Planning application
Local Environmental Services Construction Depot Shearlegs Road Gateshead NE8 3EN
Relates to DC/20/00884/FUL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of conditions 7(Ph II Risk Assessment) and 11(Coal Mining Legacy) of planning approval DC/20/00884/FUL
As published by the council, reference 20/00884/DOC1
Application record
- Reference
- 20/00884/DOC1
- Type
- Discharge of Condition
- Status
- Awaiting decision
- Decision
- Approve
- Received
- 23 Apr 2021
- Validated
- 23 Apr 2021
- Decided
- 6 May 2021
- Ward
- Bridges
- Postcode
- NE8 3EN
Timeline
Dates from the published record
-
23 Apr 2021
Received by Gateshead
-
6 May 2021
Decision issued: Approve
-
21 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
DC/20/00884/FUL Granted
Local Environmental Services Construction Depot Shearlegs Road East Gateshead Gateshead NE8 3EN
Construction of a 25m x 15m x 6.5m (H) energy centre to house a 6MW minewater heat pump system and introduction of associated boreholes
What this grant of permission means
Gateshead granted permission on 6 May 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Local Environmental Services Construction Depot Shearlegs Road East Gateshead Gateshead NE8 3EN
Construction of a 25m x 15m x 6.5m (H) energy centre to house a 6MW minewater heat pump system and introduction of associated boreholes
Granted Full applications 20 docs -
GB Fuels Ltd Albany Road Gateshead NE8 3BP
Proposed construction of warehouse building and maintenance building as well as addition of cycle store/ smoking shelter and car parking (gas risk assessment received 20.06.2024, drainage info received 27.06.2024, ecology info received 04.07.2024, amended plans received 23.07.2024).
Granted Full applications 48 docs -
GB Fuels Ltd Albany Road Gateshead NE8 3BP
89% historically approved · decision due ~11 Jun
Discharge of condition 10 (Unexpected Contamination) of planning application DC/24/00332/FUL (munitions clearance report received 08.05.2026).
Awaiting decision Conditions 2 docs -
Mcdonalds Restaurant Shearlegs Road East Gateshead Gateshead NE8 3EJ
Installation of two rapid electric vehicle charging stations within the car park of McDonalds
Granted Full applications 10 docs -
Land West Of Albany Road Gateshead
Demolition of existing buildings and outline development within use classes A1 (retail), A3 (food and drink), A4 (drinking establishments) and/or D2 (leisure) with associated access, parking, servicing areas and landscaping with all matters reserved except for Access (amended 14/11/19 and 20/04/20 and additional information received 19/05/20 and 18/08/20).
Refused Outline Demolition 69 docs -
Park House Park Road Gateshead
Proposed removal of 6 no. antennas and 2 no. equipment cabinets and installation of a 7.5m high stub tower mounted on steel support grillage including 6 no. antennas, 1 no. equipment cabinet and ancillary development including ERS units and freestanding handrail.
Granted Telecoms 26 docs
Other condition discharge and variation applications
In Gateshead
-
26/00388/DOC1 Awaiting decision
Lloyds TSB 54 Durham Road Chester Le Street DH3 2QJ
Discharge of condition 3 (Window and door details) of planning application DC/26/00388/ODPA.
-
DC/26/00267/DOC Granted
1 Hedgelea Ryton NE40 3BW
Discharge of planning condition 4 (Bat Roost Features), condition 6 (Bat Mitigation Strategy) and condition 8 (Cycle Storage Details).
-
DC/26/00267/HHA73 Granted
1 Hedgelea Ryton NE40 3BW
Discharge of planning condition 4 (Bat Roost Features), condition 6 (Bat Mitigation Strategy) and condition 8 (Cycle Storage Details).
-
18/00573/DOC20 Awaiting decision
Amazon UK Services Ltd NCL1 Follingsby Lane Felling NE10 8YA
Discharge of planning conditions 18 (Car Park Management Plan), 20 (Delivery /Servicing Management Plan), 22 (Public Transport Strategy) and 35 (Occupier Travel Plan) of planning approval DC/18/00573/COU.
-
18/00574/DOC21 Awaiting decision
Follingsby Park South Follingsby Lane Gateshead NE10 8YA
Discharge of planning condition 11 (Car Park Management Plan), 12 (Delivery / Servicing Management Plan), and 14 (Public Transport Strategy) of planning approval DC/18/00574/FUL.