Skip to content
PlanIndex Get alerts
Menu

Planning application

Local Environmental Services Construction Depot Shearlegs Road Gateshead NE8 3EN

Granted Gateshead 20/00884/DOC1 Discharge of Condition

Relates to DC/20/00884/FUL

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of conditions 7(Ph II Risk Assessment) and 11(Coal Mining Legacy) of planning approval DC/20/00884/FUL

As published by the council, reference 20/00884/DOC1

Application record

Reference
20/00884/DOC1
Type
Discharge of Condition
Status
Awaiting decision
Decision
Approve
Received
23 Apr 2021
Validated
23 Apr 2021
Decided
6 May 2021
Ward
Bridges
Postcode
NE8 3EN

Timeline

Dates from the published record

  1. 23 Apr 2021

    Received by Gateshead

  2. 6 May 2021

    Decision issued: Approve

  3. 21 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • DC/20/00884/FUL Granted

    Local Environmental Services Construction Depot Shearlegs Road East Gateshead Gateshead NE8 3EN

    Construction of a 25m x 15m x 6.5m (H) energy centre to house a 6MW minewater heat pump system and introduction of associated boreholes

    Decided 24 Nov 2020 Full applications

What this grant of permission means

Gateshead granted permission on 6 May 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Local Environmental Services Construction Depot Shearlegs Road East Gateshead Gateshead NE8 3EN

    DC/20/00884/FUL Submitted 29 Sep 2020 55m away

    Construction of a 25m x 15m x 6.5m (H) energy centre to house a 6MW minewater heat pump system and introduction of associated boreholes

    Granted Full applications 20 docs
  • GB Fuels Ltd Albany Road Gateshead NE8 3BP

    DC/24/00332/FUL Submitted 24 Apr 2024 158m away

    Proposed construction of warehouse building and maintenance building as well as addition of cycle store/ smoking shelter and car parking (gas risk assessment received 20.06.2024, drainage info received 27.06.2024, ecology info received 04.07.2024, amended plans received 23.07.2024).

    Granted Full applications 48 docs
  • GB Fuels Ltd Albany Road Gateshead NE8 3BP

    24/00332/DOC2 Submitted 16 Apr 2026 167m away

    89% historically approved · decision due ~11 Jun

    Discharge of condition 10 (Unexpected Contamination) of planning application DC/24/00332/FUL (munitions clearance report received 08.05.2026).

    Awaiting decision Conditions 2 docs
  • Mcdonalds Restaurant Shearlegs Road East Gateshead Gateshead NE8 3EJ

    DC/21/00742/FUL Submitted 8 Jun 2021 168m away

    Installation of two rapid electric vehicle charging stations within the car park of McDonalds

    Granted Full applications 10 docs
  • Land West Of Albany Road Gateshead

    DC/19/00244/OUT Submitted 14 Mar 2019 191m away

    Demolition of existing buildings and outline development within use classes A1 (retail), A3 (food and drink), A4 (drinking establishments) and/or D2 (leisure) with associated access, parking, servicing areas and landscaping with all matters reserved except for Access (amended 14/11/19 and 20/04/20 and additional information received 19/05/20 and 18/08/20).

    Refused Outline Demolition 69 docs
  • Park House Park Road Gateshead

    DC/24/00865/TELFUL Submitted 8 Oct 2024 196m away

    Proposed removal of 6 no. antennas and 2 no. equipment cabinets and installation of a 7.5m high stub tower mounted on steel support grillage including 6 no. antennas, 1 no. equipment cabinet and ancillary development including ERS units and freestanding handrail.

    Granted Telecoms 26 docs

In Gateshead

  • 26/00388/DOC1 Awaiting decision

    Lloyds TSB 54 Durham Road Chester Le Street DH3 2QJ

    Discharge of condition 3 (Window and door details) of planning application DC/26/00388/ODPA.

    4 Aug 2026 Conditions
  • DC/26/00267/DOC Granted

    1 Hedgelea Ryton NE40 3BW

    Discharge of planning condition 4 (Bat Roost Features), condition 6 (Bat Mitigation Strategy) and condition 8 (Cycle Storage Details).

    31 Mar 2026 Conditions
  • 1 Hedgelea Ryton NE40 3BW

    Discharge of planning condition 4 (Bat Roost Features), condition 6 (Bat Mitigation Strategy) and condition 8 (Cycle Storage Details).

    31 Mar 2026 Conditions
  • 18/00573/DOC20 Awaiting decision

    Amazon UK Services Ltd NCL1 Follingsby Lane Felling NE10 8YA

    Discharge of planning conditions 18 (Car Park Management Plan), 20 (Delivery /Servicing Management Plan), 22 (Public Transport Strategy) and 35 (Occupier Travel Plan) of planning approval DC/18/00573/COU.

    6 Jul 2026 Conditions
  • 18/00574/DOC21 Awaiting decision

    Follingsby Park South Follingsby Lane Gateshead NE10 8YA

    Discharge of planning condition 11 (Car Park Management Plan), 12 (Delivery / Servicing Management Plan), and 14 (Public Transport Strategy) of planning approval DC/18/00574/FUL.

    6 Jul 2026 Conditions