Planning application
Tilbury Power Station Fort Road Tilbury Essex
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Adjacent Authority Application for a Development Consent Order for Norwich to Tilbury. It is proposed by National Grid to upgrade the electricity transmission system in East Anglia between Norwich and Tilbury. The Project includes a new 400 kilovolt (kv) electricity transmission connection of approximately 184 kilometres (km) in overall length from Norwich Main Substation and Tilbury Substation via Bramford Substation.
As published by the council, reference 20240538
Application record
- Reference
- 20240538
- Type
- Adjoining Authorities Application
- Status
- Pending Decision
- Decision
- Observations Sent
- Received
- 5 Jun 2024
- Validated
- 5 Jun 2024
- Decided
- 28 Jun 2024
- Decision by
- Delegated Decision
Site history
Applications at this address on the Gravesham register
This site has had 2 applications since 2024.
-
20260376 Awaiting decision
Tilbury Power Station Fort Road Tilbury Essex
Adjacent Authority Application for an amendment to Development Consent Order for Norwich to Tilbury. It is proposed by National Grid to upgrade the electricity transmission system in East Anglia between Norwich and Tilbury. The Project includes a new 400 kilovolt (kv) electricity transmission connection of approximately 184 kilometres (km) in overall length from Norwich Main Substation and Tilbury Substation via Bramford Substation.
Timeline
Dates from the published record
-
5 Jun 2024
Received by Gravesham
-
28 Jun 2024
Decision issued: Observations Sent
-
12 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Gravesham has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Gravesham's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Land Part Of Tilbury Energy Centre (Tilbury 3) Fort Road Tilbury Essex
83% historically approved · decision due ~25 Jul
Hybrid planning application, comprising (1) in the Outline element the following phased development: B2 General Industrial and B8 Storage & Distribution including external storage and ancillary offices, Port-related uses including general haulier parking and a CMAT (Construction Materials and Aggregates Terminal); AND (2) in the Full element the following enabling infrastructure and other works: access and Port estate roads, a rail terminal connecting to the Tilbury2 railway siding, land re-grading and development platforms, utilities, drainage and ecological mitigation.
Awaiting decision Full applications 245 docs -
Land Part Of Tilbury Energy Centre (Tilbury 3) Fort Road Tilbury Essex
Request for Scoping Opinion - Regulation 15 Of The Town And Country Planning (Environmental Impact Assessment) Regulations 2017 (As Amended) at Land At Tilbury3, Port Of Tilbury London Limited (Potll)
Decided Outline 11 docs -
Land To The South Of National Grids Electrical Substation For New Cable Tunnel Fort Road Tilbury Essex
Application for the approval of details reserved by condition no. 16 (Barge Movements) of planning permission ref 25/01480/CV (Application for the variation of condition no. 16 (Barge Movements) of planning permission ref. 25/00746/CV (Application for the variation of condition nos. 16 (Spoil Removal) and 17 (Barge Movements) of planning permission ref. 23/01502/FUL.)
Granted Conditions 4 docs