Planning application
Carriageway along Western Way, Central Way, Eastern Way, Carlyle Road and Harrow Manorway, Thamesmead, SE28
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Request for a Screening Opinion under Part 2, Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the following works: ? Bus stop upgrades to improve accessibility, capacity and ease of access; ? Enhanced cycle facilities along the corridor, strengthening connections with the existing cycle network; ? New pedestrian crossings at key locations to improve safety and comfort for people walking around Thamesmead; and ? New bus lanes operating 24 hours a day, seven days a week, and available for use by cyclists and taxis.
As published by the council, reference 26/0786/EIA
Application record
- Reference
- 26/0786/EIA
- Type
- Screening Opinion (EIA)
- Status
- Decided
- Decision
- Not Required
- Received
- 26 Feb 2026
- Validated
- 26 Feb 2026
- Decided
- 19 Mar 2026
- Decision by
- Delegation
Timeline
Dates from the published record
-
26 Feb 2026
Received by Greenwich
-
19 Mar 2026
Decision issued: Not Required
-
11 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Greenwich has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Other outline applications
In Greenwich
-
25/1867/K Decided
Liverpool Street Station, Liverpool Street, EC2M 7PY; Andaz Hotel, 40 Liverpool Street, EC2M 7QN; and 50 Liverpool Street, EC2M 7PY
Phased development comprising partial demolition and alterations, including station concourse, trainsheds, and truss/columns, demolition of 50 Liverpool Street, demolition of Bishopsgate Square entrance and Hope Square entrance; works to Sun Street Passage; Works of reconstruction and remodelling of station basement, lower and upper concourse levels, new station columns/truss and roof (in part); introduction of new lifts, escalators and stairs and service spine at basement; increased operational space; insertion of new ticket gates; creation of new station entrances from Hope Square and Bishopsgate Square; creation of new units at lower and upper concourse levels for Class E (shops, cafe, restaurants),hot food takeaway (Sui Generis) and pub/bar (Sui Generis); creation of new upper concourses and associated new public access from Exchange Square including new walkways; provision of over-station development reaching a maximum height of 97.67m AOD to accommodate Class E use (commercial, service and business); and creation of an auditorium (Sui Generis) at Level 18 with ancillary terrace; creation of a public amenity terrace (Sui Generis) at Level 18 with access from Hope Square entrance; provision of private office terraces; provision of cycle parking and associated access ramp, servicing, refuse and ancillary plant; alterations to pedestrian and vehicular access including provision of new ramp; public realm works to Hope Square and Bishopsgate Square; and associated works.
-
25/1799/K Decided
Kedge House, Starboard Way and Winch House, Tiller Road, London E14 8PS
Demolition of the existing buildings and structures and construction of residential dwellings (Use Class C3), community/commercial floorspace (Use Class E and F), public realm works, landscaping, access, servicing, parking and associated works. This application is accompanied by an Environmental Impact Assessment.
-
25/4205/K Decided
Liverpool Street Station, Liverpool Street, EC2M 7PY
Phased development comprising partial demolition and alterations (Re-consultation due to the submission of additional information).
-
26/0297/K Decided
Site Comprising Liverpool Street Station, 50 Liverpool Street, Sun Street Passage, 40 Liverpool Street (in Part), Hope Square, And Bishopsgate Plaza London EC2M 7PY
Phased development comprising partial demolition and alterations, including station concourse, trainsheds, and truss/columns, demolition of 50 Liverpool Street, demolition of Bishopsgate Square entrance and Hope Square entrance; works to Sun Street Passage; Works of reconstruction and remodelling of station basement, lower and upper concourse levels, new station columns/truss and roof (in part); introduction of new lifts, escalators and stairs and service spine at basement; increased operational space; insertion of new ticket gates; creation of new station entrances from Hope Square and Bishopsgate Square; creation of new units at lower and upper concourse levels for Class E (shops, cafe, restaurants),hot food takeaway (Sui Generis) and pub/bar (Sui Generis); creation of new upper concourses and associated new public access from Exchange Square including new walkways; provision of over-station development reaching a maximum height of 97.67m AOD to accommodate Class E use (commercial, service and business); and creation of an auditorium (Sui Generis) at Level 18 with ancillary terrace; creation of a public amenity terrace (Sui Generis) at Level 18 with access from Hope Square entrance; provision of private office terraces; provision of cycle parking and associated access ramp, servicing, refuse and ancillary plant; alterations to pedestrian and vehicular access including provision of new ramp; public realm works to Hope Square and Bishopsgate Square; and associated works.
-
25/1482/K Decided
CAR PARK, BLACKHEATH STATION, BLACKHEATH VILLAGE, LONDON, SE3 9LE
Construction of three buildings ranging between 3 - 5 storeys, comprising 45 residential units (Use Class C3) , flexible commercial and learning and non-residential institution space (Use Class E and Use Class F1), the provision of a farmers market and landscaping works including public square, cycle parking, car parking, plant and associated ancillary works including the relocation of a sewer at Car Park, Blackheath Station, Blackheath Village SE3.