Planning application
Hadrian Architectural Addison Industrial Estate Stella Ryton NE21 4TE
Works: Extension Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing industrial unit and extension of existing industrial unit (amended 13/07/21 and 11/08/21 and additional information received 27/07/21).
As published by the council, reference DC/20/01011/FUL
Application record
- Reference
- DC/20/01011/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant
- Received
- 2 Nov 2020
- Validated
- 14 May 2021
- Decided
- 21 Jan 2022
- Ward
- Ryton Crookhill And Stella
- Decision by
- Delegated Decision
- Postcode
- NE21 4TE
Site history
Applications at this address on the Gateshead register
This site has had 2 applications since 2019: 1 approved, 0 refused.
-
DC/19/01064/FUL Withdrawn
Hadrian Architectural Addison Industrial Estate Stella Ryton NE21 4TE
Part demolition of existing industrial unit and erection of extensions
Timeline
Dates from the published record
-
2 Nov 2020
Received by Gateshead
-
14 May 2021
Validated
Checked as complete and ready for consideration.
-
21 Jan 2022
Decision issued: Grant
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
40 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Gateshead granted permission on 21 January 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Hadrian Architectural Addison Industrial Estate Stella Ryton NE21 4TE
Part demolition of existing industrial unit and erection of extensions
Withdrawn Full applications Extension Demolition 10 docs -
Unit 6B Graphics House Addison Industrial Estate Blaydon On Tyne NE21 4TE
Change of use from cold food preparation to hot food preparation and delivery (already commenced).
Granted Full applications 8 docs -
The Kyles Stella Bank Blaydon NE21 4NA
Removal and replacement of single storey extension to east elevation, replacement of roof incorporating raising of ridge height and installation of dormer windows to front and rear, installation of cladding and external render and creation of additional parking space to front (amended plan 14.04.2021)
Granted Householder Extension Loft or dormer +2 15 docsSmall domestic -
Stella South Sub Station Haugh Lane Ryton
Installation of section of underground cable to facilitate Battery Energy Storage System (BESS) site (Amended 10/09/2024, 10/10/2024, 06/11/2024, 22/11/2024).
Granted Full applications 18 docs -
19 Derwent Water Drive Blaydon On Tyne NE21 4FJ
Proposed single storey extension to rear of property and new driveway to front
Granted Householder Extension 7 docsSmall domestic -
Land At Haugh Lane Haugh Lane Stella Ryton Gateshead NE21 4SA,
Change of use and continued operation of site for the storage and distribution of primary aggregates (Sui Generis) (additional information received 08.02.2021 and amended site location plan received 08.06.2021).
Withdrawn Full applications 18 docs
Other full applications
In Gateshead
-
DC/25/00012/FUL Withdrawn
International Paint Ltd Stoneygate Lane Felling NE10 0JY
Construction of a Fork Lift Truck (FTL) battery charging building (Additional information received on 31.01.2025 and 12.06.2025)
-
DC/26/00656/FUL Awaiting decision
Site Of Former Ciborio Ltd Hawks Road Gateshead NE8 3AD
Continued use of temporary car park on site of former Ciborio Ltd (renewal of temporary permission DC/23/00505/COU) until 14/10/2029
-
DC/26/00650/FUL Awaiting decision
Potters Cafe 174 Carr Hill Road Gateshead NE9 5NA
Installation of an ATM machine
-
DC/25/01221/FUL Granted
First Floor Former Co-Op Buildings Hookergate Lane Rowlands Gill NE39 2AJ
Change of use and conversion of first floor office space into 3No 2 bedroom apartments (amended plans and additional information submitted: 21.04.2026, 23.04.2026, 08.06.2026 and 24.07.2026)
-
DC/26/00077/FUL Granted
Deckham Family Centre 195 - 201 Split Crow Road Gateshead NE8 3UB
Change of use from Family Centre, previously used by Gateshead Council Social Services to one 5-bed ground floor flat. (amended plans rec'd 08.07.26)