Planning application
25/00345/FULL
37 - 39 Mumby Road Gosport Hampshire PO12 1AA
Proposal
CONVERSION OF EXISTING OFFICE BUILDING INTO 6 FLATS, ERECTION OF SINGLE STOREY FRONT EXTENSION WITH BALCONY, WITH ASSOCIATED CAR PARKING, CYCLE AND REFUSE STORAGE (as amended by plans received 23.04.26 and 20.05.26)
As published by the council, reference 25/00345/FULL
Timeline
Dates from the published record
-
20 Nov 2025
Received by Gosport
-
2 Dec 2025
Validated
Checked as complete and ready for consideration.
-
5 Jun 2026
Decision issued: Grant Permission
-
25 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00122/FULL Awaiting decision
60 - 61 High Street Gosport Hampshire PO12 1DR
ERECTION OF EXTENSION TO FORM SECOND FLOOR, RETENTION OF GROUND FLOOR COMMERCIAL UNIT (CLASS E) AND USE OF THE REMAINDER OF THE BUILDING AS A 12-BEDROOM (14 PERSON) HOUSE IN MULTIPLE OCCUPATION (HMO) (SUI GENERIS), INCLUDING ASSOCIATED ALTERATIONS (CONSERVATION AREA) (as amended by information received 08.07.26)
-
26/00156/ADVT Granted
94 High Street Gosport Hampshire PO12 1DS
ERECTION AND DISPLAY OF REPLACEMENT OF NON-ILLUMINATED PROJECTING SIGN (CONSERVATION AREA)
-
26/00059/ADVT Granted
84 - 86 High Street Gosport Hampshire PO12 1DS
INSTALLATION OF 2NO. INTERNALLY ILLUMINATED FASCIA SIGNS AND 6NO. VINYL WINDOW GRAPHICS (CONSERVATION AREA)
-
25/00248/MAGDO Refused
101 High Street Gosport Hampshire PO12 1DS
GPDO PART 3 NOTIFICATION - CONVERSION OF PART GROUND FLOOR COMMERCIAL UNIT (CLASS E) TO FORM ONE DWELLING (CLASS C3) (CONSERVATION AREA)
-
25/00269/DEMO Granted
Police Station South Street Gosport Hampshire PO12 1ES
GPDO PART 11 NOTIFICATION - DEMOLITION OF WESTERN WING OF BUILDING FRONTING THORNGATE WAY
-
26/00051/FULL Awaiting decision
Police Station South Street Gosport Hampshire PO12 1ES
EXTERNAL ALTERATIONS TO FACILITATE REFURBISHMENT OF POLICE STATION INCLUDING REPLACEMENT WINDOWS, ALTERATIONS TO BOUNDARY TREATMENTS, INSTALLATION OF LIGHTING, CCTV, ACCESS RAMPS AND SOLAR PANELS (ADJACENT TO CONSERVATION AREA) (as amplified and amended by plans and information received 23.04.26, 21.05.26, 15.06.26, 23.06.26 and 01.07.26)
Other full applications applications
In Gosport
-
26/00034/FULL Refused
59 Whitworth Road Gosport Hampshire PO12 3NJ
CONSTRUCTION OF GARAGE WITH ANCILLARY ACCOMMODATION AT ROOF LEVEL
-
26/00164/FULL Granted
6 Eastcliff Close Lee-On-The-Solent Hampshire PO13 9JT
CONSTRUCTION OF SINGLE-STOREY REAR EXTENSION, ALTERATION & CONVERSION OF GARAGE TO FORM HABITABLE ACCOMMODATION AND ALTERATIONS TO INCLUDE CHANGES TO FENESTRATION, INSTALLATION OF FRONT PORCH, CLADDING, RENDERING & PLINTH DETAIL
-
26/00157/FULL Granted
32 Gorran Avenue Gosport Hampshire PO13 0NF
ERECTION OF FRONT AND REAR DORMER WINDOWS (as amended by plans received 02.07.26)
-
26/00211/FULL Awaiting decision
3 Shell Pier Cottages Hayling Close Gosport Hampshire PO12 4JS
SINGLE STOREY SIDE / REAR EXTENSION
-
26/00175/FULL Granted
38 Western Way Gosport Hampshire PO12 2NQ
ERECTION OF REPLACEMENT FRONT BOUNDARY WALL (as amended by plan received 26.06.26)