Planning application
Deva Stadium, Bumpers Lane, Sealand, Chester, CH1 4LT
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Construction of 4no. Padel Courts, 1no. Single Padel Court, 3no. Pickleball Courts, and Central Hub containing Changing, WCs, Reception and Cafe at Chester Football Club
As published by the council, reference FUL/000869/25
Application record
- Reference
- FUL/000869/25
- Type
- Full - Building Works
- Status
- Notice of Decision Issued
- Decision
- Granted As published: A01 Approved
- Received
- 13 Oct 2025
- Validated
- 11 Nov 2025
- Decided
- 7 Aug 2026
- Ward
- Flintshire Ward Queensferry and Sealand
- Parish
- Flintshire Community Sealand Community Council
- Decision by
- DEL Delegated - Officer
- Postcode
- CH1 4LT
Timeline
Dates from the published record
-
13 Oct 2025
Received by Flintshire
-
11 Nov 2025
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
7 Aug 2026
Decision issued: A01 Approved
Documents
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Flintshire granted permission on 7 August 2026, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land At Bumpers Lane Chester
97% historically approved · decision due ~31 Aug
LED Information Board
Awaiting decision Advertising 3 docs -
Land At Chester Football Club Deva Stadium Bumpers Lane Chester Cheshire
Construction of 4no. padel courts, 1no. single padel court, 3no. pickleball courts, and central hub containing changing, WCs, reception, and cafe and parking area.
Granted Full applications 39 docs -
Swansway Chester Citroen Fiat Bumpers Lane Chester CH1 4LT
Extension of the existing sales display area
Granted Full applications Extension 12 docs -
Swansway Chester Citroen Fiat Bumpers Lane Chester CH1 4LT
Addition of five totems including one 6m high internally illuminated totem and four 1.9m high parking zoning totems.
Refused Advertising 7 docs -
Unit 1 Chester Commerce Park Bumpers Lane Chester Cheshire CH1 4LT
Installation of 3 No. illuminated fascia signs, 1 No. freestanding illuminated pylon sign and 1 No. 2 bay sign
Granted Advertising 10 docs -
16 Knutsford Way Chester CH1 4NS
Erection of 2.4m high palisade fencing
Granted Full applications 11 docs
Other full applications
In Flintshire
-
FUL/000663/26 Granted
40, Main Road, Higher Kinnerton, Chester, CH4 9AJ
1st floor extension to property
-
FUL/000657/26 Granted
Tamarisk, Bryntirion Road, Bagillt, CH6 6BZ
Proposed Level access drive with dropped kerbs & retaining walls with step lift. - disabled works
-
FUL/000652/26 Granted
Unit 4, DANIEL OWEN PRECINCT, Mold, CH7 1AP
Full Planning Application for Change of Use from Use Class A1 (Shop) to Use Class and A3 (Food and Drink) with Takeaway Provision
-
FUL/000644/26 Withdrawn
33, Chester Road West, Queensferry, Deeside, CH5 1SA
The demolition of the existing former office building and the erection of four dwelling houses, comprising two three-bedroom dwellings (House Type A) and two two-bedroom dwellings (House Type B), together with associated access, parking, landscaping and amenity space. - This is a resubmission (FUL
-
FUL/000329/26 Granted
STAYCOLD EXPORT LTD, Unit 2a, HAWARDEN INDUSTRIAL PARK, Manor Lane, Hawarden, Deeside, CH5 3US
Installation of a new temporary storage unit adjacent to the existing building - refer to appended documents for further details. New site layout required, no adjustment to site drainage, no change in height or scale of existing building.