Planning application
57 Marlstone Close Gloucester GL4 6ES
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed porch
As published by the council, reference 24/00709/FUL
Application record
- Reference
- 24/00709/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant for 3 years
- Received
- 20 Sep 2024
- Validated
- 21 Sep 2024
- Decided
- 18 Oct 2024
- Ward
- Matson, Robinswood & White City
- Postcode
- GL4 6ES
Timeline
Dates from the published record
-
20 Sep 2024
Received by Gloucester
-
21 Sep 2024
Validated
Checked as complete and ready for consideration.
-
18 Oct 2024
Decision issued: Grant for 3 years
-
23 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice
87 applications on PlanIndex · across 3 councils · 83% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
3 Marlstone Close Gloucester GL4 6ES
Single Storey Rear Extension
Granted Full applications Extension 16 docsSmall domestic -
-
Gloucester Robinswood Hotel Matson Lane Gloucester GL4 6EA
See works schedule attached which includes tree identifier to plan, genus, works specification and justification. Additional assessment details are stated in assessment covering letter. The TPO is an area order with plan based on old landmarks. It is not possible to differentiate between trees directly subject the order at the site and those that are not. Therefore all works to trees are included for the current site, this includes some beyond the scope of TPO's. T46 will separately be submitted as a 5 day notification with additional supporting material. No replacement trees are recommended due to density of existing trees (older and younger than the TPO's date). If required more tree assessment detail can be submitted to aid the Authorities determination process, in the form of a spreadsheet. However given the type of information included this will not be for the public register.
Decided Trees 4 docs -
40 Larkham Close Gloucester GL4 6EN
Single storey rear extension
Granted Lawful development Extension 8 docsSmall domestic -
Robinswood Inn Matson Avenue Gloucester GL4 6LJ
84% historically approved · decision due ~28 Apr
Partial discharge of conditions 7 (replacement planting), 8 (tree and hedge planting), 12 (home information pack), 13 (boundary treatment), 17 (foul drainage), 18 (bin storage), 20 (car parking areas), 21 (cycle parking) of outline planning permission 20/00847/OUT and condition 5 of reserved matters permission 22/00278/REM
Status unknown Conditions Trees 6 docs -
Robinswood Inn Matson Avenue Gloucester GL4 6LJ
Discharge of condition 06, 10, 14 & 16 (Samples of materials, Submission of details for Trees/Hedgerow Protection Measures, Construction and Environmental Management Plan and Surface water drainage) for planning permission 20/00847/OUT (Construction of four dwellings and six apartments.- Outline planning application with all matters reserved)
Decided Conditions New dwelling TreesSeveral homes
Other full applications applications
In Gloucester
-
26/00808/FUL Awaiting decision
2 Birchall Avenue Gloucester GL4 6LW
Extension to rear of property with internal alterations
-
26/00792/FUL Awaiting decision
10 Gainsborough Drive Gloucester GL4 0QR
Proposed Extension and alteration to property
-
26/00790/FUL Awaiting decision
160 Stroud Road Gloucester GL1 5JX
Retrospective application for the erection of a Sun-Room.
-
26/00788/FUL Awaiting decision
14 Fieldcote Drive Gloucester GL3 3EW
Replace existing garage flat roof with pitched roof
-
26/00787/FUL Awaiting decision
51 Dinglewell Gloucester GL3 3HP
Loft Conversion