Skip to content
PlanIndex Get alerts
Menu

Planning application

Richard Herrod Leisure Centre Foxhill Road Central Carlton Nottinghamshire NG4 1RL

Awaiting decision Gedling 2026/0501

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Full planning application for the erection of a leisure and community centre (Use Class E and F2) with associated access, parking, landscaping and drainage

As published by the council, reference 2026/0501

Application record

Reference
2026/0501
Status
Awaiting decision
Received
22 Jul 2026
Validated
24 Jul 2026
Ward
Carlton Hill Ward 2015
Postcode
NG4 1RL

Site history

Applications at this address on the Gedling register

This site has had 2 applications since 2026: 1 approved, 0 refused.

  • 2026/0490 Granted

    Richard Herrod Leisure Centre Foxhill Road Central Carlton Nottinghamshire NG4 1RL

    Demolition of the existing main Leisure Centre building and associated structures on the site

    Decided 13 Aug 2026

Timeline

Dates from the published record

  1. 22 Jul 2026

    Received by Gedling

  2. 24 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 8 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 18 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Gedling took a median of 64 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

63 documents on file for this application

  • Highways Consultee Comments · 28 Aug 2026
  • Ground investigation report Supporting Documents · 24 Aug 2026
  • Sport england Consultee Comments · 21 Aug 2026
  • Tree officer Consultee Comments · 20 Aug 2026
  • Economic development Consultee Comments · 06 Aug 2026
  • Application form - without personal data Application Form · 21 Jul 2026
  • Air quality assessment Supporting Documents · 21 Jul 2026
  • Environment noise impact assessment Supporting Documents · 21 Jul 2026
  • Carlton active landscape plan Drawings · 21 Jul 2026
  • Site wide landscape plan Drawings · 21 Jul 2026
  • Site sections Drawings · 21 Jul 2026
  • Landscape plan (indictive levels info) Drawings · 21 Jul 2026
  • Level 00 floor plan Drawings · 21 Jul 2026
  • Existing site plan Drawings · 21 Jul 2026
  • The location plan Site Location Plan · 21 Jul 2026
  • Level 01 floor plan Drawings · 21 Jul 2026
  • Level b1 basement plan Drawings · 21 Jul 2026
  • Roof plan Drawings · 21 Jul 2026
  • Proposed site plan Drawings · 21 Jul 2026
  • Proposed elevations sheet 1 of 2 Drawings · 21 Jul 2026
  • Proposed elevations sheet 2 of 2 Drawings · 21 Jul 2026
  • Proposed sections sheet 1 of 2 Drawings · 21 Jul 2026
  • Proposed sections sheet 2 of 2 Drawings · 21 Jul 2026
  • Proposed site location plan Site Location Plan · 21 Jul 2026
  • Waste management and recycling plan Supporting Documents · 21 Jul 2026
  • Noise impact assessment Supporting Documents · 21 Jul 2026
  • Transport assessment Supporting Documents · 21 Jul 2026
  • Arboricultural method statement Supporting Documents · 21 Jul 2026
  • Cemp Supporting Documents · 21 Jul 2026
  • Bio-diversity net gain assessment Supporting Documents · 21 Jul 2026
  • Bng metrix Supporting Documents · 21 Jul 2026
  • Bng cover sheet Supporting Documents · 21 Jul 2026
  • Wheelie bin dimensions Drawings · 21 Jul 2026
  • Recycle bin Drawings · 21 Jul 2026
  • Design & access statement Design & Access Statement · 21 Jul 2026
  • Site location plan Drawings · 21 Jul 2026
  • Site analysis and context Supporting Documents · 21 Jul 2026
  • Historical site maps Drawings · 21 Jul 2026
  • Flood risk assessment & drainage strategy Supporting Documents · 21 Jul 2026
  • Flood risk assessment and drainge Supporting Documents · 21 Jul 2026
  • Flood risk assessment & drainage strategy Supporting Documents · 21 Jul 2026
  • Flood risk assessment & drainage strategy Supporting Documents · 21 Jul 2026
  • Flood risk Supporting Documents · 21 Jul 2026
  • Flood risk Supporting Documents · 21 Jul 2026
  • Flood risk assessment & drainage strategy Supporting Documents · 21 Jul 2026
  • Drainage layout, utility & cctv survey, topographic survey Drawings · 21 Jul 2026
  • Utility mapping + topographic survey Drawings · 21 Jul 2026
  • Flood/drainage Drawings · 21 Jul 2026
  • Drainage info Supporting Documents · 21 Jul 2026
  • Drainage info Supporting Documents · 21 Jul 2026
  • Drainage info Supporting Documents · 21 Jul 2026
  • Local colour pallette Drawings · 21 Jul 2026
  • Site plans Drawings · 21 Jul 2026
  • Design considerations Drawings · 21 Jul 2026
  • Site plans Drawings · 21 Jul 2026
  • Design consideration - elevation Drawings · 21 Jul 2026
  • Design proposal Drawings · 21 Jul 2026
  • Design proposal Drawings · 21 Jul 2026
  • Access Drawings · 21 Jul 2026
  • Design considerations Drawings · 21 Jul 2026
  • Project overview letter Supporting Documents · 21 Jul 2026
  • Cover letter Supporting Documents · 21 Jul 2026
  • Planning statement Supporting Documents · 21 Jul 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Gedling for determination, against a statutory target of eight weeks. Over the last year Gedling's median decision took 64 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Gedling's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles