Skip to content
PlanIndex Get alerts
Menu

Planning application

57 Marlstone Close Gloucester GL4 6ES

Granted Gloucester 24/00709/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed porch

As published by the council, reference 24/00709/FUL

Application record

Reference
24/00709/FUL
Type
Full Application
Status
Decided
Decision
Grant for 3 years
Received
20 Sep 2024
Validated
21 Sep 2024
Decided
18 Oct 2024
Ward
Matson, Robinswood & White City
Postcode
GL4 6ES

Timeline

Dates from the published record

  1. 20 Sep 2024

    Received by Gloucester

  2. 21 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 18 Oct 2024

    Decision issued: Grant for 3 years

  4. 23 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

87 applications on PlanIndex · across 3 councils · 83% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 3 Marlstone Close Gloucester GL4 6ES

    26/00255/FUL Submitted 18 Mar 2026 110m away

    Single Storey Rear Extension

    Granted Full applications Extension 16 docs
    Small domestic
  • Regeneration Of Matson Estate Matson Lane Gloucester

    20/00362/EIA Submitted 8 Apr 2020 139m away

    EIA screening

    Withdrawn Outline 3 docs
  • Gloucester Robinswood Hotel Matson Lane Gloucester GL4 6EA

    24/00108/TPO Submitted 13 Feb 2024 155m away

    See works schedule attached which includes tree identifier to plan, genus, works specification and justification. Additional assessment details are stated in assessment covering letter. The TPO is an area order with plan based on old landmarks. It is not possible to differentiate between trees directly subject the order at the site and those that are not. Therefore all works to trees are included for the current site, this includes some beyond the scope of TPO's. T46 will separately be submitted as a 5 day notification with additional supporting material. No replacement trees are recommended due to density of existing trees (older and younger than the TPO's date). If required more tree assessment detail can be submitted to aid the Authorities determination process, in the form of a spreadsheet. However given the type of information included this will not be for the public register.

    Decided Trees 4 docs
  • 40 Larkham Close Gloucester GL4 6EN

    25/00729/LAW Submitted 19 Aug 2025 206m away

    Single storey rear extension

    Granted Lawful development Extension 8 docs
    Small domestic
  • Robinswood Inn Matson Avenue Gloucester GL4 6LJ

    23/00188/CONDIT Submitted 3 Mar 2023 230m away

    84% historically approved · decision due ~28 Apr

    Partial discharge of conditions 7 (replacement planting), 8 (tree and hedge planting), 12 (home information pack), 13 (boundary treatment), 17 (foul drainage), 18 (bin storage), 20 (car parking areas), 21 (cycle parking) of outline planning permission 20/00847/OUT and condition 5 of reserved matters permission 22/00278/REM

    Status unknown Conditions Trees 6 docs
  • Robinswood Inn Matson Avenue Gloucester GL4 6LJ

    22/01050/CONDIT Submitted 20 Oct 2022 236m away

    Discharge of condition 06, 10, 14 & 16 (Samples of materials, Submission of details for Trees/Hedgerow Protection Measures, Construction and Environmental Management Plan and Surface water drainage) for planning permission 20/00847/OUT (Construction of four dwellings and six apartments.- Outline planning application with all matters reserved)

    Decided Conditions New dwelling Trees
    Several homes

In Gloucester

  • 26/00808/FUL Awaiting decision

    2 Birchall Avenue Gloucester GL4 6LW

    Extension to rear of property with internal alterations

    4 Sep 2026 Full applications
  • 26/00792/FUL Awaiting decision

    10 Gainsborough Drive Gloucester GL4 0QR

    Proposed Extension and alteration to property

    28 Aug 2026 Full applications
  • 26/00790/FUL Awaiting decision

    160 Stroud Road Gloucester GL1 5JX

    Retrospective application for the erection of a Sun-Room.

    28 Aug 2026 Full applications
  • 26/00788/FUL Awaiting decision

    14 Fieldcote Drive Gloucester GL3 3EW

    Replace existing garage flat roof with pitched roof

    27 Aug 2026 Full applications
  • 26/00787/FUL Awaiting decision

    51 Dinglewell Gloucester GL3 3HP

    Loft Conversion

    26 Aug 2026 Full applications