Skip to content
PlanIndex Get alerts
Menu

Planning application

4 Old Stables House Blair Castle Blair Culross Dunfermline Fife KY12 8JW

Granted Fife 26/01959/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

External alterations to existing detached garage

As published by the council, reference 26/01959/FULL

Application record

Reference
26/01959/FULL
Type
Full Planning Permission
Status
Decided
Decision
Application Permitted with Conditions
Received
15 Jul 2026
Validated
22 Jul 2026
Decided
8 Sep 2026
Ward
West Fife And Coastal Villages
Parish
Culross
Decision by
Delegated - Local Developments
Postcode
KY12 8JW

Timeline

Dates from the published record

  1. 15 Jul 2026

    Received by Fife

  2. 22 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. 8 Sep 2026

    Decision issued: Application Permitted with Conditions

  5. 9 Sep 2026

    Status changed to Awaiting decision

    Previously Registered.

Cases linked to this one on the register

  • Scottishbuildingwarrant: 26/01877/BW (Pending Consideration)

Who's behind it

Company information only, from the register and Companies House

SIGNAL ARCHITECTS LTD Agent, an architecture practice registered in Dunfermline

Active · incorporated 2014 · Dunfermline

19 applications on PlanIndex · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

  • 02 - EXISTING FLOOR PLAN, ELEVATIONS, AND PHOTOGRAPHS OF SITE Drawing · 15 Jul 2026
  • 03 - PROPOSED FLOOR PLAN, AND ELEVATIONS Drawing · 15 Jul 2026
  • 01 - LOCATION PLAN OS Extract · 15 Jul 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Fife granted permission on 8 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Fife

  • 26/02222/FULL Granted

    6 Morlich Park Dalgety Bay Dunfermline Fife KY11 9XW

    Alterations and single storey rear extension to rear of dwellinghouse with raised platform and steps

    13 Aug 2026 Full applications
  • 26/01271/FULL Granted

    6 Bankwell Road Anstruther Fife KY10 3DA

    Single storey extension to side of dwellinghouse and replacement double domestic garage

    5 May 2026 Full applications
  • 26/02097/FULL Granted

    50 High Street Pittenweem Anstruther Fife KY10 2PL

    Installation of replacement roof tiles and rainwater goods

    21 Jul 2026 Full applications
  • 26/02065/FULL Granted

    2 Blackwood Court Dunfermline Fife KY11 8TF

    Installation of raised decking to rear of dwellinghouse

    27 Jul 2026 Full applications
  • 26/01902/FULL Granted

    Rosyth Methodist Church Queensferry Road Rosyth Dunfermline Fife KY11 2JH

    Installation of 3 no. air source heat pumps

    7 Jul 2026 Full applications