Skip to content
PlanIndex Get alerts
Menu

Planning application

26/0394/O

3-5 TUNNEL AVENUE, GREENWICH, SE10 0SL

Awaiting decision Greenwich Outline Planning Permission

Proposal

Outline planning application (siting, scale and access) for a one-storey upwards extension to existing building comprising of 9no. additional student accommodation units, extension to existing third floor footprint and associated works (Development site is within the setting of the Grade II Listed East Greenwich Library and the Grade II Listed Former East Greenwich Fire Station).

As published by the council, reference 26/0394/O

Timeline

Dates from the published record

  1. 6 Feb 2026

    Received by Greenwich

  2. 24 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 26 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Greenwich for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 26/0830/SD Awaiting decision

    Outbuilding to the rear of 133 Woolwich Road, Greenwich,London SE10 0RJ

    Submission of details pursuant to discharge condition 4 (Waste management plan), condition 6 (Car free) and condition 8 (Proposed hours of use) of planning permission reference 25/4017/F date 18/02/2026.

    13 Mar 2026 122m away Conditions
  • 21/0562/HD Granted

    51 KEMSING ROAD, GREENWICH, LONDON, SE10 0LL

    Construction of two outbuildings with connected basement and lightwell (Resubmission).

    15 Feb 2021 150m away Householder
  • 20/3569/HD Granted

    51 KEMSING ROAD, GREENWICH, LONDON, SE10 0LL

    Construction of a side and rear infill extension and the replacement of existing boundary fences with a 2.2m wall and other associated external alterations

    20 Nov 2020 150m away Householder
  • 25/4026/F Granted

    OLD POUND APARTMENTS, 2 WESTCOMBE HILL, GREENWICH, LONDON, SE10 0LH

    Construction of a two-storey two bedroom house on the land to the southeast of Old Pound Apartments 2 Westcombe Hill and associated alterations.

    1 Dec 2025 170m away Full applications
  • 26/0344/F Awaiting decision

    53 TUNNEL AVENUE & Grass Verge Fronting Chilver Street, GREENWICH, LONDON, SE10 0SF

    Construction of a two-storey detached family dwelling and associated works.

    3 Feb 2026 180m away Full applications
  • 26/2014/CP Awaiting decision

    29 HALSTOW ROAD, GREENWICH, LONDON, SE10 0LD

    Certificate of Lawfulness (Proposed) is sought for the proposed works comprise minor external alterations to the existing dwellinghouse, including the installation of patio doors to the rear elevation, the installation of one new side window, and the renewal of the existing roof, maintaining the existing roof slope/pitch, with the installation of one new rooflight/skylight within the renewed roof slope.

    7 Jul 2026 186m away Lawful development

In Greenwich

  • 26/2229/K Awaiting decision

    Peninsular House 30 - 36 Monument Street London EC3R 8LJ

    Refurbishment and extension of the existing building at the front, tenth and eleventh floors, alteration to City Walkway and all enabling works associated with the development and a change of use from Office (Class E(g)) to deliver a new Hotel (Class C1).

    22 Jul 2026 Outline
  • 25/1867/K Decided

    Liverpool Street Station, Liverpool Street, EC2M 7PY; Andaz Hotel, 40 Liverpool Street, EC2M 7QN; and 50 Liverpool Street, EC2M 7PY

    Phased development comprising partial demolition and alterations, including station concourse, trainsheds, and truss/columns, demolition of 50 Liverpool Street, demolition of Bishopsgate Square entrance and Hope Square entrance; works to Sun Street Passage; Works of reconstruction and remodelling of station basement, lower and upper concourse levels, new station columns/truss and roof (in part); introduction of new lifts, escalators and stairs and service spine at basement; increased operational space; insertion of new ticket gates; creation of new station entrances from Hope Square and Bishopsgate Square; creation of new units at lower and upper concourse levels for Class E (shops, cafe, restaurants),hot food takeaway (Sui Generis) and pub/bar (Sui Generis); creation of new upper concourses and associated new public access from Exchange Square including new walkways; provision of over-station development reaching a maximum height of 97.67m AOD to accommodate Class E use (commercial, service and business); and creation of an auditorium (Sui Generis) at Level 18 with ancillary terrace; creation of a public amenity terrace (Sui Generis) at Level 18 with access from Hope Square entrance; provision of private office terraces; provision of cycle parking and associated access ramp, servicing, refuse and ancillary plant; alterations to pedestrian and vehicular access including provision of new ramp; public realm works to Hope Square and Bishopsgate Square; and associated works.

    5 Jun 2025 Outline
  • 25/1799/K Decided

    Kedge House, Starboard Way and Winch House, Tiller Road, London E14 8PS

    Demolition of the existing buildings and structures and construction of residential dwellings (Use Class C3), community/commercial floorspace (Use Class E and F), public realm works, landscaping, access, servicing, parking and associated works. This application is accompanied by an Environmental Impact Assessment.

    28 May 2025 Outline
  • 25/4205/K Decided

    Liverpool Street Station, Liverpool Street, EC2M 7PY

    Phased development comprising partial demolition and alterations (Re-consultation due to the submission of additional information).

    8 Dec 2025 Outline
  • 26/0297/K Decided

    Site Comprising Liverpool Street Station, 50 Liverpool Street, Sun Street Passage, 40 Liverpool Street (in Part), Hope Square, And Bishopsgate Plaza London EC2M 7PY

    Phased development comprising partial demolition and alterations, including station concourse, trainsheds, and truss/columns, demolition of 50 Liverpool Street, demolition of Bishopsgate Square entrance and Hope Square entrance; works to Sun Street Passage; Works of reconstruction and remodelling of station basement, lower and upper concourse levels, new station columns/truss and roof (in part); introduction of new lifts, escalators and stairs and service spine at basement; increased operational space; insertion of new ticket gates; creation of new station entrances from Hope Square and Bishopsgate Square; creation of new units at lower and upper concourse levels for Class E (shops, cafe, restaurants),hot food takeaway (Sui Generis) and pub/bar (Sui Generis); creation of new upper concourses and associated new public access from Exchange Square including new walkways; provision of over-station development reaching a maximum height of 97.67m AOD to accommodate Class E use (commercial, service and business); and creation of an auditorium (Sui Generis) at Level 18 with ancillary terrace; creation of a public amenity terrace (Sui Generis) at Level 18 with access from Hope Square entrance; provision of private office terraces; provision of cycle parking and associated access ramp, servicing, refuse and ancillary plant; alterations to pedestrian and vehicular access including provision of new ramp; public realm works to Hope Square and Bishopsgate Square; and associated works.

    27 Jan 2026 Outline