Planning applications in Gateshead, August 2019
Gateshead recorded 17 planning applications in August 2019, listed newest first. Dates are as received, or as decided where the council publishes no submission date.
Applications, August 2019
Newest first
-
19/00027/DOC2 Granted
Gateshead Jewish Teachers Training College 50, 52 And 54 Bewick Road Gateshead NE8 4DQ
Discharge of condition 3 (Demolition and CMP) of planning application DC/19/00027/FUL (additional information received 17 October 2019).
-
12/01266/DOC6 Split decision
Blaydon Quarry Lead Road Blaydon NE21 4SX
Discharge of conditions 4 (Detailed schemes to be approved), 5 (Restoration of compound plant area), 7 (Additional wheelwash measures), 9 ( Record of depth, composition, contours), 20 ( Inert filll area protection measures), 22 (Bird Hazard Management Strategy), 27 (Materials stored on cell 1), 28 ( Sand Martin nests, bat and bird boxes) and 32 ( Early restoration in NE and SE corners) of planning application DC/12/01266/MIWAS.
-
12/01266/DOC7 Refused
Blaydon Quarry Lead Road Blaydon NE21 4SX
Discharge of conditions 7 (Additional wheelwash measures), 12 (Noise monitoring scheme for restoration), 13 ( Vibration monitoring scheme) and 14 (Dust scheme) of planning application DC/12/01266/MIWAS.
-
15/01137/DOC1 Withdrawn
Land Bound By Kingsway North And Second Avenue Team Valley Gateshead NE11 0JU
Discharge of condition 6 (Coal Mining Risk Assessment), 7 (CMRA additional Remediation), 8 (Implement CMRA Remediation), 10 (Service trences and levels), 15 (Phase 2 Risk Assessment), 17 (Remediation Strategy), 29 (Construction Method Statement), 30 (SUDS),36 (Materials), 55 (RES MATS ground levels), 57 (Substation), 59 (Retaining Walls Details), 61 (RES MATS Retaining Walls), 63 (Surface finishes), 67 (Refuse), 69 (Framework Travel Plan), 71 (cycle rack details), 79 (Car Park Layout), 85 (Cycle parking re networks), 89 (RES MATS Implement Ped connectivity), 91 (Drainage Design), 93 (Water Quality Management Plan), 95 (SuDS construction method statement), 97 (Flood Resilience Measures), 99(H and S Risk Assessment), 101 (SuDS Management Plan) and 103 (Foul and Surface Water drainage) of planning application DC/15/01137/OUT.
-
DC/19/00902/FUL Refused
Land Rear Of Oakfield House Gateshead Road Sunniside Newcastle Upon Tyne NE16 5LQ
Erection of detached house and garage
-
18/00704/DOC7 Refused
Land West Of Pennyfine Road Sunniside Newcastle Upon Tyne NE16 5EP
Partial discharge of condition 7 (Verification Report) of planning application DC/18/00704/FUL.
-
17/00535/DOC6 Granted
Land East Of Dukesway Gateshead NE11 0PZ
Discharge of Conditions 17 and 18 (Travel Plan
-
11/00419/DOC8 Withdrawn
Land East Of Dukesway Team Valley Gateshead NE11 0PZ
Discharge of conditions 17 (Revised framework travel plan) and 18 ( Individual occupier travel plans) of planning approval DC/11/00419/OUT (amended travel plan received 04.02.2021).
-
TREE/19/052 Decided
4A Shibdon Way Blaydon Blaydon On Tyne NE21 5NX
Tree works at 4a Shibdon Way Axwell Park Blaydon
-
TREE/19/053 Decided
Engleberg Wingrove Rowlands Gill NE39 1DT
Tree works at Engleberg Wingrove.
-
DC/19/00828/FUL Granted
T G Laskey Racing Ltd 1 Brookfield Terrace Bill Quay Gateshead NE10 0QU
Installation of new shopfront
-
15/00799/DOC5 Granted
Land At Beda Hills Hookergate Lane Rowlands Gill NE39 2AB
Discharge of condition 15 (Cycle parking details) and 24 ( Ecology management plan) of planning approval DC/15/00799/FUL
-
DC/19/00821/FUL Granted
Former Dunston Hill Community Primary School Dunston Bank Gateshead
Demolition of existing school buildings followed by full redevelopment of the site to provide 35 dwellings, with associated parking and vehicle access onto Dunston Bank (amended plans received 21.04.2021, 06.05.2022, 08.06.2022, 28.07.2022 and 16.08.2022 and description amended to reflect increase in proposed amount of redevelopment and dwellings 12.05.2021 and 10.05.2022) (additional information received 04.08.21, 13.05.2022, 28.07.2022, 05.08.2022 and 09.08.2022).
-
DC/19/00819/GPDT Decided
The Craft House 46 Church Street Marley Hill Newcastle Upon Tyne NE16 5DW
Change of use from craft shop (A1) to tea room (A3 use)
-
DC/19/00838/HHA Granted
44 Beechwood Gardens Gateshead NE11 0BY
Erection of a two storey side extension, single storey extension to front and rear (Amended Plans received 10.08.2020).
-
18/00723/DOC1 Granted
Pawston Birks Farm Pawston Road High Spen
Discharge of conditions 3(Biodiversity Method Statement), 5(lighting scheme) and 7(scheme for hedge) of planning approval DC/18/00723/FUL
-
TREE/19/051 Decided
Holly Cottage Banesley Lane Gateshead NE11 0HS
Tree works at Holly Cottage Banesley Lane Gateshead
Other months in 2019
- January 2019 14
- February 2019 12
- March 2019 17
- April 2019 13
- May 2019 13
- June 2019 15
- July 2019 25
- August 2019 17
- September 2019 23
- October 2019 62
- November 2019 45
- December 2019 22