Planning application
Southwood Site, University of Greenwich, Avery Hill Road, Avery Hill, London, SE9 2UG
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Relates to 22/3446/F
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
An application submitted under Section 73 of the Town & Country Planning Act 1990 for a minor material amendment in connection with the planning permission dated 31/01/2023 (Reference: 22/3446/F) for construction of new energy centre with four satellite plant rooms, comprising single storey stand alone building with adjoining external plant compound, single storey stand alone plant room to the west of the David Fussey building, single storey extensions to Grey and Bronte buildings, together with alterations to the Fry building to accommodate internal plant to allow: - Variation to Condition 4 (Plant Noise) where attenuation target of 10dB below the existing background noise level is lowered to 6dB.
As published by the council, reference 23/2408/MA
Application record
- Reference
- 23/2408/MA
- Type
- Minor material Amendment
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 19 Jul 2023
- Validated
- 26 Jul 2023
- Decided
- 13 Dec 2023
- Ward
- ELTHAM TOWN & AVERY HILL
- Parish
- Eltham & Kidbrooke
- Decision by
- Delegation
- Postcode
- SE9 2UG
Site history
Applications at this address on the Greenwich register
This site has had 5 applications since 2020: 5 approved, 0 refused.
-
23/0708/SD Granted
Southwood Site, University of Greenwich, Avery Hill Road, Avery Hill, London, SE9 2UG
Submission of details to pursuant Condition 7 (Management plan) for planning application 22/0304/F dated on 08/07/2022
-
22/3446/F Granted
Southwood Site, University of Greenwich, Avery Hill Road, Avery Hill, London, SE9 2UG
Construction of new energy centre with four satellite plant rooms, comprising single storey stand alone building with adjoining external plant compound, single storey stand alone plant room to the west of the David Fussey building, single storey extensions to Grey and Bronte buildings, together with alterations to the Fry building to accommodate internal plant. (THIS IS A DEPARTURE FROM THE DEVELOPMENT PLAN)
-
22/0304/F Granted
Southwood Site, University of Greenwich, Avery Hill Road, Avery Hill, London, SE9 2UG
Installation of a temporary modular building, to be erected for 5 years: 1 critical care training unit (16.36m x 12.37m) to be sited on a grassy verge between Jane Seymour Court, David Fussey building and car parking to the west of the campus. (THIS IS A DEPARTURE FROM THE DEVELOPMENT PLAN)
-
20/0252/F Granted
Southwood Site, University of Greenwich, Avery Hill Road, Avery Hill, London, SE9 2UG
Installation of a temporary modular building, to be erected for 5 years: 1 chemistry teaching laboratory (24m x 10m) to be sited on a grassy verge between Jane Seymour Court, David Fussey building and car parking to the west of the campus. Construction of a temporary modular building for a period of 5 years.
Timeline
Dates from the published record
-
19 Jul 2023
Received by Greenwich
-
26 Jul 2023
Validated
Checked as complete and ready for consideration.
-
13 Dec 2023
Decision issued: Approve
-
11 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
22/3446/F Granted
Southwood Site, University of Greenwich, Avery Hill Road, Avery Hill, London, SE9 2UG
Construction of new energy centre with four satellite plant rooms, comprising single storey stand alone building with adjoining external plant compound, single storey stand alone plant room to the west of the David Fussey building, single storey extensions to Grey and Bronte buildings, together with alterations to the Fry building to accommodate internal plant. (THIS IS A DEPARTURE FROM THE DEVELOPMENT PLAN)
Who's behind it
Company information only, from the register and Companies House
Darren Stacey Architecture Agent, an architecture practice
17 applications on PlanIndex · across 6 councils · 71% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Greenwich granted permission on 13 December 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Avery Hill Campus, Avery Hill Road, Eltham, London, SE9 2UG
Certificate of Lawfulness (Proposed) for The relocation of an access ramp and doorway to provide centralised student services to the Aragon Building. The provision of ramped access to an existing office at 19-20 Aragon Court. The provision of refuse and recycling facilities close to the David Fussey Building. The provision of composting bays on the campus.
Refused Lawful development 18 docs -
Southwood Site, University of Greenwich, Avery Hill Road, London, SE9 2UG
Submission of details pursuant to the partial discharge of Condition 3 (Materials) of Planning Permission dated 01/03/2023 Planning Ref: 22/3446/F.
Granted Conditions 6 docs -
MULTI-USE GAMES AREA, UNIVERSITY OF GREENWICH AVERY HILL CAMPUS, AVERY HILL ROAD, AVERY HILL, LONDON, SE9 2UG
Submission of details pursuant to discharge Condition 5 (Community Use Agreement), Condition 7 (Sustainable Drainage Principles) and Condition 8 (Construction Surface Water Management Plan) of Planning Permission Reference 25/2601/F dated 23/10/2025.
Refused Conditions 8 docs -
Southwood Site, University of Greenwich, Avery Hill Road, Avery Hill, London, SE9 2UG
Submission of details to pursuant Condition 7 (Management plan) for planning application 22/0304/F dated on 08/07/2022
Granted Conditions 7 docs -
Southwood Site, University of Greenwich, Avery Hill Road, Avery Hill, London, SE9 2UG
Construction of new energy centre with four satellite plant rooms, comprising single storey stand alone building with adjoining external plant compound, single storey stand alone plant room to the west of the David Fussey building, single storey extensions to Grey and Bronte buildings, together with alterations to the Fry building to accommodate internal plant. (THIS IS A DEPARTURE FROM THE DEVELOPMENT PLAN)
Granted Full applications Extension 45 docsSmall domestic -
Avery Hill Campus, Avery Hill Road, London, SE9 2UG
Installation of Photovoltaic panels on the roofs of late 20th century buildings at Avery Hill Campus.
Granted Full applications 27 docs
Other amendment applications
In Greenwich
-
26/2498/NM Awaiting decision
87 Blackwall Lane, Greenwich, SE10 0AP
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with the planning permission dated 19 December 2019, for the 'Demolition of existing structures and construction of part 3/part 5 and part 6 storey building comprising 27 residential units and 182sqm of commercial floorspace (flexible A1/A3/B1/D1) including landscaping, provision of amenity areas, cycle storage, refuse storage, plant equipment and highway alterations'. To allow the change to description of development wording of the application - From: Demolition of existing structures and construction of part 3/part 5 and part 6 storey building comprising 27 residential units and 182sqm of commercial floorspace (flexible A1/A3/B1/D1) including landscaping, provision of amenity areas, cycle storage, refuse storage, plant equipment and highway alterations' To: 'Demolition of existing structures and construction of part 3/part 5 and part 6 storey building comprising 27 residential units and 154.96sqm of commercial floorspace (Use Class E(a), (b), (c), (i), (ii), (iii), (e), (f), (g) (i) & (ii)) including landscaping, provision of amenity areas, cycle storage, refuse storage, plant equipment and highway alterations.'
-
26/2357/MA Awaiting decision
Former Greenwich Magistrates Court (including rear car park), 7-9 Blackheath Road & 2 Greenwich High Road, Greenwich, London, SE10 8PE
An application submitted under Section 19 of the Planning (Listed Buildings and Conservation Areas) Act 1990 (as amended) for a variation of a condition associated with the Listed Building Consent 24/2345/MA dated 20/11/2024, for Redevelopment of the Site, including the refurbishment of the existing Grade II Listed Magistrates Court and part demolition of existing structures, for a new hotel including ancillary facilities, flexible Class A1 / A2 / A3 / A4 / D1 / D2 / ancillary C1 floorspace, a publicly accessible square with associated soft and hard landscaping, ancillary refuse and recycling storage, cycle parking, wheelchair parking, coach and taxi drop off bays and servicing arrangements, to allow: - Amend Condition 11 (Removal, relocation and re-use of significant furniture and partitioning) from: Prior to works relating to the proposed superstructure full details are to be submitted to, and approved in writing by, the Local Planning Authority in consultation with Historic England for the following: ? all significant furnishing and fixtures shall either be retained on site or re-used elsewhere in the listed building. ? Partitioning within the Court Room to accommodate bar use. to: Prior to works relating to the proposed superstructure full details are to be submitted to, and approved in writing by, the Local Planning Authority in consultation with Historic England for the following: ? All significant furnishing and fixtures shall either be retained on site or re-used elsewhere in the listed building. ? Partitioning within the Court Room to accommodate bar use. Details relating to the Partitioning within the Court Room to accommodate bar use shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of relevant works. The works shall be carried out strictly in accordance with the details as may be approved. The wording of this condition was approved under application 24/2345/MA. The Heritage Fabric Schedule submitted under planning reference 25/3398/SD is deemed to partially satisfy this condition, with details relating to the re-use and partitioning of the Court Room outstanding. Details regarding the partitioning within the Court Room to accommodate bar use, of this condition is yet to be discharged. The works shall be carried out strictly in accordance with the details as may be approved.
-
26/2221/NM Awaiting decision
Phase 3 and 4 Woolwich Central, Land at Love Lane, Grand Depot Road, John Wilson Street, Thames Street and Woolwich Road, SE18 6SJ
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with the planning permission dated 26/02/2026 (Reference: 25/0856/MA) for 'An application submitted under Section 73 of the Town & Country Planning Act 1990 in connection with the planning permission dated 04/03/2025 (Reference: 24/2023/MA) for "The construction of a mixed-use development (within two phases, known as Phase 3 and 4) comprising residential dwellings (Use Class C3), flexible commercial and business service uses (Use Class E), and community uses (Use Class F2), improvements to public realm with hard and soft landscaping (including new pedestrian link), highways works, car parking at Lower Ground Floor of Phase 4, cycle parking, refuse and recycling storage, plant, external amenity space, playspace and alterations to the roof of existing loading bay to provide amenity space for residents. Phase 3 will include the removal of temporary landscaping". This amendment proposes a modification to Conditions 1, 2, 3, 4, 25, 29, 32, 33, 35, 43, 56, 65, 66, 70 and 77 to increase building height of Blocks A, B and C, redesign of stair/lift core and service areas, relocated cycle storage, reconfiguration of refuse storage area, fenestration adjustments, commercial unit size reductions, apartment size/occupancy amendments and landscape updates.', to allow: - Variation of Condition 73 (BREEAM) to enable a staged BREEAM approach to reflect the delivery strategy of the non-residential elements of the scheme.
-
26/0740/SD Granted
8 WHINYATES ROAD, ELTHAM, LONDON, SE9 6NN
An application submitted under Section 73 of the Town & Country Planning Act 1990 in connection with planning permission dated 09/02/2026, ref: 25/3814/HD for 'Retiling of roof and replacement of render with associated works.': - Amendment to Condition 3 (materials)
-
26/2022/MA Awaiting decision
22 MEADOWBANK, BLACKHEATH, LONDON, SE3 9XD
An application submitted under Section 73 of the Town & Country Planning Act 1990 in connection with planning permission dated 24/11/2022, ref: 21/4546/HD for "Construction of a two-storey side/rear extension, single storey rear extension and provision of subterranean basement with lightwells." to allow for: - Amendment to Condition 2 (Drawimgs)