Planning application
Hynet Carbon Dioxide Pipeline
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
DCO Requirement 6 Construction Environmental Management Plan (CEMP) - Stage 2b(ii)
As published by the council, reference DCO/001052/25
Application record
- Reference
- DCO/001052/25
- Status
- Notice of Decision Issued
- Decision
- Granted As published: A01 Approved
- Received
- 8 Dec 2025
- Validated
- 17 Dec 2025
- Decided
- 8 Apr 2026
- Decision by
- DEL Delegated - Officer
Site history
Applications at this address on the Flintshire register
This site has had 16 applications since 2025: 12 approved, 0 refused.
-
DCO/000710/26 Awaiting decision
Hynet Carbon Dioxide Pipeline
DCO Requirement 5 Scheme Design (Northop Hall AGI, Work No.45; Details for all sites)
-
DCO/000705/26 Granted
Hynet Carbon Dioxide Pipeline
DCO Requirement 7 Construction Traffic Management Plan (CTMP) - Annex G
-
DCO/000673/26 Awaiting decision
Hynet Carbon Dioxide Pipeline
DCO Requirement 5 Scheme Design (Flint AGI, Work No.48; Details for All Sites)
-
DCO/000620/26 Awaiting decision
Hynet Carbon Dioxide Pipeline
DCO Requirement 9 Surface Water Drainage (Flint AGI Work No. 48)
-
DCO/000614/26 Granted
Hynet Carbon Dioxide Pipeline
DCO Requirement 6 Construction Environmental Management Plan (CEMP) - Stage 5b
-
DCO/000232/26 Granted
Hynet Carbon Dioxide Pipeline
DCO Requirement 6 Construction Environmental Management Plan (CEMP) - Stage 4b
-
DCO/000172/26 Granted
Hynet Carbon Dioxide Pipeline
DCO Requirement 11 Written Scheme of Investigation (WSI) for Phase 2 (Main Works) Archaeology Mitigation
-
DCO/000126/26 Granted
Hynet Carbon Dioxide Pipeline
DCO Requirement 7 Construction Traffic Management Plan (CTMP)
-
DCO/000076/26 Granted
Hynet Carbon Dioxide Pipeline
Partial Discharge of Requirement 12, Landscape and Ecological Management Plan (LEMP); Stages 2b (ii), 3b, 4b
-
DCO/001073/25 Granted
Hynet Carbon Dioxide Pipeline
Discharge of Requirement 11 (Written Scheme of Investigation) - Priority Sites
Timeline
Dates from the published record
-
8 Dec 2025
Received by Flintshire
-
17 Dec 2025
Validated
Checked as complete and ready for consideration.
-
8 Apr 2026
Decision issued: A01 Approved
-
28 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Flintshire granted permission on 8 April 2026, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Flintshire's portal will say. Our guide explains the common types.