Skip to content
PlanIndex Get alerts
Menu

Planning application

35 Church Drive Ravenshead Nottinghamshire NG15 9FG

Granted Gedling 2026/0503

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Refurbishment and extension of existing dwelling to create additional habitable space and alter the building aesthetic

As published by the council, reference 2026/0503

Application record

Reference
2026/0503
Status
Decided
Decision
Conditional Permission
Received
23 Jul 2026
Validated
23 Jul 2026
Decided
14 Sep 2026
Ward
Newstead Abbey Ward 2015
Parish
Ravenshead Parish
Postcode
NG15 9FG

Timeline

Dates from the published record

  1. 23 Jul 2026

    Received by Gedling

  2. 26 Jul 2026

    Added to PlanIndex

  3. 14 Sep 2026

    Decision issued: Conditional Permission

  4. 14 Sep 2026

    Status changed to Decided

    Previously Awaiting decision.

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

  • Application form - without personal data Application Form · 22 Jul 2026
  • The location plan Site Location Plan · 22 Jul 2026
  • Site locations & block plan Drawings · 22 Jul 2026
  • Proposed elevations Drawings · 22 Jul 2026
  • Proposed elevations Drawings · 22 Jul 2026
  • Block plan of the site Drawings · 22 Jul 2026
  • Floor plan Drawings · 22 Jul 2026
  • Floor plan Drawings · 22 Jul 2026
  • Site/block plan - existing Drawings · 22 Jul 2026
  • Floor plan - existing Drawings · 22 Jul 2026
  • Existing elevations Drawings · 22 Jul 2026
  • Existing elevations Drawings · 22 Jul 2026
  • 3d views Drawings · 22 Jul 2026
  • Design and access statement Design & Access Statement · 22 Jul 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Gedling granted permission on 14 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Gedling's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres