Skip to content
PlanIndex Get alerts
Menu

Planning application

29 Windsor Road Gosport Hampshire PO12 3QT

Granted Gosport 24/00280/FULL Devt. app. FULL

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

ERECTION OF SINGLE STOREY REAR EXTENSION AND SUMMER HOUSE (RETROSPECTIVE)

As published by the council, reference 24/00280/FULL

Application record

Reference
24/00280/FULL
Type
Devt. app. FULL
Status
Grant Permission
Decision
Grant Permission
Received
27 Aug 2024
Validated
7 Nov 2024
Decided
9 Dec 2024
Ward
Leesland And Newtown
Decision by
Delegated Decision
Postcode
PO12 3QT

Timeline

Dates from the published record

  1. 27 Aug 2024

    Received by Gosport

  2. 7 Nov 2024

    Validated

    Checked as complete and ready for consideration.

  3. 9 Dec 2024

    Decision issued: Grant Permission

  4. 21 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Arreton Court Smith Street Gosport Hampshire PO12 3PE

    25/00162/FULL Submitted 20 May 2025 99m away

    ERECTION OF TWO-STOREY EXTENSION TO FORM 5NO. FLATS WITH ASSOCIATED PARKING, CYCLES AND REFUSE STORAGE, FOLLOWING DEMOLITION OF EXISTING GARAGE BLOCKS (as amended by further details received 11.2.26)

    Refused Full applications New dwelling Extension +1 73 docs
    Several homes
  • 117 Whitworth Road Gosport Hampshire PO12 3NL

    26/00194/FULL Submitted 17 Jun 2026 132m away

    95% historically approved · decision due ~18 Aug

    ERECTION OF SINGLE STOREY REAR EXTENSION

    Awaiting decision Full applications Extension
    Small domestic
  • 26 Lyndhurst Road Gosport Hampshire PO12 3QY

    26/00217/FULL Submitted 10 Jul 2026 178m away

    95% historically approved · decision due ~4 Sep

    ERECTION OF SINGLE STOREY EXTENSION, FRONT PORCH AND FRONT AND REAR DORMERS

    Awaiting decision Full applications Extension Loft or dormer
    Small domestic
  • 7 Tintern Road Gosport Hampshire PO12 3QN

    24/00344/FULL Submitted 17 Oct 2024 192m away

    ERECTION OF FRONT DORMER WINDOW (as amended by plan received 12.11.24)

    Granted Full applications Loft or dormer Windows or glazing 9 docs
  • 42A Whitworth Road Gosport Hampshire PO12 3NN

    25/00363/MAGDO Submitted 11 Dec 2025 211m away

    GPDO PART 3 NOTIFICATION - CONVERSION OF PART GROUND FLOOR COMMERCIAL UNIT (CLASS E) TO FORM 1NO. ONE BEDROOMED FLAT (CLASS C3)

    Granted Prior approval 9 docs
  • 9 Vernon Road Gosport Hampshire PO12 3NT

    21/00288/FULL Submitted 24 May 2021 214m away

    ERECTION OF FRONT AND REAR DORMERS

    Granted Full applications Loft or dormer 16 docs

In Gosport

  • 26/00261/FULL Awaiting decision

    28 Bury Road Gosport Hampshire PO12 3UD

    EXTENSION OF DROPPED KERB TO PROVIDE VEHICULAR ACCESS ONTO CLASSIFIED ROAD (LISTED BUILDING IN CONSERVATION AREA)

    28 Aug 2026 Full applications
  • 26/00259/FULL Awaiting decision

    Utterson House 61 Frater Lane Gosport Hampshire PO12 4AU

    RETENTION OF AND CONTINUED WORKS FOR THE ERECTION OF BOUNDARY WALL

    25 Aug 2026 Full applications
  • 26/00154/FULL Granted

    Eastern House Crescent Road Gosport Hampshire PO12 2DJ

    ERECTION OF GARDEN STUDIO, CAR PORT AND BOUNDARY GATES AND RAILINGS (LISTED BUILDING IN CONSERVATION AREA)

    5 May 2026 Full applications
  • 26/00248/FULL Awaiting decision

    52 Bayntun Drive Lee-on-the-solent Hampshire PO13 9JY

    CONSTRUCTION OF FRONT PORCH

    11 Aug 2026 Full applications
  • 26/00244/FULL Awaiting decision

    Rear Of 22 Kings Road Lee-on-the-solent Hampshire PO13 9NU

    ERECTION OF DETACHED SINGLE STOREY DWELLING

    10 Aug 2026 Full applications