Planning application
133 Gladstone Way Hawarden Deeside, Clwyd CH5 3HE
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Convert garage and attic space into habitable accommodation
As published by the council, reference FUL/000207/23
Application record
- Reference
- FUL/000207/23
- Type
- Full - Building Works
- Status
- Notice of Decision Issued
- Decision
- Granted As published: A01 Approved
- Received
- 6 Mar 2023
- Validated
- 10 Mar 2023
- Decided
- 27 Apr 2023
- Ward
- Flintshire Ward Hawarden Aston
- Parish
- Flintshire Community Hawarden Community Council
- Decision by
- DEL Delegated - Officer
- Postcode
- CH5 3HE
Timeline
Dates from the published record
-
6 Mar 2023
Received by Flintshire
-
10 Mar 2023
Validated
Checked as complete and ready for consideration.
-
27 Apr 2023
Decision issued: A01 Approved
-
30 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Flintshire granted permission on 27 April 2023, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
31, Vickers Close, Hawarden, Deeside, CH5 3HU
Proposed construction of dormer to front of property originally approved in 2009, reference number 045995.
Granted Full applications Loft or dormer 8 docs -
2, Overlea Drive, Hawarden, Deeside, CH5 3HS
Proposed Side and first floor extensions to existing bungalow to create new dormer bungalow. Including demolition of existing garage.
Granted Full applications Extension Loft or dormer +1 22 docs -
17, Blackbrook Avenue, Hawarden, Deeside, CH5 3HJ
88% historically approved · decision due ~23 Nov
Rear two storey extension.
Awaiting decision Full applications Extension -
Land adj to Mansfield Cottage, Cottage Lane, Mancot, Deeside, CH5 2AZ
Erection of a single dwelling
Refused Outline 14 docsDomestic -
1, Brookleigh Avenue, Mancot, Deeside, CH5 2BB
Rear/side 2 storey extension front porch and driveway/hardstanding, replacement roof to existing outbuilding
Granted Full applications Extension Roofing 13 docsSmall domestic -
38 Overlea Drive Hawarden Deeside CH5 3HS
Proposed Attic Conversion and Single Storey rear and side extensions with a replacement of the existing garage to form a home office.
Granted Full applications Extension Loft or dormer 14 docsSmall domestic
Other full applications
In Flintshire
-
FUL/000608/26 Refused
ANWYLFA, Berthen Road, Lixwm, Holywell, CH8 8LT
Construction of First floor extension to provide 2 bedrooms and shower room.
-
FUL/000594/26 Refused
Land at The Feathers Courtyard, High Street, Bagillt, CH6 6HE
Proposed 2 bedroom Bungalow / Dwelling with car parking, and amenity space
-
FUL/000672/26 Granted
Ysgol Maes-Y-Felin, Pen Y Maes Road, Holywell, Flintshire, CH8 7EN
Siting of two shipping containers for Big Bocs Bwyd Community Project.
-
FUL/000667/26 Granted
55, High Street, Connahs Quay, Deeside, CH5 4DD
Replacement of the existing front elevation timber window, facing the public roadway, with a new aluminium/PVC window of a similar size and style. The replacement is proposed to improve the property's energy efficiency, reduce maintenance requirements, and enhance the overall appearance of the building. There is no change of use of the property as part of this proposal.
-
FUL/000811/26 Awaiting decision
Church of Jesus Christ Latter Day Saints, St David's Park Spine Road, Ewloe CH5 3XP
Demolition of the existing Church Stake Centre. Construction of a new Stake Centre with associated parking and landscaping.