Planning application
Elms Farm Barn, Bretton Lane, Bretton, CH4 0DX
Works: Windows or glazing
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Replace three existing single glazed steel windows.
As published by the council, reference FUL/000786/22
Application record
- Reference
- FUL/000786/22
- Type
- Full - Building Works
- Status
- Notice of Decision Issued
- Decision
- Granted As published: A01 Approved
- Received
- 15 Dec 2022
- Validated
- 21 Dec 2022
- Decided
- 24 Feb 2023
- Ward
- Flintshire Ward Broughton North East
- Parish
- Flintshire Community Broughton Bretton Council
- Decision by
- DEL Delegated - Officer
- Postcode
- CH4 0DX
Timeline
Dates from the published record
-
15 Dec 2022
Received by Flintshire
-
21 Dec 2022
Validated
Checked as complete and ready for consideration.
-
24 Feb 2023
Decision issued: A01 Approved
-
20 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Flintshire granted permission on 24 February 2023, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
The Orchard, Bretton Lane, Bretton, Chester, CH4 0DW
Removal of current UPVC porch and downstairs toilet. Extension of current integrated garage to end flush with the principal elevation (to include enclosed porch). Conversion of current garage area into office, downstairs toilet, and storage room.
Granted Full applications Extension 7 docsSmall domestic -
Tall Trees, Bretton Lane, Bretton, Chester, CH4 0DW
Proposed two storey rear extension and full render to existing property
Granted Full applications Extension 12 docs -
DIGBY FARM, Bretton Lane, Bretton, Chester, CH4 0DX
87% historically approved · decision due ~15 Sep
Proposed new dormer bungalow
Awaiting decision Full applications Loft or dormer 7 docs -
Centre Managers Office, BROUGHTON SHOPPING PARK, Chester Road, Broughton, Chester, CH4 0DE
One illuminated mounted logo sign
Granted Advertising 6 docs -
Centre Managers Office, BROUGHTON SHOPPING PARK, Chester Road, Broughton, Chester, CH4 0DE
Installation of air conditioning unit
Granted Full applications 9 docs -
1 Barnfield, BRETTON COURT MEWS, Bretton Road, Bretton, CH4 0DN
Retrospective flue to side of detached garden building
Granted Full applications 7 docs
Other full applications
In Flintshire
-
FUL/000660/26 Granted
BRITISH AEROSPACE AIRBUS LTD, Chester Road, Broughton, Chester, CH4 0DR
Proposed External LIghting Columns to Existing Trailer Park Area.
-
FUL/000509/26 Granted
OCHA BUNGALOW, Stryt Isa, Hope, Chester, CH4 0JY
Proposed demolition of existing dwellinghouse and the construction of new dwelling and all other associated works relating to.
-
FUL/000782/26 Awaiting decision
The Homestead, Cefn Bychan Road, Pantymwyn, Mold, CH7 5EL
Resubmitted application following refusal for the demolition of existing dwelling and the construction of a high-quality replacement 2 storey, 4 bedroom dwelling, and erection of a detached double garage with associated hard and soft landscaping.
-
FUL/000610/26 Granted
39 - 41, Wrexham Street, Mold, CH7 1ET
Change of use from A1 Shop to D1 non residential institution and changes to the ground floor shopfront.
-
FUL/000618/26 Granted
Plot A, The Airfields, Northern Gateway, Deeside, CH5 2RD
Site alterations comprising the installation of plant and associated works to facilitate Electric Vehicle charging infrastructure