Planning application
EDF Energy Ltd 7 Barnett Way Gloucester GL4 3RS
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Screening opinion for Environmental Impact Assessment (Proposed redevelopment of the existing office campus for residential and employment use)
As published by the council, reference 25/01152/EIA
Application record
- Reference
- 25/01152/EIA
- Type
- EIA when not attached to an application
- Status
- Registered
- Decision
- Issue EIA Screening Opinion
- Received
- 12 Dec 2025
- Validated
- 12 Dec 2025
- Decided
- 27 Jan 2026
- Ward
- Barnwood
- Decision by
- Delegated Decision
- Postcode
- GL4 3RS
Site history
Applications at this address on the Gloucester register
This site has had 6 applications since 2020: 4 approved, 0 refused.
-
26/00316/OUT Status unknown
EDF Energy Ltd 7 Barnett Way Gloucester GL4 3RS
Outline planning application with all matters reserved apart from access for the development of up to 281 new homes (Use Class C3) in a mix of houses and apartments; up to 8,000 sqm of new employment floorspace (Use Classes E(g)/B2/B8); following demolition of existing buildings and retention of others. Associated works include infrastructure, public open space, play area, leisure facilities, landscaping and ancillary engineering works.
-
21/00766/FUL Granted
EDF Energy Ltd 7 Barnett Way Gloucester GL4 3RS
Erection of plant room at roof level, installation of back-up generator and fuel tank within existing external compound and alterations to existing office building including: replacement of existing window on north elevation with a roller-shutter door; and demolition of existing first floor walkway to the south elevation
-
20/01112/FUL Granted
EDF Energy Ltd 7 Barnett Way Gloucester GL4 3RS
Replacement to the roof of an existing Canopy / walkway. Supporting structure to be retained.
-
20/00429/PRD Granted
EDF Energy Ltd 7 Barnett Way Gloucester GL4 3RS
Prior approval for the installation of one above ground fuel tank.
-
20/00431/PRD Granted
EDF Energy Ltd 7 Barnett Way Gloucester GL4 3RS
Prior Approval for the installation of three fuel tanks to the North East of the Barn 2 building at EDF Barnwood.
Timeline
Dates from the published record
-
12 Dec 2025
Received by Gloucester
-
27 Jan 2026
Decision issued: Issue EIA Screening Opinion
-
27 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Gloucester has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
EDF Energy Ltd 7 Barnett Way Gloucester GL4 3RS
Prior approval for the installation of one above ground fuel tank.
Granted 7 docs -
EDF Energy Ltd 7 Barnett Way Gloucester GL4 3RS
Prior Approval for the installation of three fuel tanks to the North East of the Barn 2 building at EDF Barnwood.
Granted 10 docs -
EDF Energy Ltd 7 Barnett Way Gloucester GL4 3RS
Erection of plant room at roof level, installation of back-up generator and fuel tank within existing external compound and alterations to existing office building including: replacement of existing window on north elevation with a roller-shutter door; and demolition of existing first floor walkway to the south elevation
Granted Full applications Demolition Windows or glazing 16 docs -
EDF Energy Ltd 7 Barnett Way Gloucester GL4 3RS
84% historically approved · decision due ~4 Aug
Outline planning application with all matters reserved apart from access for the development of up to 281 new homes (Use Class C3) in a mix of houses and apartments; up to 8,000 sqm of new employment floorspace (Use Classes E(g)/B2/B8); following demolition of existing buildings and retention of others. Associated works include infrastructure, public open space, play area, leisure facilities, landscaping and ancillary engineering works.
Status unknown Outline New dwelling Demolition 134 docs -
EDF Energy Ltd 7 Barnett Way Gloucester GL4 3RS
Replacement to the roof of an existing Canopy / walkway. Supporting structure to be retained.
Granted Full applications 12 docs -
197 Barnwood Road Gloucester GL4 3HW
Demolition of existing rear porch and replacement with single storey rear extension. New porch to be constructed at front elevation.
Granted Full applications Extension Demolition 16 docsSmall domestic
Other outline applications
In Gloucester
-
26/00877/OUT Awaiting decision
Griggs Timber Company 276 Bristol Road Gloucester GL1 5TD
Outline planning application for demolition of existing buildings and structures, and redevelopment for residential (C3 Use Class) of up to 80no. dwellings with parking, refuse and recycling storage, landscaping, engineering and all other associated works (all matters reserved other than access to the site).
-
26/00824/PIP Status unknown
Land To The Rear Of 119 Tredworth Road Gloucester GL1 4QU
New dwelling to replace garage block
-
26/00408/PDE Granted
85 Seymour Road Gloucester GL1 5PT
Single storey rear extension (6m x 3m x 3m)
-
26/00305/PDE Granted
127 Tuffley Lane Gloucester GL4 0PA
Demolition of existing rear extension & erection of rear extension measuring 4.67m (depth) x 3.85m (maximum height) x 2.55m (eaves height)
-
26/00323/PDE Refused
21 Massey Road Gloucester GL1 4LG
Single storey rear extension measuring 5.1m wide x 6m long. Brickwork to be matched as close to existing as possible. Windows and rainwater pipe - uPVC Flat roof