06/1514/F) to create a single storey rear extension and installation of galvanized framed deck access and removal of approved car parking area.

    31 Aug 2010 429m away Full applications
  • 14/0608/SD Granted

    33-37 CHARLTON CHURCH LANE, CHARLTON, SE7 7AG

    Submission of details pursuant to condition 6 (Plant and Machinery) of planning permission dated 27th September 2013 (Ref: 12/1638/F) for the erection of a single storey rear extension to increase commercial floor space and installation of decking together with internal alterations to flats.

    10 Mar 2014 429m away Conditions

In Greenwich

  • 26/0654/F Granted

    89 CONGREVE ROAD, ELTHAM, LONDON, SE9 1LL

    Replacement of rooftiles and associated works.

    2 Mar 2026 Full applications
  • 26/0903/F Granted

    29-31 GREENWICH CHURCH STREET, LONDON, SE10 9BJ

    Painting of the shopfront along with the fascia board and associated works.

    20 Mar 2026 Full applications
  • 26/2198/F Awaiting decision

    18E KIDBROOKE PARK ROAD, LONDON, SE3 0LW

    Internal conversion of a 1 bedroom flat into a 2 bedroom flat.

    23 Jul 2026 Full applications
  • 25/4026/F Granted

    OLD POUND APARTMENTS, 2 WESTCOMBE HILL, GREENWICH, LONDON, SE10 0LH

    Construction of a two-storey two bedroom house on the land to the southeast of Old Pound Apartments 2 Westcombe Hill and associated alterations.

    1 Dec 2025 Full applications
  • 26/2177/F Awaiting decision

    Mizzen Mast House, Mast Quay Phase 1, Woolwich, SE18 5NP

    Installation of replacement façade treatment and balcony decking (as previously considered under planning permission ref. 23/1848/F).

    22 Jul 2026 Full applications