Planning application
Heil Europe Ltd Block AF16 Taxi Way Hillend Industrial Park Dalgety Bay Fife
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a Class 5 industrial unit (extension between existing buildings), alterations to existing units, formation of car parking spaces, associated drainage infrastructure and alterations to access (amendment to 25/01861/FULL)
As published by the council, reference 26/00914/FULL
Application record
- Reference
- 26/00914/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Permitted with Conditions
- Received
- 25 Mar 2026
- Validated
- 27 Mar 2026
- Decided
- 14 May 2026
- Ward
- Inverkeithing And Dalgety Bay
- Parish
- Dalgety Bay and Hillend
- Decision by
- Delegated - Local Developments
Site history
Applications at this address on the Fife register
This site has had 3 applications since 2026: 2 approved, 0 refused.
-
25/01861/NMV1 Withdrawn
Heil Europe Ltd Block AF16 Taxi Way Hillend Industrial Park Dalgety Bay Fife
Erection of a Class 5 industrial unit (extension between existing buildings), alterations to existing units, formation of car parking spaces and associated drainage infrastructure. (Non Material Variation for removal of service yard to rear of the proposal. Amended fence line to rear of the proposal. New fire escape access path to rear of the proposal. Proposed drainage amended to match. Additional notes and information to yard at front of proposal to 25/01861/FULL)
-
25/01861/CND002 Granted
Heil Europe Ltd Block AF16 Taxi Way Hillend Industrial Park Dalgety Bay Fife
Compliance with Condition 2 of planning permission - Contaminated Land Survey
Timeline
Dates from the published record
-
25 Mar 2026
Received by Fife
-
27 Mar 2026
Validated
Checked as complete and ready for consideration.
-
14 May 2026
Decision issued: Application Permitted with Conditions
-
28 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Hypostyle Architects Agent, an architecture practice
27 applications on PlanIndex · across 11 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordHillend Engineering Ltd Applicant, an engineering consultancy
3 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
51 documents on file for this application
- APPROVED
- TRANSPORTATION
- MR JIM MCALEESE(FULL)
- PSAD
- 37 - CERTIFICATE APPENDIX 1
- 38 - CERTIFICATE APPENDIX 2
- 39 - VERIFICATION OF INSURANCE PROFESSIONAL INDEMNITY
- 19A - PROPOSED DRAINAGE LAYOUT
- SCOTTISH WATER
- LAND AND AIR QUALITY, PROTECTIVE SERVICES
- 29 - ATTENUATION STORAGE TANK MAINTENANCE SCHEDULE GUIDANCE
- 26 - ENGINEERING DRAINAGE STRATEGY
- 28 - DESIGN SUMMARY
- 30 - CERTIFICATE: DRAINAGE CHECKLIST
- 31 - SURFACE WATER CALCULATIONS
- 32 - GROUNDWATER CONCLUSION FOLLOWING SITE INVESTIGATION WORKS
- 27 - ENGINEERING REMEDIATION STRATEGY REPORT
- 23 - TRACKING LAYOUTS
- 24 - SECTION 56 LAYOUT AND DETAILS
- 25 - EXTERNAL YARD LAYOUT AND DETAILS
- 33 - SUDS TREATMENT TRAIN REV A
- 36 - ND PDE CAPACITY REVIEW _ DSCAS_0135744_S4J
- PSAD
- 34 - SILT TRAP MAINTENANCE SCHEDULE GUIDANCE
- 35 - VORTEX FLOW CONTROL MAINTENANCE SCHEDULE GUIDANCE
- 06 - EXISTING GROUND AND FIRST FLOOR PLANS
- 09 - EXISTING ELEVATIONS 1
- 10 - EXISTING ELEVATIONS 2
- 07 - EXISTING AND PROPOSED FLOOR PLAN
- 11 - PROPOSED FLOOR PLAN
- 14 - PROPOSED SECTIONS
- 12 - PROPOSED NORTH AND SOUTH ELEVATIONS
- 13 - PROPOSED EAST AND WEST ELEVATIONS
- 08 - EXISTING AND PROPOSED ROOF PLAN
- 02 - LOCATION PLAN
- 04 - EXISTING SITE PLAN
- 03 - PROPOSED BLOCK PLAN
- 05 - PROPOSED SITE PLAN
- 17 - LOW CARBON SUSTAINABILITY STATEMENT
- 22 - SITE INVESTIGATION REPORT PART 1
- 22 - SITE INVESTIGATION REPORT PART 2
- 22 - SITE INVESTIGATION REPORT PART 3
- 22 - SITE INVESTIGATION REPORT PART 4
- 22 - SITE INVESTIGATION REPORT PART 5
- 18 - LEVELS LAYOUT
- 19 - SUPERSEDED PROPOSED DRAINAGE LAYOUT
- 15 - PROPOSED GABION BASKET DETAIL
- 20 - PRE-DEVELOPMENT SURFACE WATER FLOWS
- 21 - POST DEVELOPMENT SURFACE WATER FLOWS
- 01 - LOCATION PLAN
- 16 - LOW CARBON CHECKLIST
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Fife granted permission on 14 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
25 Otterston Grove Dalgety Bay Dunfermline Fife KY11 9PA
Single storey extension to rear of dwellinghouse (Non Material Variation to reduce size of extension to 23/00133/FULL)
Granted Conditions Extension 6 docsSmall domestic -
Telecommunications Mast Adjacent Donibristle Industrial Park Ridge Way Dalgety Bay Fife
Notification of intention to upgrade equipment
Decided Telecoms 9 docs -
Telecommunications Mast Adjacent Donibristle Industrial Park Ridge Way Dalgety Bay Fife
Notification of intention to upgrade base station
Decided Telecoms 7 docs -
20 Fordell Bank Dalgety Bay Dunfermline Fife KY11 9NP
Change of use from public open space to garden ground including erection of boundary enclosure
Refused Full applications 14 docs -
Site Adjacent To Dalgety Bay Recycling Centre Ridge Way Hillend Industrial Park Dalgety Bay Fife
98% historically approved · decision due ~4 Dec
Compliance with Condition 4 of Planning Permission 24/00708/FULL - Gas Verification
Awaiting decision Conditions 6 docs -
Site Adjacent To Dalgety Bay Recycling Centre Ridge Way Hillend Industrial Park Dalgety Bay Fife
98% historically approved · decision due ~4 Dec
Compliance with Condition 3 of Planning Permission 24/00708/FULL - Implementation of gas protection
Awaiting decision Conditions 6 docs
Other full applications
In Fife
-
26/02136/FULL Granted
8 Hallowhill St Andrews Fife KY16 8SF
Single storey extension and replacement decking to the rear of dwellinghouse
-
26/01112/FULL Granted
Rathelpie Kennedy Gardens St Andrews Fife KY16 9DJ
Alterations including formation of entrance porch, orangery and terrace to first floor, single storey extension to rear, and erection of single domestic detached garage to front of dwellinghouse
-
26/02404/FULL Granted
West End Collessie Brae Collessie Cupar Fife KY15 7RQ
Alterations to external colour of lime wash
-
26/02326/FULL Granted
Cottage Bank Newmill Farm Foodie Cupar Fife KY15 4RF
Single storey extension to front of dwellinghouse
-
26/02309/FULL Granted
11 The Crescent Dura Den Pitscottie Cupar Fife KY15 5TL
Installation of solar panels and air source heat pump with associated apparatus