Planning application
Denfield Park Den Road Kirkcaldy Fife
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of two synthetic sports pitches and associated works including installation of boundary fence and lighting (Amendment to 25/03248/FULL)
As published by the council, reference 26/02297/FULL
Application record
- Reference
- 26/02297/FULL
- Type
- Full Planning Permission
- Status
- Registered
- Received
- 20 Aug 2026
- Validated
- 1 Sep 2026
- Ward
- Kirkcaldy East
- Parish
- Bennochy / Hayfield (No CC)
Timeline
Dates from the published record
-
20 Aug 2026
Received by Fife
-
1 Sep 2026
Validated
Checked as complete and ready for consideration.
-
4 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Fife took a median of 44 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Kirkcaldy
43 applications on PlanIndex · across 2 councils · 88% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Fife for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Denfield Park Den Road Kirkcaldy Fife
Installation of two synthetic sports pitches and associated works including installation of boundary fence and lighting
Granted Full applications 34 docsSmall domestic -
This Site Address Is Still To Be Recorded On Our Property Database (temporary Address Used) Fife
Notification of intention to install a 9m and an 8m high pole - North-West of 34/36 and South of 64 Thornhill Drive, Kirkcaldy
Decided Telecoms 3 docs -
This Site Address Is Still To Be Recorded On Our Property Database (temporary Address Used) Fife
Notification of intention to install a 9m high pole - East of 13/15 Thornhill Drive, Kirkcaldy, KY2 5BJ
Decided Telecoms -
This Site Address Is Still To Be Recorded On Our Property Database (temporary Address Used) Fife
Notification of intention to install a 9m high pole - West of 66-71 Smeaton Gardens, Kirkcaldy
Decided Telecoms 2 docs -
Sephra House Denburn Road Kirkcaldy Fife KY1 2BJ
99% historically approved · decision due ~25 Apr
Compliance with condition 2 of approved 23/03069/FULL - NO DEVELOPMENT SHALL COMMENCE ON SITE until the risk of actual or potential land contamination at the site has been investigated and a Preliminary Risk Assessment (Phase I Desk Study) has been submitted by the developer to and approved in writing by the planning authority. Where further investigation is recommended in the Preliminary Risk Assessment, no development shall commence until a suitable Intrusive Investigation (Phase II Investigation Report) has been submitted by the developer to and approved in writing by the planning authority. Where remedial action is recommended in the Phase II Intrusive Investigation Report, no development shall commence until a suitable Remedial Action Statement has been submitted by the developer to and approved in writing by the planning authority. The Remedial Action Statement shall include a timetable for the implementation and completion of the approved remedial measures.
Awaiting decision Conditions 10 docs -
96 Dunnikier Road Kirkcaldy Fife KY2 5AW
Alterations and single storey extension to rear of dwellinghouse
Granted Full applications Extension 10 docsSmall domestic
Other full applications applications
In Fife
-
26/01900/FULL Granted
The Steadings Kinaldy Farm Lathockar St Andrews Fife KY16 8NA
Change of use and refurbishment of steading to form dwellinghouse (Class 9) including installation of windows and doors and rooflights and solar panels including replacement of roofing and formation of hardstanding and ancillary drainage (renewal of 23/00519/FULL)
-
26/01862/FULL Granted
56 High Street Elie Leven Fife KY9 1DB
Installation of 4 replacement windows to dormer extension to rear of dwellinghouse
-
26/02417/FULL Awaiting decision
41 Dronachy Road Kirkcaldy Fife KY2 5QL
Single storey front and side extension
-
26/02418/FULL Awaiting decision
10 Woodhead Street High Valleyfield Dunfermline Fife KY12 8SQ
Alterations to roof to rear of dwellinghouse
-
26/01282/FULL Granted
3 High Street Crail Anstruther Fife KY10 3TA
Installation of replacement windows and repainting of walls and front door