Planning application
Land South Of Chain Bridge Road Blaydon NE21 5SS
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a building for employment uses (Use Classes Use Classes E(g) (ii) and E(g) (iii), B2 and B8), together with associated car parking and landscaping works (amended plans/additional information received 03/03/22, 12/04/22, 30/05/22 and 29/06/22).
As published by the council, reference DC/21/01494/FUL
Application record
- Reference
- DC/21/01494/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant
- Received
- 30 Dec 2021
- Validated
- 30 Dec 2021
- Decided
- 5 Apr 2023
- Ward
- Blaydon
- Decision by
- Committee
- Postcode
- NE21 5SS
Timeline
Dates from the published record
-
30 Dec 2021
Received by Gateshead
-
5 Apr 2023
Decision issued: Grant
-
13 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
1,203 applications on PlanIndex · across 153 councils · 94% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
56 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Land South Of Chainbridge Road Blaydon NE21 5SS
87% historically approved · decision due ~20 Oct
CERTIFICATE OF LAWFULNESS FOR PROPOSED USE: Use of vacant land for open-air storage and parking of commercial vehicles (Use Class B8
Awaiting decision Lawful development -
Land South Of Chainbridge Road Blaydon NE21 5SS
82% historically approved · decision due ~27 Jul
Proposed change of use of site for grab wagon business to process and recycle inert waste, including the erection of boundary treatment and material storage buildings
Awaiting decision Full applications -
Boyd And Co Tundry Way Blaydon Blaydon On Tyne NE21 5SW
Demolition of factory buildings and offices, reinstatement of existing boundary fencing with new 2.3m high palisade fencing and gates and siting of portacabin (already commenced) (amended plan received 29.04.2021, 05.05.2021, 08.07.2021) (revised description 05.05.2021)
Granted Full applications Demolition 16 docs -
Taroona House Tundry Way Blaydon NE21 5SJ
Conversion of existing shipping container to front of site into covered storage and terrace, creation of new second floor and re-rendering and cladding of of existing and proposed external walls.
Granted Full applications 24 docs -
Parsons Yard 3 Derwenthaugh Industrial Estate Access Blaydon NE16 3BQ
Change of use for container self-storage (Use Class B8).
Granted Full applications 19 docs -
GRAPHITE RESOURCES LTD Derwenthaugh Ecoparc Derwenthaugh Road Blaydon NE16 3BJ
Proposed non-material amendment to application DC/15/00644/FUL to allow the minor internal modification of the fuel handling system to enable the treatment of clinical waste in addition to the installation of a pyrolysis thermal treatment plant and associated external gas engines, gasometer and flue modifications (amended 05/05/20).
Granted Amendments 9 docs
Other full applications applications
In Gateshead
-
DC/25/00012/FUL Withdrawn
International Paint Ltd Stoneygate Lane Felling NE10 0JY
Construction of a Fork Lift Truck (FTL) battery charging building (Additional information received on 31.01.2025 and 12.06.2025)
-
DC/26/00656/FUL Awaiting decision
Site Of Former Ciborio Ltd Hawks Road Gateshead NE8 3AD
Continued use of temporary car park on site of former Ciborio Ltd (renewal of temporary permission DC/23/00505/COU) until 14/10/2029
-
DC/26/00650/FUL Awaiting decision
Potters Cafe 174 Carr Hill Road Gateshead NE9 5NA
Installation of an ATM machine
-
DC/25/01221/FUL Granted
First Floor Former Co-Op Buildings Hookergate Lane Rowlands Gill NE39 2AJ
Change of use and conversion of first floor office space into 3No 2 bedroom apartments (amended plans and additional information submitted: 21.04.2026, 23.04.2026, 08.06.2026 and 24.07.2026)
-
DC/26/00077/FUL Granted
Deckham Family Centre 195 - 201 Split Crow Road Gateshead NE8 3UB
Change of use from Family Centre, previously used by Gateshead Council Social Services to one 5-bed ground floor flat. (amended plans rec'd 08.07.26)