Skip to content
PlanIndex Get alerts
Menu

Planning application

Fleggburgh Village Hall Main Road Fleggburgh NR29 3AG

Granted Great Yarmouth 06/26/0442/CD Condition Discharge

Relates to 06/24/0756/F

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of deemed BNG condition of pp. 06/24/0756/F (Construction of hard surfacing to extend the existing car park) - Submission of a Biodiversity Gain Plan.

As published by the council, reference 06/26/0442/CD

Application record

Reference
06/26/0442/CD
Type
Condition Discharge
Status
CON FULLY DISCHARGED
Decision
CON FULLY DISCHARGED
Received
1 Jun 2026
Validated
17 Jun 2026
Decided
12 Aug 2026
Postcode
NR29 3AG

Site history

Applications at this address on the Great Yarmouth register

This site has had 4 applications since 2026: 2 approved, 0 refused.

  • 06/26/0322/CD Granted

    Fleggburgh Village Hall Main Road Fleggburgh NR29 3AG

    Discharge of Condition 9 (bollard details) of pp. 06/24/0756/F (Construction of hard surfacing to extend the existing car park to provide an additional 37no. parking spaces, with associated landscaping, planting, CCTV and lighting).

    Decided 3 Sep 2026 Conditions
  • 06/26/0321/CD Awaiting decision

    Fleggburgh Village Hall Main Road Fleggburgh NR29 3AG

    Discharge of Condition 5 (Habitat Management and Monitoring Plan) of pp. 06/24/0756/F (Construction of hard surfacing to extend the existing car park to provide an additional 37no. parking spaces, with associated landscaping, planting, CCTV and lighting).

    Submitted 21 Apr 2026 Conditions
  • 06/26/0129/CD Awaiting decision

    Fleggburgh Village Hall Main Road Fleggburgh NR29 3AG

    Discharge of Condition 8 of pp. 06/24/0756/F (Construction of hard surfacing to extend the existing car park to provide an additional 37no. parking spaces, with associated landscaping, planting, CCTV and lighting) - Details of the proposed lighting

    Submitted 26 Feb 2026 Conditions

Timeline

Dates from the published record

  1. 1 Jun 2026

    Received by Great Yarmouth

  2. 17 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jul 2026

    Added to PlanIndex

  4. 12 Aug 2026

    Decision issued: CON FULLY DISCHARGED

  5. 16 Aug 2026

    Status changed to CON FULLY DISCHARGED

    Previously Undecided.

Cases linked to this one on the register

  • 06/24/0756/F Granted

    Fleggburgh Village Hall Main Road Fleggburgh Great Yarmouth NR29 3AG

    Construction of hard surfacing to extend the existing car park to provide an additional 37no. parking spaces, with associated landscaping, planting, CCTV and lighting. (Amended plans and proposal).

    Decided 30 Jan 2026 Full applications

What this grant of permission means

Great Yarmouth granted permission on 12 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Woodland Lodge Main Road A1064 Fleggburgh NR29 3AG

    06/26/0687/TRE Submitted 28 Aug 2026 0m away

    94% historically approved · decision due ~27 Oct

    Works to trees protected by Tree Preservation Order (TPO No.11 2020) - T6 (Ash) to reduce limbs that are overhanging gable end of the house by 2 metres to suitable growing points; T6 (Ash) and T5 (Beech) - reduce limbs by 2 metres that are encroaching onto garage roof to suitable growing points.

    Awaiting decision Trees
  • Beech Tree Cottage Main Road A1064 NR29 3AG

    06/25/0688/TRE Submitted 17 Aug 2025 0m away

    Works to trees protected by Tree Preservation Order (TPO No.10 1991) - Group G1 (Leylandii conifers) - fell 11no. trees (T1 - T11).

    Granted Trees
  • The Hyde Main Road A1064 NR29 3AG

    06/25/0645/CD Submitted 7 Aug 2025 0m away

    Discharge of Condition 6 of pp. 06/22/0895/F (Proposed erection of 3 glamping pods to the front garden of The Hyde) - Details of vehicle access widening

    Granted Conditions
  • The Hyde Main Road A1064 Fleggburgh Norfolk NR29 3AG

    06/25/0646/CD Submitted 7 Aug 2025 0m away

    Discharge of Condition 7 of pp. 06/22/0895/F (Proposed erection of 3 glamping pods to the front garden of The Hyde) - Details of visibility splays

    Withdrawn Conditions
  • The Hyde Main Road A1064 Fleggburgh Norfolk NR29 3AG

    06/25/0647/CD Submitted 7 Aug 2025 0m away

    Discharge of Condition 10 of pp. 06/22/0895/F (Proposed erection of 3 glamping pods to the front garden of The Hyde) - Details of access/on-site car parking and loading areas

    Withdrawn Conditions
  • The Hyde Main Road A1064 Fleggburgh Norfolk NR29 3AG

    06/25/0648/CD Submitted 7 Aug 2025 0m away

    Discharge of Condition 11 of pp. 06/22/0895/F (Proposed erection of 3 glamping pods to the front garden of The Hyde) - Details of water consumption

    Granted Conditions

In Great Yarmouth

  • 06/25/1007/CD Granted

    St Olaves Caravan Park Priory Farm Beccles Road NR31 9HE

    Discharge of Condition 3 parts B & C of pp 06/22/1006/F (Proposed change of use of land to a touring caravan park) ; Submission of site investigation and post investigation assessment

    24 Nov 2025 Conditions
  • 06/26/0522/CD Granted

    Land off Kings Drive and Marjoram Road Bradwell Great Yarmouth NR31 8TF

    Discharge of Condition 9 (Details of Foul Drainage Scheme) of pp. 06/23/0669/F (Erection of 29 dwellings, access, parking and associated external works.).

    24 Jun 2026 Conditions
  • 06/26/0318/CD Refused

    Shrublands Farmhouse Magdalen Way Gorleston Great Yarmouth NR31 7BP

    Discharge of Condition 5 (External lighting) of pp. 06/23/0896/LB (Listed Building Consent for the subdivision of rooms, provision of suspended ceiling and internal corridor, blocking up existing door openings between rooms, repair, maintenance and draught proofing of existing windows, replace 7no. windows, replace doorway for a window, replace front door, update to electrics and plumbing. External works to include fenced garden play area with play equipment, air source heat pump and replacement external lighting.)

    21 Apr 2026 Conditions
  • 06/26/0317/CD Refused

    Shrublands Farmhouse Magdalen Way Gorleston Great Yarmouth NR31 7BP

    Discharge of Condition 4 (Ground floor partition walls) of pp. 06/23/0896/LB (Listed Building Consent for the subdivision of rooms, provision of suspended ceiling and internal corridor, blocking up existing door openings between rooms, repair, maintenance and draught proofing of existing windows, replace 7no. windows, replace doorway for a window, replace front door, update to electrics and plumbing. External works to include fenced garden play area with play equipment, air source heat pump and replacement external lighting.)

    21 Apr 2026 Conditions
  • 06/26/0319/CD Refused

    Shrublands Farmhouse Magdalen Way Gorleston Great Yarmouth NR31 7BP

    Discharge of Condition 6 (Internal lighting and electrical installations) of pp. 06/23/0896/LB (Listed Building Consent for the subdivision of rooms, provision of suspended ceiling and internal corridor, blocking up existing door openings between rooms, repair, maintenance and draught proofing of existing windows, replace 7no. windows, replace doorway for a window, replace front door, update to electrics and plumbing. External works to include fenced garden play area with play equipment, air source heat pump and replacement external lighting.)

    21 Apr 2026 Conditions