Planning application
Aeropak Distribution Centre Gapton Hall Industrial Estate Great Yarmouth NR31 0NU
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed raising of height of the portal frame storage area at the west to match the height at the east of the building; Installation of insulated metal cladding to existing storage area; Installation of canopy area over existing hardstanding; New barrier and pedestrian gate
As published by the council, reference 06/23/0030/F
Application record
- Reference
- 06/23/0030/F
- Type
- Full
- Status
- APPROVE Conditions/Reasons
- Decision
- APPROVE
- Received
- 16 Jan 2023
- Validated
- 24 Jan 2023
- Decided
- 17 Apr 2023
- Parish
- Bradwell North
- Postcode
- NR31 0NU
Timeline
Dates from the published record
-
16 Jan 2023
Received by Great Yarmouth
-
24 Jan 2023
Validated
Checked as complete and ready for consideration.
-
17 Apr 2023
Decision issued: APPROVE
-
18 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
1 Viking Road (Former Aeropak) Gapton Hall Estate Bradwell Great Yarmouth NR31 0NU
Proposed change of use of part of first floor from offices to laboratory; installation of ventilation and extraction systems
Granted Full applications 21 docs -
Aeropak (Chemical Products) Ltd Viking Road Gapton Hall Industrial Estate Great Yarmouth NR31 0NU
Proposed variation to condition 2 relating to pp 06/23/0030/F (Raised height of the frame storage; Installation of metal cladding; Installation of canopy; New barrier and pedestrian gate) - Revised loading area and new extension in lieu of approved canopy
Granted Full applications Extension 8 docs -
Aeropak (Chemical Product) Viking Road Gapton Hall Industrial Estate Great Yarmouth NR31 0NU
Proposed single storey enclosed plant room and raised gantry (including chiller units).
Granted Full applications 20 docsSmall domestic -
Aeropak Chemical Products Ltd Viking Road Bradwell Great Yarmouth NR31 0NU
Erection of a plant enclosure building to house bulk containers of material manufacturing of pharmaceutical products.
Granted Full applications 11 docs -
Yare Shipping Stores Hewett Road Bradwell NR31 0NN
Single storey extension to south west elevation to provide bespoke cold store to existing warehouse and distribution facility.
Granted Full applications Extension 18 docsSmall domestic -
1 Hewett Road Bradwell NR31 0NN
84% historically approved · decision due ~8 Oct
Change to surfacing material of external storage yard and loading area: removing existing gravel and replacing with concrete pads, concrete access links and permeable paving; Associated regrading and landscaping.
Awaiting decision Full applications 41 docs
Other full applications applications
In Great Yarmouth
-
06/25/0529/VCF Granted
Hillcrest Heath Road St Olaves Fritton And St Olaves NR31 9HL
Variation of Conditions 4 and 5 of pp 06/23/0496/HH (Demolition of existing two-storey extensions, helicopter shed and surrounding ancillary buildings; Erection of new two-storey extensions; New swimming pool, gym and home leisure building; Replacement garage) - Amendments to Biodiversity Enhancement Method Statement and Construction Environmental Management Plan and proposed amendment to the location and design of the approved freestanding bat house.
-
06/26/0674/VCF Awaiting decision
67 Second Avenue Caister-on-sea NR30 5NW
Removal / Variation of condition 2 of PP 06/26/0325/H (Construction of single-storey side and rear extensions, and a replacement dormer to front roof slope). To allow for alterations to previously approved front and rear dormers.
-
06/26/0665/F Awaiting decision
2 Campion Avenue Gorleston Great Yarmouth NR31 7NB
Subdivision of existing residential curtilage to create a separate residential plot and an attached 2-bedroom residential dwelling.
-
06/26/0662/VCF Awaiting decision
Haven Seashore Holiday Park Caister-on-Sea NR30 4HG
Proposed Variation of Condition 1 (Occupation dates) of pp 06/98/0607/F (Seashore caravan park)
-
06/26/0630/VCF Withdrawn
Playing Field, Fleggburgh Village Hall Main Road A1064 Fleggburgh NR29 3AG
Variation of Condition 7 (Car park extension surfacing material) of pp 06/24/0756/F (Construction of hard surfacing to extend the existing car park to provide an additional 37no. parking spaces), to allow the use of mechanically rolled permeable tarmac rather than tarmac planings.