Skip to content
PlanIndex Get alerts
Menu

Planning application

Unit G114 Ellison Walk Gateshead

Granted Gateshead DC/19/00359/FUL Full Application

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement of shopfront

As published by the council, reference DC/19/00359/FUL

Application record

Reference
DC/19/00359/FUL
Type
Full Application
Status
Permitted
Decision
Grant Retrospective
Received
16 Apr 2019
Validated
18 Apr 2019
Decided
7 Jun 2019
Ward
Bridges
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 16 Apr 2019

    Received by Gateshead

  2. 18 Apr 2019

    Validated

    Checked as complete and ready for consideration.

  3. 7 Jun 2019

    Decision issued: Grant Retrospective

  4. 23 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

11 applications on PlanIndex · across 6 councils · 80% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Lloyds TSB 17 Ellison Walk Gateshead NE8 1BF

    DC/26/00635/ADV Submitted 10 Aug 2026 17m away

    87% historically approved · decision due ~15 Oct

    Display of 2No fascia signs, 1No projecting sign, and signage to new external ATM machine

    Awaiting decision Advertising
  • Lloyds TSB 17 Ellison Walk Gateshead NE8 1BF

    DC/26/00634/FUL Submitted 10 Aug 2026 17m away

    82% historically approved · decision due ~5 Oct

    Proposed Installation of 1no. new external ATM machine with associated signage, removal of existing ATM machine and replacement of existing glazing

    Awaiting decision Full applications Windows or glazing
  • New Century House, Unit 1 (Argos) West Street Gateshead NE8 1HR

    DC/20/00948/ADV Submitted 16 Oct 2020 40m away

    Display of 1no internally illuminated and 2no non illuminated fascia signage.

    Decided Advertising 4 docs
  • 5 Trinity Square Gateshead NE8 1AG

    DC/21/01239/ADV Submitted 14 Oct 2021 102m away

    Installation of 1no internally illuminated fascia sign.

    Decided Advertising 7 docs
  • 0501-0286 High Street Opp No. 207 Gateshead

    DC/19/00577/ADV Submitted 11 Jun 2019 154m away

    Upgrade of existing double sided advertising paper panels with double sided advertising digital panels forming an integral part of the shelter.

    Decided Advertising 13 docs
  • 23 Regent Terrace Gateshead NE8 1LU

    DC/21/00215/LBC Submitted 19 Feb 2021 159m away

    LISTED BUILDING CONSENT Remove existing cement fillet and column of tiles closest to the chimney. Renew the lead soakers and install a new lead flashing alongside the chimney and replace tiles where necessary. Renew lead apron behind chimney.

    Granted Heritage and listed buildings 10 docs

In Gateshead

  • DC/25/00012/FUL Withdrawn

    International Paint Ltd Stoneygate Lane Felling NE10 0JY

    Construction of a Fork Lift Truck (FTL) battery charging building (Additional information received on 31.01.2025 and 12.06.2025)

    9 Jan 2025 Full applications
  • DC/26/00656/FUL Awaiting decision

    Site Of Former Ciborio Ltd Hawks Road Gateshead NE8 3AD

    Continued use of temporary car park on site of former Ciborio Ltd (renewal of temporary permission DC/23/00505/COU) until 14/10/2029

    17 Aug 2026 Full applications
  • DC/26/00650/FUL Awaiting decision

    Potters Cafe 174 Carr Hill Road Gateshead NE9 5NA

    Installation of an ATM machine

    14 Aug 2026 Full applications
  • DC/25/01221/FUL Granted

    First Floor Former Co-Op Buildings Hookergate Lane Rowlands Gill NE39 2AJ

    Change of use and conversion of first floor office space into 3No 2 bedroom apartments (amended plans and additional information submitted: 21.04.2026, 23.04.2026, 08.06.2026 and 24.07.2026)

    4 Nov 2025 Full applications
  • DC/26/00077/FUL Granted

    Deckham Family Centre 195 - 201 Split Crow Road Gateshead NE8 3UB

    Change of use from Family Centre, previously used by Gateshead Council Social Services to one 5-bed ground floor flat. (amended plans rec'd 08.07.26)

    2 Feb 2026 Full applications