Skip to content
PlanIndex Get alerts
Menu

Planning application

Leuchars Station Army Base Innes Road Leuchars St Andrews Fife KY16 0JX

Granted Fife 25/03342/FULL Full Planning Permission

Works: Loft or dormer Roofing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of replacement roof covering, installation of rooflights, repointing works, and structural repairs to building

As published by the council, reference 25/03342/FULL

Application record

Reference
25/03342/FULL
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Application Permitted with Conditions
Received
10 Dec 2025
Validated
10 Dec 2025
Decided
30 Jul 2026
Ward
Tay Bridgehead
Parish
Leuchars
Decision by
Delegated - Local Developments
Postcode
KY16 0JX

Site history

Applications at this address on the Fife register

This site has had 13 applications since 2022: 13 approved, 0 refused.

  • 24/00101/CND003 Granted

    Leuchars Station Army Base Innes Road Leuchars St Andrews Fife KY16 0JX

    Condition Compliance with Planning Permission 24/00101/FULL - installation and testing of the approved gas mitigation system (Gas 3)

    Decided 5 Feb 2026 Conditions
  • 25/03331/LBC Granted

    Leuchars Station Army Base Innes Road Leuchars St Andrews Fife KY16 0JX

    Listed Building Consent for external works to building, including installation of replacement roof covering, installation of rooflights, repointing works, and structural repairs

    Decided 30 Jul 2026 Heritage and listed buildings
  • 20/01245/CND001 Granted

    Leuchars Station Army Base Innes Road Leuchars St Andrews Fife KY16 0JX

    Compliance with Condition 1 of Listed Building Consent 20/01245/LBC - Details of the louvres and flues

    Decided 1 Sep 2026 Conditions
  • 24/00101/CND005 Granted

    Leuchars Station Army Base Innes Road Leuchars St Andrews Fife KY16 0JX

    Compliance with condition 5 of approved 24/00101/FULL - BEFORE ANY WORKS COMMENCE ON SITE; full details including a manufacturer specification/brochure (if available) and scaled elevations of the substation associated with the development shall be submitted to and approved in writing by Fife Council as Planning Authority. Thereafter, the development shall be carried out in full accordance with any subsequently approved details, unless otherwise agree.

    Decided 3 Jul 2024 Conditions
  • 20/01252/CND005 Granted

    Leuchars Station Army Base Innes Road Leuchars St Andrews Fife KY16 0JX

    Compliance with Condition 5 of Planning Permission 20/01252/FULL - IN THE EVENT THAT CONTAMINATION NOT IDENTIFIED BY THE DEVELOPER

    Decided 30 Jan 2025 Conditions
  • 23/02470/CND003 Granted

    Leuchars Station Army Base Innes Road Leuchars St Andrews Fife KY16 0JX

    Compliance with Condition 3 of Planning Permission 23/02470/FULL -That BEFORE ANY WORKS START ON SITE, details of the cycle shelter materials shall be submitted for approval in writing by the Planning Authority. Thereafter the development shall be carried out in accordance with the details approved unless changes are subsequently agreed in writing with this Planning Authority.

    Decided 5 Feb 2024 Conditions
  • 23/02470/CND002 Granted

    Leuchars Station Army Base Innes Road Leuchars St Andrews Fife KY16 0JX

    Compliance with Condition 2 of Planning Permission 23/02470/FULL -That No development shall take place within the site until the implementation of a programme of archaeological work has been secured in accordance with a written scheme of investigation which has been submitted to and approved by the Local Planning Authority. The programme shall also include pre-development archaeological standing building recording of Hangar 55 (the "pre-change report").

    Decided 14 Feb 2024 Conditions
  • 24/00101/FULL Granted

    Leuchars Station Army Base Innes Road Leuchars St Andrews Fife KY16 0JX

    Erection of healthcare centre (Class 1A) including road access works with associated supporting infrastructure (demolition of existing building)

    Decided 20 Jun 2024 Full applications
  • 22/01570/CND002 Granted

    Leuchars Station Army Base Innes Road Leuchars St Andrews Fife KY16 0JX

    Compliance with Condition 2 of Planning Permission 22/01570/FULL - Development shall not commence until a gas mitigation (membrane) specification/foundation design, and a verification methodology (detailing proposed installation, testing and verification methods) have been submitted to the Local Planning Authority and Building Standards and Safety for comment and approval.

    Decided 17 Oct 2023 Conditions
  • 22/01570/CND005 Granted

    Leuchars Station Army Base Innes Road Leuchars St Andrews Fife KY16 0JX

    Compliance with Condition 5 of Planning Permission 22/01570/FULL -That BEFORE ANY WORKS START ON SITE, the developer shall secure the implementation of a programme of archaeological work in accordance with a detailed written scheme of investigation which has been submitted by the developer and approved in writing by this Planning Authority. The programme shall include pre-development archaeological standing building recording of the buildings to be demolished.

    Decided 17 Oct 2023 Conditions

Timeline

Dates from the published record

  1. 10 Dec 2025

    Received by Fife

  2. 30 Jul 2026

    Decision issued: Application Permitted with Conditions

  3. 6 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

AECOM Limited Agent, registered in London

Active · incorporated 1984 · London

304 applications on PlanIndex · across 77 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

38 documents on file for this application

  • APPROVED Decision · 30 Jul 2026
  • 02 - EXISTING FLOOR PLAN Approved · 10 Dec 2025
  • 03 - EXISTING ROOF PLAN Approved · 10 Dec 2025
  • 04 - EXISTING ELEVATIONS Approved · 10 Dec 2025
  • 05 - EXISTING 3D VIEWS Approved · 10 Dec 2025
  • 13 - NORTH HANGAR: DOWNTAKINGS: FLOOR PLAN Approved · 10 Dec 2025
  • 23 - SOUTH HANGAR: DOWNTAKINGS:FLOOR PLAN Approved · 10 Dec 2025
  • 14 - NORTH HANGAR: DOWNTAKINGS: ROOF PLAN Approved · 10 Dec 2025
  • 24 - SOUTH HANGAR: DOWNTAKINGS: ROOF PLAN Approved · 10 Dec 2025
  • 15 - NORTH HANGAR: DOWNTAKINGS: ELEVATIONS Approved · 10 Dec 2025
  • 25 - SOUTH HANGAR: DOWNTAKINGS:ELEVATIONS Approved · 10 Dec 2025
  • 16 - NORTH HANGAR: DOWNTAKINGS: SECTIONS SHEET 1 Approved · 10 Dec 2025
  • 17 - NORTH HANGAR: DOWNTAKINGS: SECTIONS SHEET 2 Approved · 10 Dec 2025
  • 26 - SOUTH HANGAR: DOWNTAKINGS: SECTIONS SHEET 1 Approved · 10 Dec 2025
  • 27 - SOUTH HANGAR: DOWNTAKINGS: SECTIONS SHEET 2 Approved · 10 Dec 2025
  • 06 - PROPOSED FLOOR PLAN Approved · 10 Dec 2025
  • 07 - PROPOSED ROOF PLAN Approved · 10 Dec 2025
  • 08 - NORTH HANGAR: PROPOSED FLOOR PLAN Approved · 10 Dec 2025
  • 18 - SOUTH HANGAR: PROPOSED FLOOR PLAN Approved · 10 Dec 2025
  • 09 - NORTH HANGAR: PROPOSED ROOF PLAN Approved · 10 Dec 2025
  • 19 - SOUTH HANGAR: PROPOSED ROOF PLAN Approved · 10 Dec 2025
  • 10 - NORTH HANGAR: PROPOSED ELEVATIONS Approved · 10 Dec 2025
  • 20 - SOUTH HANGAR: PROPOSED ELEVATIONS Approved · 10 Dec 2025
  • 11 - NORTH HANGAR: PROPOSED SECTIONS SHEET 1 Approved · 10 Dec 2025
  • 12 - NORTH HANGAR: PROPOSED SECTIONS SHEET 2 Approved · 10 Dec 2025
  • 21 - SOUTH HANGAR: PROPOSED SECTIONS SHEET 1 Approved · 10 Dec 2025
  • 22 - SOUTH HANGAR: PROPOSED SECTIONS SHEET 2 Approved · 10 Dec 2025
  • 29 - SPECIFICATION SHEET 1 Approved · 10 Dec 2025
  • 30 - SPECIFICATION SHEET 2 Approved · 10 Dec 2025
  • 28 - TYPICAL ROOF DETAILS Approved · 10 Dec 2025
  • 32 - CONDITION SURVEY REPORT Approved · 10 Dec 2025
  • 31 - DESIGN AND ACCESS STATEMENT Approved · 10 Dec 2025
  • 33 - DOOR INSPECTION REPORT Approved · 10 Dec 2025
  • 01 - LOCATION PLAN Approved · 10 Dec 2025
  • 35 - STRUCTURAL REPORT: APPENDIX B Approved · 10 Dec 2025
  • 36 - STRUCTURAL REPORT: APPENDIX C Approved · 10 Dec 2025
  • 37 - STRUCTURAL REPORT: APPENDIX D Approved · 10 Dec 2025
  • 34 - STRUCTURAL REPORT Approved · 10 Dec 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Fife granted permission on 30 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Fife

  • 26/02136/FULL Granted

    8 Hallowhill St Andrews Fife KY16 8SF

    Single storey extension and replacement decking to the rear of dwellinghouse

    Received 4 Aug, published by the council 14 Aug 2026 Full applications
  • 26/01112/FULL Granted

    Rathelpie Kennedy Gardens St Andrews Fife KY16 9DJ

    Alterations including formation of entrance porch, orangery and terrace to first floor, single storey extension to rear, and erection of single domestic detached garage to front of dwellinghouse

    Received 15 Apr, published by the council 28 Jul 2026 Full applications
  • 26/02404/FULL Granted

    West End Collessie Brae Collessie Cupar Fife KY15 7RQ

    Alterations to external colour of lime wash

    Received 31 Aug, published by the council 4 Sep 2026 Full applications
  • 26/02326/FULL Granted

    Cottage Bank Newmill Farm Foodie Cupar Fife KY15 4RF

    Single storey extension to front of dwellinghouse

    Received 24 Aug, published by the council 27 Aug 2026 Full applications
  • 26/02309/FULL Granted

    11 The Crescent Dura Den Pitscottie Cupar Fife KY15 5TL

    Installation of solar panels and air source heat pump with associated apparatus

    Received 21 Aug, published by the council 27 Aug 2026 Full applications