Planning application

Hynet Carbon Dioxide Pipeline

Withdrawn Flintshire DCO/000676/25

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

DCO Requirment 6 Construction Environmental Management Plan (CEMP) - Stage 2

As published by the council, reference DCO/000676/25

Application record

Reference
DCO/000676/25
Status
Withdrawn
Decision
Withdrawn As published: Z01 Withdrawn
Received
7 Aug 2025
Validated
12 Aug 2025
Decided
6 Jan 2026

Site history

Applications at this address on the Flintshire register

This site has had 16 applications since 2025: 12 approved, 0 refused.

  • DCO/000710/26 Awaiting decision

    Hynet Carbon Dioxide Pipeline

    DCO Requirement 5 Scheme Design (Northop Hall AGI, Work No.45; Details for all sites)

    Submitted 22 Aug 2026
  • DCO/000705/26 Granted

    Hynet Carbon Dioxide Pipeline

    DCO Requirement 7 Construction Traffic Management Plan (CTMP) - Annex G

    Submitted 20 Aug 2026
  • DCO/000673/26 Awaiting decision

    Hynet Carbon Dioxide Pipeline

    DCO Requirement 5 Scheme Design (Flint AGI, Work No.48; Details for All Sites)

    Submitted 5 Aug 2026
  • DCO/000620/26 Awaiting decision

    Hynet Carbon Dioxide Pipeline

    DCO Requirement 9 Surface Water Drainage (Flint AGI Work No. 48)

    Submitted 15 Jul 2026
  • DCO/000614/26 Granted

    Hynet Carbon Dioxide Pipeline

    DCO Requirement 6 Construction Environmental Management Plan (CEMP) - Stage 5b

    Decided 15 Sep 2026
  • DCO/000232/26 Granted

    Hynet Carbon Dioxide Pipeline

    DCO Requirement 6 Construction Environmental Management Plan (CEMP) - Stage 4b

    Decided 27 Apr 2026
  • DCO/000172/26 Granted

    Hynet Carbon Dioxide Pipeline

    DCO Requirement 11 Written Scheme of Investigation (WSI) for Phase 2 (Main Works) Archaeology Mitigation

    Decided 20 Mar 2026
  • DCO/000126/26 Granted

    Hynet Carbon Dioxide Pipeline

    DCO Requirement 7 Construction Traffic Management Plan (CTMP)

    Decided 25 Feb 2026
  • DCO/000076/26 Granted

    Hynet Carbon Dioxide Pipeline

    Partial Discharge of Requirement 12, Landscape and Ecological Management Plan (LEMP); Stages 2b (ii), 3b, 4b

    Decided 24 Apr 2026 Conditions
  • DCO/001073/25 Granted

    Hynet Carbon Dioxide Pipeline

    Discharge of Requirement 11 (Written Scheme of Investigation) - Priority Sites

    Decided 21 Jan 2026 Conditions

Timeline

Dates from the published record

  1. 7 Aug 2025

    Received by Flintshire

  2. 12 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 6 Jan 2026

    Decision issued: Z01 Withdrawn

  4. 28 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

25 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What withdrawal means

The applicant withdrew this application before Flintshire decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Flintshire's portal will say. Our guide explains the common types.