Planning application
Land At 1 Station Villas High Street Blakeney Gloucestershire
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a single storey extension.
As published by the council, reference P1069/21/FUL
Application record
- Reference
- P1069/21/FUL
- Type
- Full Application
- Status
- Consent
- Decision
- Granted As published: Granted Permission
- Received
- 8 Jun 2021
- Validated
- 9 Jun 2021
- Decided
- 12 Aug 2021
- Ward
- Newnham
- Parish
- Awre
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
8 Jun 2021
Received by Forest of Dean
-
9 Jun 2021
Validated
Checked as complete and ready for consideration.
-
12 Aug 2021
Decision issued: Granted Permission
-
6 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Buildingcontrol: BN0576/21 (Building Work Complete)
Who's behind it
Company information only, from the register and Companies House
Silva Planning Consultancy Agent, a planning consultancy
7 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
- CONSERVATION ADVISOR
- AGREEMENT TO EXTENSION OF TIME
- PARISH COUNCIL
- SUSTAINABILITY GCN
- OFFICER AGREEMENT TO PARISH COUNCIL EOT
- BLOCK PLAN OF THE SITE
- THE LOCATION PLAN
- PAGE 4 BIODIVERSITY CHECKLIST
- PAGE 2 BIODIVERSITY CHECKLIST
- PAGE 1 BIODIVERISTY CHECKLIST
- PAGE 3 BIODIVERSTIY CHECKLIST
- EXISTING ELEVATIONS
- PROPOSED ELEVATIONS
- FLOOR PLAN & SECTION DETAIL
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Forest of Dean granted permission on 12 August 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
1 Moorfield Avenue Blakeney Gloucestershire GL15 4DA
1 x Conifer - 50% reduction in height and crown lift to 3 metres above ground.
Granted Trees 1 doc -
Land South Of Moorfield Avenue Blakeney Gloucestershire GL15 4DA
To undertake targeted management of vegetation adjacent to the highway between the British Legion Club and the bus shelter by removing all dead, dying and unsafe trees, crown lifting roasdside trees to achieve a 5.2 metre cariageway clearance and restoring statutory visibility by clearing vegetation to 2 metres around all highway signage and lighting columns, and 2.5 metres around the bus shelter, ensuring full compliance with BS3998, safe access for highway users and unobstructed sightlines throughoutv the route.
Granted Trees 9 docs -
Old School House High Street Blakeney Gloucestershire GL15 4EB
Reduce height of three Birch trees at side of house by 3 metres and all overhanging branches away from school building. Reduce crown of Cherry tree along wall of school by 0.5 metres.
Granted Trees 1 doc -
The Old School House High Street Blakeney Gloucestershire GL15 4EB
3 x Silver Birch - Crown reduction by 2 metres. 1 x Cherry - Crown reduction by 0.5 metres.
Granted Trees 4 docs -
24 Butlers Mead Blakeney Gloucestershire GL15 4EH
Remove 2 x Ash and 1 x Oak of DFTPO80 (A1), and replant with 3 x fruit trees.
Refused Trees 4 docs -
6 High Street Blakeney Gloucestershire GL15 4DY
Installation of fascia signage ACM panels with acrylic POD and Illumination x 1, full colour printed ACM panels x 3, window vinyls full colour printed x 1, sliver lockable poster cases
Granted Advertising Windows or glazing 6 docs
Other full applications
In Forest of Dean
-
P1090/26/FUL Awaiting decision
SPP Pumps Ltd Crucible Close Coleford Gloucestershire GL16 8RE
Erection of a semi permanent building providing 342m² of undercover storage for engines and metal fabrications currently stored externally within the existing yard.
-
P0902/26/FUL Granted
Sunnyside Crow Ash Road Berry Hill Coleford Gloucestershire GL16 7RB
Demolition of existing kitchen extension and erection of two storey side extension with single storey wrapping round rear of the property.
-
P0800/26/FUL Granted
Dennel Hill Farmhouse Tidenham Chase Chepstow NP16 7JN
Erection of rear 1.5 storey extension with balcony and first floor extension with balcony to allow for extended first floor level with associated internal alterations and works. Demolition of existing rear conservatory.
-
P0682/26/FUL Granted
7 Woodgate Road Mile End Coleford Gloucestershire GL16 7QE
Proposed Vehicular Access and Parking and associated works
-
P0213/26/FUL Granted
Land At 34 Worrall Hill Gloucestershire GL17 9QE
Erection of a self-build dwelling and associated works