Skip to content
PlanIndex Get alerts
Menu

Planning application

Dungeness A Power Station, Dungeness Road, Lydd, Romney Marsh, TN29 9PP

Granted Folkestone and Hythe 22/1146/FH Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Increase the number of parking bays to improve the channel view staff office car park by carrying out re-surfacing works and removing the trip hazards. The works will also require installation of drainage, line painting, lighting improvements, provision for EV car charger installation, provision of suitable accessible parking spaces.

As published by the council, reference 22/1146/FH

Application record

Reference
22/1146/FH
Type
Full Planning Permission
Status
Closed
Decision
Approve with Conditions
Received
7 Jul 2022
Validated
7 Jul 2022
Decided
1 Mar 2023
Ward
Walland & Denge Marsh
Parish
Lydd Parish
Decision by
Delegated Decision
Postcode
TN29 9PP

Site history

Applications at this address on the Folkestone and Hythe register

This site has had 9 applications since 2021: 8 approved, 0 refused.

  • 25/2201/FH/CON Granted

    DUNGENESS A POWER STATION, DUNGENESS ROAD, LYDD, ROMNEY MARSH, TN29 9PP

    Approval of details pursuant to condition 3 (flood risk & drainage assessment) of planning permission 24/1106/FH.

    Decided 28 Jan 2026 Conditions
  • 25/1569/FH Granted

    DUNGENESS A POWER STATION, DUNGENESS ROAD, LYDD, ROMNEY MARSH, TN29 9PP

    Installation of new antenna adjacent to existing one at the eastern site location and installation of 2 new antenna at the western site location.

    Decided 3 Oct 2025 Full applications
  • 24/0845/FH/CON Granted

    DUNGENESS A POWER STATION, DUNGENESS ROAD, LYDD, ROMNEY MARSH, TN29 9PP

    Approval of details pursuant to condition 3 (surface water drainage verification report) of planning permission 22/1146/FH

    Decided 22 Nov 2024 Conditions
  • 23/0075/FH Granted

    Dungeness A Power Station, Dungeness Road, Lydd, Romney Marsh, TN29 9PP

    Construction of a semi-permanent, modular building to house the Laboratory processes .

    Decided 22 Mar 2023 Full applications
  • 22/2142/FH Granted

    Dungeness A Power Station, Dungeness Road, Lydd, Romney Marsh, TN29 9PP

    Replacement of ageing pumps and pipework to ensure continued operation of the surface water discharges system.

    Decided 1 Mar 2023 Full applications
  • 22/1932/FH Granted

    Dungeness A Power Station, Dungeness Road, Lydd, Romney Marsh, TN29 9PP

    Reprofiling and compaction of existing material in the Turbine Hall Basement, engineering works to ensure that groundwater within the structure is in equilibrium with the groundwater around it and infilling the remaining void with granular inert material to ground level.

    Decided 6 Apr 2023 Full applications
  • 22/1430/FH Granted

    Dungeness A Power Station, Dungeness Road, Lydd, Romney Marsh, TN29 9PP

    Erection of 9 x ISO containerised workshops

    Decided 1 Mar 2023 Full applications
  • 21/1084/FH Decided

    Dungeness A Power Station, Dungeness Road, Lydd, Romney Marsh, TN29 9PP

    Lawful development certificate (existing) for the continued use of two cabins as welfare facilities.

    Decided 16 Jul 2021 Lawful development

Timeline

Dates from the published record

  1. 7 Jul 2022

    Received by Folkestone and Hythe

  2. 1 Mar 2023

    Decision issued: Approve with Conditions

  3. 8 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 24/0845/FH/CON Granted

    DUNGENESS A POWER STATION, DUNGENESS ROAD, LYDD, ROMNEY MARSH, TN29 9PP

    Approval of details pursuant to condition 3 (surface water drainage verification report) of planning permission 22/1146/FH

    Decided 22 Nov 2024 Conditions

Documents

Plans, drawings, consultee responses and the officer's report

38 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Folkestone and Hythe granted permission on 1 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Folkestone and Hythe

  • 26/1145/FH Granted

    Highfields Farmhouse, Stowting Hill, Stowting Common, Ashford, TN25 6BG

    Replacement dwelling and erection of detached carport with annexe following demolition of outbuildings.

    15 Jul 2026 Full applications
  • 26/0990/FH Granted

    Flat 2, 35 Augusta Gardens, Folkestone, CT20 2RT

    Reconfigured external access steps (retrospective).

    19 Jun 2026 Full applications
  • 26/0988/FH Refused

    15 Risborough Lane, Folkestone, CT19 4JH

    Change of use of ground floor retail unit from class E(a) to 1 bed flat (class C3), including rear extension and alterations to front, side and rear elevations.

    19 Jun 2026 Full applications
  • 26/1041/FH Granted

    40 Valestone Close, Hythe, CT21 5SW

    Erection of an outbuilding to be used for dog grooming business.

    29 Jun 2026 Full applications
  • 26/0903/FH Refused

    N I C Instruments Ltd, Gladstone Road, Folkestone, CT19 5NF

    Demolition of existing building and erection of 8 no. dwelling-houses with associated landscaping and parking.