Planning application
FUL/000622/26
3, Fron Heulog, Ewloe, Deeside, CH5 3GG
Proposal
Extension and alterations to garage to provide home office in roofspace
As published by the council, reference FUL/000622/26
Timeline
Dates from the published record
-
15 Jul 2026
Received by Flintshire
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Flintshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
FUL/000080/26 Refused
3, Fron Heulog, Deeside, Ewloe, CH5 3GG
Extension and alterations to garage to provide home office in roofspace
-
LDP/000257/26 Granted
11, Greenvale Park, Hawarden, Deeside, CH5 3DP
Demolition of existing outrigger and erection of new single storey extension full width of house projecting 3.6m with a lean to roof
-
LDP/000639/26 Awaiting decision
THE WOODS, Level Road, Hawarden, Deeside, CH5 3JR
Rear extension, garage conversion.
-
LDC/000155/26 Granted
5, LEVEL COTTAGES, Level Road, Hawarden, Deeside, CH5 3JP
Certificate of Lawfulness for existing operational development comprising the extension and alteration of an existing detached outbuilding within the residential curtilage of the dwelling. The extension works were completed in December 2021 and the structure has remained in continuous existence since that date. The building is used solely for purposes incidental to the enjoyment of the main dwelling, including as a home office, gym and recreational space. It is not a separate dwelling and contains no sleeping accommodation. The development has been in place for more than four years and is therefore lawful through the passage of time.
Other full applications applications
In Flintshire
-
FUL/000284/26 Granted
Pickpocket Hall, Babell Road, Pantasaph, Holywell, CH8 8PW
Proposed demolition of a previous two-storey extension connecting two parts of a single dwelling and proposed replacement with a new two-storey extension along with associated internal layout alterations, a new first floor extension to the rear, varying the main driveway entrance to an existing alternative access and construction of a detached, single-storey pitched roof garage.
-
FUL/000643/26 Awaiting decision
50, The Boulevard, Broughton, Chester, CH4 0SW
Proposed 2 storey side extension with new side wall stepping in to follow boundary
-
FUL/000463/26 Granted
8 , Glyn Abbott Avenue, Holywell, CH8 7ED
Proposed Sun Lounge Extension for Residential Purposes
-
FUL/000634/26 Awaiting decision
UNIT 1, Gas Lane, Mold, CH7 1UR
Retrospective change of use of the building from a car repair garage to a women- only gym and fitness studio, with no external alterations and extentions. This is a resubmission of withdrawn application FUL/000183/26
-
FUL/000506/26 Granted
BUCKLEY CRICKET CLUB, Chester Road, Buckley, CH7 3AQ
Single-storey extension to the existing Buckley Cricket Club clubhouse to provide enlarged home and away changing rooms, shower facilities, WC accommodation and an officials' changing room, together with associated internal alterations. The proposal will improve and modernise the existing sports facilities for players and match officials. There is no change of use, and the building will remain in use as a cricket clubhouse and community sports facility.