Skip to content
PlanIndex Get alerts
Menu

Planning application

Land West Of Leven House Bute Road South Rowlands Gill NE39 2AP

Granted Gateshead DC/20/00160/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of two houses and creation of (temporary) works compound on adjacent local amenity land (amended 27/02/20).

As published by the council, reference DC/20/00160/FUL

Application record

Reference
DC/20/00160/FUL
Type
Full Application
Status
Decided
Decision
Grant
Received
14 Feb 2020
Validated
14 Feb 2020
Decided
27 Apr 2020
Ward
Winlaton And High Spen
Decision by
Delegated Decision
Postcode
NE39 2AP

Timeline

Dates from the published record

  1. 14 Feb 2020

    Received by Gateshead

  2. 27 Apr 2020

    Decision issued: Grant

  3. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • West Of Leven House Bute Road South High Spen Rowlands Gill NE39 2AP

    19/00126/DOC1 Submitted 21 Oct 2019 6m away

    Discharge of conditions 7 (Provision of Footpath), 8 ( PRA + Phase II) and 9 (Remediation) of planning application DC/19/00126/FUL (additional information received 26.11.19)

    Granted Conditions
  • 65 The Crescent Rowlands Gill NE39 2AW

    DC/21/00116/HHA Submitted 25 Jan 2021 31m away

    Proposed single storey front and side extension and addition of rear dormer window (amended plans received 18.06.2021).

    Granted Householder Extension Loft or dormer +1 10 docs
    Small domestic
  • West Of Leven House Bute Road South Rowlands Gill NE39 2AP

    20/00160/DOC1 Submitted 3 Jul 2020 65m away

    Discharge of conditions 3 (Materials) and 7 (Access Details) of planning approval DC/20/00160/FUL

    Granted Conditions
  • 8 The Crescent High Spen Rowlands Gill Gateshead NE39 2AW

    DC/26/00429/HHA Submitted 3 Jun 2026 82m away

    87% historically approved · decision due ~12 Oct

    Front Porch Extension

    Awaiting decision Extension
    Small domestic
  • 12 The Crescent Rowlands Gill NE39 2AW

    DC/20/00225/HHA Submitted 9 Mar 2020 122m away

    Proposed single storey extension to rear elevation to provide porch and proposed loft conversion with 2 dormer windows to the front roof slope and 3 rooflights to the rear roof slope.

    Granted Householder Extension Loft or dormer +1 5 docs
    Small domestic
  • 22 North View Bungalows Rowlands Gill NE39 2AU

    DC/26/00421/HCPL Submitted 29 May 2026 134m away

    87% historically approved · decision due ~17 Sep

    Loft conversion and installation of 3no. rooflights, and replacement of front elevation window.

    Awaiting decision Loft or dormer Windows or glazing

In Gateshead

  • DC/25/00012/FUL Withdrawn

    International Paint Ltd Stoneygate Lane Felling NE10 0JY

    Construction of a Fork Lift Truck (FTL) battery charging building (Additional information received on 31.01.2025 and 12.06.2025)

    9 Jan 2025 Full applications
  • DC/26/00656/FUL Awaiting decision

    Site Of Former Ciborio Ltd Hawks Road Gateshead NE8 3AD

    Continued use of temporary car park on site of former Ciborio Ltd (renewal of temporary permission DC/23/00505/COU) until 14/10/2029

    17 Aug 2026 Full applications
  • DC/26/00650/FUL Awaiting decision

    Potters Cafe 174 Carr Hill Road Gateshead NE9 5NA

    Installation of an ATM machine

    14 Aug 2026 Full applications
  • DC/25/01221/FUL Granted

    First Floor Former Co-Op Buildings Hookergate Lane Rowlands Gill NE39 2AJ

    Change of use and conversion of first floor office space into 3No 2 bedroom apartments (amended plans and additional information submitted: 21.04.2026, 23.04.2026, 08.06.2026 and 24.07.2026)

    4 Nov 2025 Full applications
  • DC/26/00077/FUL Granted

    Deckham Family Centre 195 - 201 Split Crow Road Gateshead NE8 3UB

    Change of use from Family Centre, previously used by Gateshead Council Social Services to one 5-bed ground floor flat. (amended plans rec'd 08.07.26)

    2 Feb 2026 Full applications