Planning application
Halfway House, Allt y Golch, Carmel, Flintshire, CH8 8QT
Works: Demolition
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Demolition of former Halfway House & replacement with two detached dwellings, associated parking & residential amenity
As published by the council, reference FUL/000064/22
Application record
- Reference
- FUL/000064/22
- Type
- Full - Building Works
- Status
- Notice of Decision Issued
- Decision
- Granted As published: A01 Approved
- Received
- 18 May 2022
- Validated
- 18 May 2022
- Decided
- 21 Mar 2023
- Ward
- Flintshire Ward Whitford
- Parish
- Flintshire Community Whitford Community Council
- Decision by
- DEL Delegated - Officer
- Postcode
- CH8 8QT
Timeline
Dates from the published record
-
18 May 2022
Received by Flintshire
-
21 Mar 2023
Decision issued: A01 Approved
-
7 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
25 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Flintshire granted permission on 21 March 2023, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Halfway House Allt Y Golch Carmel Holywell CH8 8QT
Application for approval of details reserved by condition no 3 (Materials) attached to Planning Permission reference 058860.
Granted Conditions 14 docs -
20, Ffordd Ffynnon, Carmel, Holywell, CH8 8SJ
Lawful development certificate for side dormer with side window.
Granted Lawful development Loft or dormer Windows or glazing 13 docs -
TY NEWYDD, Mertyn Lane, Carmel, Holywell, CH8 8QN
Relocate Air Source Heat Pump, from the front of the house to the side of the house.
Granted Full applications 10 docs -
23 Mertyn Lane Carmel Holywell CH8 8QN
Loft conversion to form office and single-storey rear extension to form kitchen and sun lounge
Refused Full applications Extension Loft or dormer 23 docsSmall domestic -
Trem Y Don Celyn Lane Carmel Holywell CH8 8QW
Demolition of Garage, rear bedroom, conservatory & front bay. Proposedreplacement roof (same ridge height) with rear dormer, rear extension,front extension & porch.
Granted Full applications Extension Loft or dormer +2 22 docsSmall domestic -
6 Llys Y Mor Carmel Holywell CH8 8SR
Retrospective application for a dormer window to front elevation
Granted Full applications Loft or dormer Windows or glazing 14 docs
Other full applications
In Flintshire
-
FUL/000608/26 Refused
ANWYLFA, Berthen Road, Lixwm, Holywell, CH8 8LT
Construction of First floor extension to provide 2 bedrooms and shower room.
-
FUL/000594/26 Refused
Land at The Feathers Courtyard, High Street, Bagillt, CH6 6HE
Proposed 2 bedroom Bungalow / Dwelling with car parking, and amenity space
-
FUL/000672/26 Granted
Ysgol Maes-Y-Felin, Pen Y Maes Road, Holywell, Flintshire, CH8 7EN
Siting of two shipping containers for Big Bocs Bwyd Community Project.
-
FUL/000667/26 Granted
55, High Street, Connahs Quay, Deeside, CH5 4DD
Replacement of the existing front elevation timber window, facing the public roadway, with a new aluminium/PVC window of a similar size and style. The replacement is proposed to improve the property's energy efficiency, reduce maintenance requirements, and enhance the overall appearance of the building. There is no change of use of the property as part of this proposal.
-
FUL/000811/26 Awaiting decision
Church of Jesus Christ Latter Day Saints, St David's Park Spine Road, Ewloe CH5 3XP
Demolition of the existing Church Stake Centre. Construction of a new Stake Centre with associated parking and landscaping.