Planning application

73A Grange Road Gravesend Kent DA11 0ET

Granted Gravesham 20210826 Full Planning Application

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application for variation of condition 2 attached to planning permission reference no. 20161021 for demolition of existing garage and erection of 2no. double garages and a two bedroom self-contained apartment above, to allow: change of approved drawing from 5008_D8.02 to D8.02A to add photovoltaic panels at roof level.

As published by the council, reference 20210826

Application record

Reference
20210826
Type
Full Planning Application
Status
Application Permitted
Decision
Permitted
Received
29 Jun 2021
Validated
29 Jun 2021
Decided
16 Aug 2021
Ward
Pelham
Parish
Non-Parish Area
Decision by
Delegated Decision
Postcode
DA11 0ET

Timeline

Dates from the published record

  1. 29 Jun 2021

    Received by Gravesham

  2. 16 Aug 2021

    Decision issued: Permitted

  3. 20 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 49 St James Avenue Gravesend Kent DA11 0EZ

    20260135 Submitted 30 Jan 2026 81m away

    Application for the approval of condition 3 (Gas Impermeable Membrane) attached to planning reference number 20250893

    Granted Conditions 5 docs
  • 49 St James Avenue Gravesend Kent DA11 0EZ

    20250893 Submitted 5 Sep 2025 81m away

    Demolition of existing garage. Erection of single storey side extension with a pitched roof.

    Granted Householder Extension Demolition 10 docs
    Small domestic
  • Bronte School Nursery 21 Pelham Road Gravesend Kent DA11 0HU

    20251248 Submitted 8 Dec 2025 110m away

    Works to trees in a Conservation Area; Cutting back of overhanging growth from Leyland Cypress Trees adjacent to the car park.

    Granted Trees 3 docs
  • 56 St James Avenue Gravesend Kent DA11 0EY

    20240535 Submitted 14 Jun 2024 127m away

    Application for a Lawful Development Certificate in respect of the change of Use From Residential C3 To Children's Home Care Centre C3(b).

    Granted Lawful development 10 docs
  • 21 Grange Road Gravesend Kent DA11 0ET

    20230191 Submitted 2 Mar 2023 143m away

    Erection of part first floor rear extension.

    Refused Full applications Extension 8 docs
  • 2 Pelham Road Gravesend Kent DA11 0HW

    20260368 Submitted 8 Apr 2026 157m away

    85% historically approved · decision due ~22 Jun

    Erection of a single storey rear extension.

    Decided Extension
    Small domestic

In Gravesham

  • 20250763 Granted

    Land At Dalefield Way (East) Gravesend Kent DA12 2FL

    Change of use of the land for open storage (B8 use) primarily for equipment and operations related to Dalefield Way Industrial Park (B8 use) with associated installation of hardstanding/surface treatment, security fencing/gates, access, a soft landscaping mound, and erection of temporary office cabins.

    29 Jul 2025 Full applications
  • 20250558 Granted

    East Court Farm Church Lane Gravesend Kent

    Installation of 7 no. glamping pods/retreats and 4 no. barrel saunas with cold plunge for overnight guest use, external decking areas, permeable footpaths and vehicular track, parking and turning area, secure cycle storage and recycling/refuse storage, 2 no. private package treatment plants, landscaping and associated works.

    5 Jun 2025 Full applications
  • 20250258 Granted

    Dering Industrial Park Dering Way Gravesend Kent

    Application for variation of condition 2 attached to planning permission reference number 20160114 for change of use of land to Use Class B8 Storage and Distribution together with formation of new access road; to allow for changes to the scale and siting of the approved B8 use class Plots (A, B, C, D and E) informed by the current layouts of occupied Plots A and B, Re-siting the approved shared central roadway via the existing security gate adjacent to Plot B, the central roadway would now be shared solely by Plots B, C, D and E with Plot A retaining independent gated access from the approved access road, as built and some changes to the siting of installations within each plot (e.g. septic tank, refuse points, noticeboards) to better suit the proposed layout and some changes to the siting of slot drains and storm water attenuation sites to better suit the proposed layout.

    19 Mar 2025 Full applications
  • 20251290 Granted

    Land Between Adjacent To 2 Gore Green Cottages Gore Green Road Higham Rochester Kent

    Erection of a detached 2 bedroom custom self build bungalow

    22 Dec 2025 Full applications
  • 20250730 Granted

    Land Adjacent To Thames Way Northfleet Gravesend Kent DA11 8HL

    Installation of electricity infrastructure including a battery energy storage system, sub station and ancillary electrical infrastructure and creation of a new vehicular access to the A226.

    21 Jul 2025 Full applications