Planning application
Land To South Of Hill View Kinglassie Fife
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Formation of temporary access (2 years)
As published by the council, reference 25/03333/FULL
Application record
- Reference
- 25/03333/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Permitted with Conditions
- Received
- 9 Dec 2025
- Validated
- 16 Dec 2025
- Decided
- 10 Feb 2026
- Ward
- Glenrothes West And Kinglassie
- Parish
- Kinglassie
- Decision by
- Delegated - Local Developments
Site history
Applications at this address on the Fife register
This site has had 21 applications since 2023: 16 approved, 0 refused.
-
26/01723/FULL Granted
Land To South Of Hill View Kinglassie Fife
Substitution of house-types on approved plots 147, 148, and 149 (amendment to planning permission 22/01021/FULL)
-
25/03333/CND004 Granted
Land To South Of Hill View Kinglassie Fife
Compliance with Condition 4 of planning permission 25/03333/FULL - Cleaning
-
22/01021/NMV2 Decided
Land To South Of Hill View Kinglassie Fife
Residential development of 210 units, including 45 affordable units, with associated infrastructure including two vehicular access points, roads, landscaping, playpark and SuDS - Non-material variation for external alterations to 22/01021/FULL
-
25/03508/RCC Awaiting decision
Land To South Of Hill View Kinglassie Fife
Roads Construction Consent - Phase 4 of the construction of new roads, footways, drainage and associated utilities
-
25/02740/RCC Awaiting decision
Land To South Of Hill View Kinglassie Fife
Roads Construction Consent - New roads, footways, street lighting and associated drainage
-
24/03283/RCC Awaiting decision
Land To South Of Hill View Kinglassie Fife
Roads Construction Consent for construction of Phase 2 of housing development including roads, drainage and associated infrastructure
-
22/01021/CND026 Granted
Land To South Of Hill View Kinglassie Fife
Compliance with Condition 26 of Planning Permission 22/01021/FULL - PRIOR TO ANY WORKS COMMENCING ON SITE, a Construction Environmental Management Plan (CEMP) shall be submitted to Fife Council as Planning Authority for approval in writing. The CEMP shall include a pollution protection measures to avoid an impact on the environment, as well as a scheme of works designed to mitigate the effects on sensitive premises/areas (i.e. neighbouring properties and road) of dust, noise and vibration from construction of the proposed development. The use of British Standard BS 5228: Part 1: 2009 "Noise and Vibration Control on Construction and Open Sites" and BRE Publication BR456 - February 2003 "Control of Dust from Construction and Demolition Activities" should be consulted. It shall provide the following details: - Site working hours; - Adherence to good practise in protecting the environment and ecology; - Dust, noise and vibration suppression; and - Protection of water environment.
-
22/01021/CND031 Granted
Land To South Of Hill View Kinglassie Fife
Compliance with Condition 31 of Planning Permission 22/01021/FULL - PRIOR TO ANY WORKS COMMENCING ON SITE, a maintenance and aftercare strategy for the equipped play area shall be submitted for the written approval of the Planning Authority. Thereafter, the equipped play area shall be maintained in accordance with the approved strategy for the lifetime of the development.
-
22/01021/CND003 Awaiting decision
Land To South Of Hill View Kinglassie Fife
Compliance with Condition 3 of Planning Permission 22/01021/FULL - PRIOR TO ANY WORKS COMMENCING ON SITE, a public art strategy including the details of the proposed items of work relating to this strategy shall be submitted for the written approval of Fife Council as Planning Authority. The strategy shall demonstrate that the value of the works contributing to the public art strategy shall meet the terms of the Council's Guidance on Public Art in terms of the financial value of the items of work. The strategy shall propose a scheme of public consultation which shall involve a local community group or groups (if available) and shall include a phasing timescale for the implementation of the public art works. Thereafter the public art works shall be carried out entirely in accordance with the details and phasing approved under this condition and will be maintained for the lifetime of the development by the applicant or other agreed party.
-
22/01021/CND019 Granted
Land To South Of Hill View Kinglassie Fife
Compliance with Condition 19 of Planning Permission 22/01021/FULL - NO DEVELOPMENT SHALL COMMENCE ON SITE until the risk of actual or potential land contamination at the site has been investigated and a Preliminary Risk Assessment (Phase I Desk Study) has been submitted by the developer to and approved in writing by the planning authority. Where further investigation is recommended in the Preliminary Risk Assessment, no development shall commence until a suitable Intrusive Investigation (Phase II Investigation Report) has been submitted by the developer to and approved in writing by the planning authority. Where remedial action is recommended in the Phase II Intrusive Investigation Report, no development shall commence until a suitable Remedial Action Statement has been submitted by the developer to and approved in writing by the planning authority. The Remedial Action Statement shall include a timetable for the implementation and completion of the approved remedial measures. All land contamination reports shall be prepared in accordance with CLR11, PAN 33 and the Council's Advice for Developing Brownfield Sites in Fife documents or any subsequent revisions of those documents. Additional information can be found at www.fifedirect.org.uk/contaminatedland.
Timeline
Dates from the published record
-
9 Dec 2025
Received by Fife
-
16 Dec 2025
Validated
Checked as complete and ready for consideration.
-
10 Feb 2026
Decision issued: Application Permitted with Conditions
-
13 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
25/03333/CND004 Granted
Land To South Of Hill View Kinglassie Fife
Compliance with Condition 4 of planning permission 25/03333/FULL - Cleaning
Who's behind it
Company information only, from the register and Companies House
Quale Homes Ltd Agent, a developer registered in Cupar
Active · incorporated 2016 · Cupar
8 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
- APPROVED
- PSAD
- 02 - SITE PLAN
- 03 - SUPPORTING STATEMENT
- 01 - LOCATION PLAN
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Fife granted permission on 10 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land To South Of Hill View Kinglassie Fife
Compliance with Condition 26 of Planning Permission 22/01021/FULL - PRIOR TO ANY WORKS COMMENCING ON SITE, a Construction Environmental Management Plan (CEMP) shall be submitted to Fife Council as Planning Authority for approval in writing. The CEMP shall include a pollution protection measures to avoid an impact on the environment, as well as a scheme of works designed to mitigate the effects on sensitive premises/areas (i.e. neighbouring properties and road) of dust, noise and vibration from construction of the proposed development. The use of British Standard BS 5228: Part 1: 2009 "Noise and Vibration Control on Construction and Open Sites" and BRE Publication BR456 - February 2003 "Control of Dust from Construction and Demolition Activities" should be consulted. It shall provide the following details: - Site working hours; - Adherence to good practise in protecting the environment and ecology; - Dust, noise and vibration suppression; and - Protection of water environment.
Granted Conditions Demolition 5 docs -
Land To South Of Hill View Kinglassie Fife
Compliance with Condition 31 of Planning Permission 22/01021/FULL - PRIOR TO ANY WORKS COMMENCING ON SITE, a maintenance and aftercare strategy for the equipped play area shall be submitted for the written approval of the Planning Authority. Thereafter, the equipped play area shall be maintained in accordance with the approved strategy for the lifetime of the development.
Granted Conditions 5 docs -
Land To South Of Hill View Kinglassie Fife
98% historically approved · decision due ~8 Mar
Compliance with Condition 3 of Planning Permission 22/01021/FULL - PRIOR TO ANY WORKS COMMENCING ON SITE, a public art strategy including the details of the proposed items of work relating to this strategy shall be submitted for the written approval of Fife Council as Planning Authority. The strategy shall demonstrate that the value of the works contributing to the public art strategy shall meet the terms of the Council's Guidance on Public Art in terms of the financial value of the items of work. The strategy shall propose a scheme of public consultation which shall involve a local community group or groups (if available) and shall include a phasing timescale for the implementation of the public art works. Thereafter the public art works shall be carried out entirely in accordance with the details and phasing approved under this condition and will be maintained for the lifetime of the development by the applicant or other agreed party.
Awaiting decision Conditions 4 docs -
Land To South Of Hill View Kinglassie Fife
Compliance with Condition 19 of Planning Permission 22/01021/FULL - NO DEVELOPMENT SHALL COMMENCE ON SITE until the risk of actual or potential land contamination at the site has been investigated and a Preliminary Risk Assessment (Phase I Desk Study) has been submitted by the developer to and approved in writing by the planning authority. Where further investigation is recommended in the Preliminary Risk Assessment, no development shall commence until a suitable Intrusive Investigation (Phase II Investigation Report) has been submitted by the developer to and approved in writing by the planning authority. Where remedial action is recommended in the Phase II Intrusive Investigation Report, no development shall commence until a suitable Remedial Action Statement has been submitted by the developer to and approved in writing by the planning authority. The Remedial Action Statement shall include a timetable for the implementation and completion of the approved remedial measures. All land contamination reports shall be prepared in accordance with CLR11, PAN 33 and the Council's Advice for Developing Brownfield Sites in Fife documents or any subsequent revisions of those documents. Additional information can be found at www.fifedirect.org.uk/contaminatedland.
Granted Conditions 10 docs -
Land To South Of Hill View Kinglassie Fife
Compliance with Condition 25 of Planning Permission 22/01021/FULL - PRIOR TO ANY WORKS COMMENCING ON SITE, samples of the external construction materials finishes of the dwellings (in particular relating to the roof, windows and walls) and roads, driveways and footways shall be submitted to and agreed in writing with the Council as Planning Authority. Thereafter the dwellinghouses shall be constructed and finished in full accordance with the agreed samples prior to occupation.
Granted Conditions Windows or glazing 22 docs -
Land To South Of Hill View Kinglassie Fife
Compliance with Condition 22 of Planning Permission 22/01021/FULL - No development shall commence on site until; a) a scheme of intrusive site investigations has been carried out on site to establish the risks posed to the development by past coal mining activity, and; b) any remediation works and/or mitigation measures to address land instability arising from coal mining legacy, as may be necessary, have been implemented on site in full in order to ensure that the site is made safe and stable for the development proposed. The intrusive site investigations and remedial works shall be carried out in accordance with authoritative UK guidance.
Granted Conditions 9 docs
Other full applications
In Fife
-
26/02136/FULL Granted
8 Hallowhill St Andrews Fife KY16 8SF
Single storey extension and replacement decking to the rear of dwellinghouse
-
26/01112/FULL Granted
Rathelpie Kennedy Gardens St Andrews Fife KY16 9DJ
Alterations including formation of entrance porch, orangery and terrace to first floor, single storey extension to rear, and erection of single domestic detached garage to front of dwellinghouse
-
26/02404/FULL Granted
West End Collessie Brae Collessie Cupar Fife KY15 7RQ
Alterations to external colour of lime wash
-
26/02326/FULL Granted
Cottage Bank Newmill Farm Foodie Cupar Fife KY15 4RF
Single storey extension to front of dwellinghouse
-
26/02309/FULL Granted
11 The Crescent Dura Den Pitscottie Cupar Fife KY15 5TL
Installation of solar panels and air source heat pump with associated apparatus