Skip to content
PlanIndex Get alerts
Menu

Planning application

TTS Ltd Generator Specialists Nest Road Gateshead NE10 0ES

Granted Gateshead DC/19/00466/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of storage building (B8 use class)

As published by the council, reference DC/19/00466/FUL

Application record

Reference
DC/19/00466/FUL
Type
Full Application
Status
Decided
Decision
Grant
Received
15 May 2019
Validated
28 May 2019
Decided
9 Jul 2019
Ward
Felling
Decision by
Delegated Decision
Postcode
NE10 0ES

Timeline

Dates from the published record

  1. 15 May 2019

    Received by Gateshead

  2. 28 May 2019

    Validated

    Checked as complete and ready for consideration.

  3. 9 Jul 2019

    Decision issued: Grant

  4. 23 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Morpeth

49 applications on PlanIndex · across 5 councils · 67% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Gateshead granted permission on 9 July 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land East Of Green Lane Felling Gateshead NE10 0QH

    DC/26/00369/FUL Submitted 8 May 2026 171m away

    82% historically approved · decision due ~15 Jul

    Erection of Class E(g [ii and iii])/B2/B8 blocks, together with external works and landscaping, and creation of a substation and meter room (amended plans/additional information received 11.06.2026, 24.07.2026)

    Awaiting decision Full applications
  • MH Southern Green Lane Felling Gateshead NE10 0JS

    DC/21/00605/FUL Submitted 5 May 2021 258m away

    Erection of storage building (Use Class B8) with external hardstanding and new site access (revised description 05.04.2022) (amended plans 09.11.2021, 22.12.2021, 20.01.2022, 05.04.2022).

    Granted Full applications 39 docs
  • Washington Metalworks Limited Bath Road Felling Gateshead NE10 0LH

    25/01381/DOC3 Submitted 28 May 2026 267m away

    87% historically approved · decision due ~23 Jul

    Discharge of planning condition 10 (Bath / Nest Road Waiting Restrictions) of planning approval DC/25/01381/FUL for an extension on the north elevation of a factory building (REVISED info received 12 August 2026).

    Awaiting decision Extension
  • Washington Metalworks Limited Bath Road Felling Gateshead NE10 0LH

    25/01381/DOC2 Submitted 22 May 2026 267m away

    87% historically approved · decision due ~17 Jul

    Discharge of planning conditions 5 (Car Park Drainage), 12 (Cycle Parking), and 14 (EV Charging) of planning approval DC/25/01381/FUL for an extension on the north elevation of a factory building (REVISED INFO received 21 August 2026).

    Awaiting decision Extension
  • Washington Metalworks Limited Bath Road Felling Gateshead NE10 0LH

    25/01381/DOC1 Submitted 20 May 2026 267m away

    87% historically approved · decision due ~15 Jul

    Discharge of planning condition 16 (Travel Plan) of planning approval DC/25/01381/FUL for an extension on the north elevation of a factory building (REVISED Travel Plan received 11 June 2026).

    Awaiting decision Extension
  • Waverley Direct Nest Road Felling Central Felling NE10 0ES

    DC/20/00480/FUL Submitted 15 Jun 2020 290m away

    Replacement of gas heating with mine water heat pump (retrospective application).

    Granted Full applications 9 docs

In Gateshead

  • DC/25/00012/FUL Withdrawn

    International Paint Ltd Stoneygate Lane Felling NE10 0JY

    Construction of a Fork Lift Truck (FTL) battery charging building (Additional information received on 31.01.2025 and 12.06.2025)

    9 Jan 2025 Full applications
  • DC/26/00656/FUL Awaiting decision

    Site Of Former Ciborio Ltd Hawks Road Gateshead NE8 3AD

    Continued use of temporary car park on site of former Ciborio Ltd (renewal of temporary permission DC/23/00505/COU) until 14/10/2029

    17 Aug 2026 Full applications
  • DC/26/00650/FUL Awaiting decision

    Potters Cafe 174 Carr Hill Road Gateshead NE9 5NA

    Installation of an ATM machine

    14 Aug 2026 Full applications
  • DC/25/01221/FUL Granted

    First Floor Former Co-Op Buildings Hookergate Lane Rowlands Gill NE39 2AJ

    Change of use and conversion of first floor office space into 3No 2 bedroom apartments (amended plans and additional information submitted: 21.04.2026, 23.04.2026, 08.06.2026 and 24.07.2026)

    4 Nov 2025 Full applications
  • DC/26/00077/FUL Granted

    Deckham Family Centre 195 - 201 Split Crow Road Gateshead NE8 3UB

    Change of use from Family Centre, previously used by Gateshead Council Social Services to one 5-bed ground floor flat. (amended plans rec'd 08.07.26)

    2 Feb 2026 Full applications