Planning application

23/0085/K

24 MOTTINGHAM ROAD, LONDON, SE9 4QW

Granted Greenwich Consultation by other Borough\LDDC

Proposal

The erection of substation. (RETROSPECTIVE).

As published by the council, reference 23/0085/K

Timeline

Dates from the published record

  1. 10 Jan 2023

    Received by Greenwich

  2. 31 Jan 2023

    Decision issued: Raise No Objection

  3. 26 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 26/01893/FPA Granted

    61A MOTTINGHAM ROAD, MOTTINGHAM, LONDON, SE9 4QZ

    Conversion of existing 4 bedroom duplex flat into 2x1 bedroom flats with associated cycle storage.

    11 May 2026 104m away Full applications
  • 26/01893/CON Awaiting decision

    61A MOTTINGHAM ROAD, MOTTINGHAM, LONDON, SE9 4QZ

    Details submitted to comply with the requirements of the following conditions relating to planning permission 26/01893/FPA: Condition 3 - Refuse & Recyclables Storage Management Plan Condition 4 - Bicycle Parking Arrangements

    22 Jul 2026 104m away Conditions
  • 25/01962/TPO Granted

    Casa Bello, 13A Court Farm Road, Mottingham, London, SE9 4JH

    Ash - Reduce crown to previous cut points, by approx 4m in height and 2m in lateral spread.SUBJECT TO TPO 1756 (26.10.2000)

    27 May 2025 111m away Trees
  • 22/00961/FULL1 Refused

    Garages Rear Of 47-75, Mottingham Road, Mottingham, London

    Use of the vehicular access between 45-47 Mottingham Road within the London Borough of Bromley relating to the demolition of existing garages, together with construction, access, and servicing of 4 detached two storey buildings with associated cycle and car parking and landscaping situated within the London Borough of Greenwich. The proposed use classes are E (professional, financial and other smalls commercial services to service its immediate locality i.e., gym, nursery or similar); and use classes B2, B8 (general industrial, storage, distribution).

    3 Mar 2022 124m away Full applications
  • 26/1635/HD Awaiting decision

    28 WEST PARK, ELTHAM, LONDON, SE9 4RQ

    Construction of a garden office with canopy and decking.

    1 Jun 2026 155m away Householder
  • 24/03626/PLUD Decided

    13 Portland Crescent, Mottingham, London, SE9 4TT

    Loft conversion to habitable room including L shaped rear dormer with two Juillet balcony and two front roof lights.LAWFUL DEVEOPMENT CERTIFICATE (PROPOSED)

    27 Sep 2024 203m away Lawful development

In Greenwich

  • 26/2229/K Awaiting decision

    Peninsular House 30 - 36 Monument Street London EC3R 8LJ

    Refurbishment and extension of the existing building at the front, tenth and eleventh floors, alteration to City Walkway and all enabling works associated with the development and a change of use from Office (Class E(g)) to deliver a new Hotel (Class C1).

    22 Jul 2026 Outline
  • 25/1867/K Decided

    Liverpool Street Station, Liverpool Street, EC2M 7PY; Andaz Hotel, 40 Liverpool Street, EC2M 7QN; and 50 Liverpool Street, EC2M 7PY

    Phased development comprising partial demolition and alterations, including station concourse, trainsheds, and truss/columns, demolition of 50 Liverpool Street, demolition of Bishopsgate Square entrance and Hope Square entrance; works to Sun Street Passage; Works of reconstruction and remodelling of station basement, lower and upper concourse levels, new station columns/truss and roof (in part); introduction of new lifts, escalators and stairs and service spine at basement; increased operational space; insertion of new ticket gates; creation of new station entrances from Hope Square and Bishopsgate Square; creation of new units at lower and upper concourse levels for Class E (shops, cafe, restaurants),hot food takeaway (Sui Generis) and pub/bar (Sui Generis); creation of new upper concourses and associated new public access from Exchange Square including new walkways; provision of over-station development reaching a maximum height of 97.67m AOD to accommodate Class E use (commercial, service and business); and creation of an auditorium (Sui Generis) at Level 18 with ancillary terrace; creation of a public amenity terrace (Sui Generis) at Level 18 with access from Hope Square entrance; provision of private office terraces; provision of cycle parking and associated access ramp, servicing, refuse and ancillary plant; alterations to pedestrian and vehicular access including provision of new ramp; public realm works to Hope Square and Bishopsgate Square; and associated works.

    5 Jun 2025 Outline
  • 25/1799/K Decided

    Kedge House, Starboard Way and Winch House, Tiller Road, London E14 8PS

    Demolition of the existing buildings and structures and construction of residential dwellings (Use Class C3), community/commercial floorspace (Use Class E and F), public realm works, landscaping, access, servicing, parking and associated works. This application is accompanied by an Environmental Impact Assessment.

    28 May 2025 Outline
  • 25/4205/K Decided

    Liverpool Street Station, Liverpool Street, EC2M 7PY

    Phased development comprising partial demolition and alterations (Re-consultation due to the submission of additional information).

    8 Dec 2025 Outline
  • 26/0297/K Decided

    Site Comprising Liverpool Street Station, 50 Liverpool Street, Sun Street Passage, 40 Liverpool Street (in Part), Hope Square, And Bishopsgate Plaza London EC2M 7PY

    Phased development comprising partial demolition and alterations, including station concourse, trainsheds, and truss/columns, demolition of 50 Liverpool Street, demolition of Bishopsgate Square entrance and Hope Square entrance; works to Sun Street Passage; Works of reconstruction and remodelling of station basement, lower and upper concourse levels, new station columns/truss and roof (in part); introduction of new lifts, escalators and stairs and service spine at basement; increased operational space; insertion of new ticket gates; creation of new station entrances from Hope Square and Bishopsgate Square; creation of new units at lower and upper concourse levels for Class E (shops, cafe, restaurants),hot food takeaway (Sui Generis) and pub/bar (Sui Generis); creation of new upper concourses and associated new public access from Exchange Square including new walkways; provision of over-station development reaching a maximum height of 97.67m AOD to accommodate Class E use (commercial, service and business); and creation of an auditorium (Sui Generis) at Level 18 with ancillary terrace; creation of a public amenity terrace (Sui Generis) at Level 18 with access from Hope Square entrance; provision of private office terraces; provision of cycle parking and associated access ramp, servicing, refuse and ancillary plant; alterations to pedestrian and vehicular access including provision of new ramp; public realm works to Hope Square and Bishopsgate Square; and associated works.

    27 Jan 2026 Outline