Planning application
Ulubris, Tabernacle Street, Buckley, CH7 2JT
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Rear single storey extension
As published by the council, reference FUL/000117/23
Application record
- Reference
- FUL/000117/23
- Type
- Full - Building Works
- Status
- Notice of Decision Issued
- Decision
- Granted As published: A01 Approved
- Received
- 1 Feb 2023
- Validated
- 6 Feb 2023
- Decided
- 8 Mar 2023
- Ward
- Flintshire Ward Buckley Bistre West
- Parish
- Flintshire Community Buckley Town Council
- Decision by
- DEL Delegated - Officer
- Postcode
- CH7 2JT
Timeline
Dates from the published record
-
1 Feb 2023
Received by Flintshire
-
6 Feb 2023
Validated
Checked as complete and ready for consideration.
-
8 Mar 2023
Decision issued: A01 Approved
-
20 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Flintshire granted permission on 8 March 2023, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Westwood Community Primary School Padeswood Road North Buckley Flintshire CH7 2JT
Application for approval of details reserved by condition no 3 (Drainage General Arrangement) attached to planning Permission reference 062012.
Granted Conditions 10 docs -
Hibberts Corner, Masonic Hall, Bistre Avenue, Buckley, CH7 2JA
Change of use from use D2 (Assembly and Leisure) to house 4no. C3 (c) (Residential) self-contained, 2 bedroomed flats (approx. around 10 - 12 occupants) including all alteration works
Granted Full applications New dwelling 11 docs -
1-3, Mold Road, Buckley, CH7 2JA
Proposed erection of two storey extension above existing shop to provide 6no. apartment and associated development.
Refused Full applications Extension 9 docsSeveral homes -
Black Horse Hotel, Mold Road, Buckley, CH7 2JB
Former Black Horse Hotel.
Granted Prior approval 7 docs -
4, Brunswick Road, Buckley, CH7 2EF
Change of use from a Class A1 to a Class A3. Installing a kitchen so that we can serve sandwiches, toasties, hot and cold drinks to the public. As it will become a Stay and Play Cafe.
Granted Full applications 13 docs -
BLACK HORSE HOTEL, Mold Road, Buckley, CH7 2JB
Erection of convenience retail store with parking
Withdrawn Full applications 15 docs
Other full applications
In Flintshire
-
FUL/000660/26 Granted
BRITISH AEROSPACE AIRBUS LTD, Chester Road, Broughton, Chester, CH4 0DR
Proposed External LIghting Columns to Existing Trailer Park Area.
-
FUL/000509/26 Granted
OCHA BUNGALOW, Stryt Isa, Hope, Chester, CH4 0JY
Proposed demolition of existing dwellinghouse and the construction of new dwelling and all other associated works relating to.
-
FUL/000782/26 Awaiting decision
The Homestead, Cefn Bychan Road, Pantymwyn, Mold, CH7 5EL
Resubmitted application following refusal for the demolition of existing dwelling and the construction of a high-quality replacement 2 storey, 4 bedroom dwelling, and erection of a detached double garage with associated hard and soft landscaping.
-
FUL/000610/26 Granted
39 - 41, Wrexham Street, Mold, CH7 1ET
Change of use from A1 Shop to D1 non residential institution and changes to the ground floor shopfront.
-
FUL/000618/26 Granted
Plot A, The Airfields, Northern Gateway, Deeside, CH5 2RD
Site alterations comprising the installation of plant and associated works to facilitate Electric Vehicle charging infrastructure