Former Clasper Village Site Tyne Road East Gateshead

Granted Gateshead 19/00213/DOC1 Discharge of Condition

Works: Trees

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of conditions 3(Tree protection measures), 6(Construction control plan), 8(Remediation strategy), 12(Coal remedial works), 14(SuDS construction details), 26(Final footway for plots 143 and 102), 28(Parking space opp plot 98), 30(Reduction of spaces for approval), 32(Additional VP bays), 34(Relocated bin store), 36(Traffic calming), 38(Pedestrian routes), and 40(orientation of plots 104-110 and 186) of planning approval DC/19/00235/OUT

As published by the council, reference 19/00213/DOC1

Application record

Reference
19/00213/DOC1
Type
Discharge of Condition
Status
Awaiting decision
Decision
Approve
Received
15 Nov 2019
Validated
19 Nov 2019
Decided
12 Nov 2020
Ward
Dunston And Teams
Decision by
Delegated Decision

Site history

Applications at this address on the Gateshead register

This site has had 2 applications since 2019: 2 approved, 0 refused.

  • DC/19/01159/NMA Granted

    Former Clasper Village Site Tyne Road East Gateshead

    Proposed non-material amendment of application DC/19/00213/OUT to allow amendments to the highway layout, parking, tree retention along Askew Road, drainage layout, boundary treatment and apartment information.

    Decided 20 Dec 2019 Amendments

Timeline

Dates from the published record

  1. 15 Nov 2019

    Received by Gateshead

  2. 19 Nov 2019

    Validated

    Checked as complete and ready for consideration.

  3. 12 Nov 2020

    Decision issued: Approve

  4. 6 Aug 2026

    Added to PlanIndex

What this grant of permission means

Gateshead granted permission on 12 November 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Gateshead

  • 25/00286/DOC1 Granted

    Poundstretchers Hexham Road Swalwell Newcastle Upon Tyne NE16 3AA

    Discharge of conditions 5 (CEMP - Sub), 9 (Biodiversity Gain Plan) and 12 (Landscaping - Sub of planning application DC/25/00286/FUL.

    21 Jan 2026 Conditions
  • 26/00388/DOC1 Awaiting decision

    Lloyds TSB 54 Durham Road Chester Le Street DH3 2QJ

    Discharge of condition 3 (Window and door details) of planning application DC/26/00388/ODPA.

    4 Aug 2026 Conditions
  • DC/26/00267/DOC Granted

    1 Hedgelea Ryton NE40 3BW

    Discharge of planning condition 4 (Bat Roost Features), condition 6 (Bat Mitigation Strategy) and condition 8 (Cycle Storage Details).

    31 Mar 2026 Conditions
  • 1 Hedgelea Ryton NE40 3BW

    Discharge of planning condition 4 (Bat Roost Features), condition 6 (Bat Mitigation Strategy) and condition 8 (Cycle Storage Details).

    31 Mar 2026 Conditions
  • 23/00584/DOC1 Granted

    The Nook Ryton Village West Ryton NE40 3QL

    Discharge of Conditions 4 (roof slate photo sample) 8 (dormer window drawing) 10 (bi fold doors drawing) 15 (insulation in outbuilding drawing) of Planning application DC/23/00584/LBC

    22 May 2025 Conditions