Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Chase Farm Mapperley Plains Mapperley Nottinghamshire

Granted Gedling 2023/0290DOC Approval of detail reserved by condition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Approval of details reserved by conditions 13 (surface water drainage), 14 (foul sewage) and 21 (earthworks) of planning permission 2019/0696

As published by the council, reference 2023/0290DOC

Application record

Reference
2023/0290DOC
Type
Approval of detail reserved by condition
Status
Permitted
Decision
DOC-Acceptable
Received
31 Mar 2023
Validated
31 Mar 2023
Decided
13 Nov 2025
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 31 Mar 2023

    Received by Gedling

  2. 13 Nov 2025

    Decision issued: DOC-Acceptable

  3. 22 Jul 2026

    Added to PlanIndex

  4. 16 Sep 2026

    Status changed to Permitted

    Previously Unknown.

Who's behind it

Company information only, from the register and Companies House

Tetra Tech Ltd Agent, registered in Leeds

Active · incorporated 1985 · Leeds

166 applications on PlanIndex · across 82 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

45 documents on file for this application

  • Decision notice Decision Notice · 24 Apr 2026
  • Additional drainge information Supporting Documents · 03 May 2023
  • Application form - without personal data Application Form · 30 Mar 2023
  • Gully area plan Drawings · 30 Mar 2023
  • Drained area plan Drawings · 30 Mar 2023
  • Attenuation details Drawings · 30 Mar 2023
  • Flow control chamber detail Drawings · 30 Mar 2023
  • Longitudinal sections 1 of 4 Drawings · 30 Mar 2023
  • Longitudinal sections 2 of 4 Drawings · 30 Mar 2023
  • Longitudinal sections 3 of 4 Drawings · 30 Mar 2023
  • Longitudinal sections 4 of 4 Drawings · 30 Mar 2023
  • Adoptable s104 sheet 1 of 2 Drawings · 30 Mar 2023
  • Adoptable s104 sheet 2 of 2 Drawings · 30 Mar 2023
  • S104 layout sheet 1 of 2 Drawings · 30 Mar 2023
  • S104 layout sheet 2 of 2 Drawings · 30 Mar 2023
  • Proposed drainage layout sheet 1 of 6 Drawings · 30 Mar 2023
  • Proposed drainage layout sheet 2 of 6 Drawings · 30 Mar 2023
  • Proposed drainage layout sheet 3 of 6 Drawings · 30 Mar 2023
  • Proposed drainage layout sheet 4 of 6 Drawings · 30 Mar 2023
  • Proposed drainage layout sheet 5 of 6 Drawings · 30 Mar 2023
  • Proposed drainage layout sheet 5 of 6 Drawings · 30 Mar 2023
  • Adoptable drainage construction detail Drawings · 30 Mar 2023
  • Bulk earthworks cut and fill Drawings · 30 Mar 2023
  • Bulk earthwork levels Drawings · 30 Mar 2023
  • Ground work cut and fill Drawings · 30 Mar 2023
  • Detailed ground work cut and fill Drawings · 30 Mar 2023
  • Ground levels and stock pile Drawings · 30 Mar 2023
  • Ground and reclaim strategy Supporting Documents · 30 Mar 2023
  • Table 6 Supporting Documents · 30 Mar 2023
  • Appendix 1 Supporting Documents · 30 Mar 2023
  • Bore hole log Supporting Documents · 30 Mar 2023
  • Borehole details Supporting Documents · 30 Mar 2023
  • Trial pit Supporting Documents · 30 Mar 2023
  • Borehole detail Supporting Documents · 30 Mar 2023
  • Borehole detail Supporting Documents · 30 Mar 2023
  • Trail pit Supporting Documents · 30 Mar 2023
  • Trial pit Supporting Documents · 30 Mar 2023
  • Trial pit Supporting Documents · 30 Mar 2023
  • Trial pit Supporting Documents · 30 Mar 2023
  • Bore hole log Supporting Documents · 30 Mar 2023
  • Trial pit log Supporting Documents · 30 Mar 2023
  • Certificate of analysis Supporting Documents · 30 Mar 2023
  • Certificate of analysis Supporting Documents · 30 Mar 2023
  • Table of results - appendix Supporting Documents · 30 Mar 2023
  • Ground conditions assessment Supporting Documents · 30 Mar 2023

Trade members open them from here.

Open the documents

What this grant of permission means

Gedling granted permission on 13 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Gedling

  • 2026/0610DOC Awaiting decision

    28 Church Street Arnold Nottinghamshire NG5 8FB

    Discharge of conditions 3 (Materials), 4 (Flooding and Drainage), 9 (Contamination), 13 (Construction Emissions Management Plan), 15 (BNG), 17 (HMMP). 19 (HMMP) and 23 (Construction Parking) of planning permission 2025/0329.

    3 Sep 2026 Conditions
  • 2026/0093DOC Granted

    282 Longdale Lane Ravenshead Nottinghamshire NG15 9AH

    Discharge of conditions 4 (Precautionary Working Method Statement), 5 (Wildlife Sensitive Lighting Scheme), 6 (Biodiversity Gain Plan) and 7 (Biodiversity Gain Plan) attached to planning permission 2025/0377.

    13 Feb 2026 Conditions
  • 2025/0835DOC Granted

    Land South Of Main Street Calverton Nottinghamshire

    Discharge of Condition 2 (External Materials), Condition 5 (Landscaping Scheme), and Condition 6 (Boundary Treatments) of planning permission 2024/0217

    14 Nov 2025 Conditions
  • 2026/0101DOC Granted

    176 Nottingham Road Burton Joyce Nottinghamshire NG14 5BD

    Approval of details reserved by conditions 3 (CEMP) and 4 (boundary treatments) of planning permission 2024/0213

    18 Feb 2026 Conditions
  • 2026/0284DOC Granted

    Scotgrave Farm Arnold Lane Gedling Nottinghamshire NG4 4HF

    Discharge of conditions 6 (drainage), 8 (Ongoing Management), 9 (Contamination) and 13 (Construction Emissions Management Plan) of planning permission 2024/0093.

    29 Apr 2026 Conditions