Planning application

Lower Largo W W T W Serpentine Walk Bourtree Brae Lower Largo Leven Fife KY8 6JH

Granted Fife 25/02526/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use from agricultural land to allow for installation of plant and associated equipment, erection of fencing, installation of hardstanding, and formation of access

As published by the council, reference 25/02526/FULL

Application record

Reference
25/02526/FULL
Type
Full Planning Permission
Status
Decided
Decision
Application Permitted with Conditions
Received
9 Sep 2025
Validated
15 Oct 2025
Decided
9 Jan 2026
Ward
Leven, Kennoway And Largo
Parish
Largo Area
Decision by
Delegated - Local Developments
Postcode
KY8 6JH

Timeline

Dates from the published record

  1. 9 Sep 2025

    Received by Fife

  2. 15 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 9 Jan 2026

    Decision issued: Application Permitted with Conditions

  4. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Lower Largo W W T W Serpentine Walk Bourtree Brae Lower Largo Leven Fife KY8 6JH

    25/01396/CND002 Submitted 19 Feb 2026 0m away

    Compliance with Condition 2 of Planning Permission 25/01396/FULL - Construction Traffic Management Plan

    Granted Conditions 6 docs
  • 5 The Temple Lower Largo Leven Fife KY8 6JH

    20/02595/NMV1 Submitted 10 Feb 2021 79m away

    Alterations and single storey extension to front of dwellinghouse (Non Material Variation to approved 20/02595/FULL to alter window to front)

    Granted Conditions Extension Windows or glazing 3 docs
    Small domestic
  • Temple P C The Temple Lower Largo Leven Fife KY8 6JH

    24/00634/FULL Submitted 8 Mar 2024 94m away

    Erection of modular building and refurbishment of existing toilet block and formation of ramp with handrails

    Granted Full applications 12 docs
  • Lower Largo W W T W Serpentine Walk Bourtree Brae Lower Largo Leven Fife KY8 6JH

    25/02526/NMV1 Submitted 8 Apr 2026 145m away

    Change of use from agricultural land to allow for installation of plant and associated equipment, erection of fencing, installation of hardstanding, and formation of access (Non Material Variation for installation of new chamber 1.1m above ground level to 25/02526/FULL)

    Granted Conditions 10 docs
  • Lower Largo W W T W Serpentine Walk Bourtree Brae Lower Largo Leven Fife KY8 6JH

    25/02526/NMV2 Submitted 6 Aug 2026 145m away

    99% historically approved · decision due ~9 Oct

    Change of use from agricultural land to allow for installation of plant and associated equipment, erection of fencing, installation of hardstanding, and formation of access - Non Material Variation for use of additional land

    Awaiting decision Conditions 4 docs
  • Beach House The Temple Lower Largo Leven Fife KY8 6JH

    21/03195/NMV1 Submitted 22 Jul 2026 145m away

    99% historically approved · decision due ~22 Sep

    Erection of workshop/studio (demolition of existing garage) (Non-Material Variation of planning application 21/03195/FULL to subdivide single ground floor studio room to two; minor glazing/door amendments (including rooflight changes); and minor amendments to internal wall positions/room areas.

    Awaiting decision Conditions Loft or dormer Demolition +1 6 docs

In Fife

  • 26/01900/FULL Granted

    The Steadings Kinaldy Farm Lathockar St Andrews Fife KY16 8NA

    Change of use and refurbishment of steading to form dwellinghouse (Class 9) including installation of windows and doors and rooflights and solar panels including replacement of roofing and formation of hardstanding and ancillary drainage (renewal of 23/00519/FULL)

    7 Jul 2026 Full applications
  • 26/01862/FULL Granted

    56 High Street Elie Leven Fife KY9 1DB

    Installation of 4 replacement windows to dormer extension to rear of dwellinghouse

    6 Jul 2026 Full applications
  • 26/02417/FULL Awaiting decision

    41 Dronachy Road Kirkcaldy Fife KY2 5QL

    Single storey front and side extension

    1 Sep 2026 Full applications
  • 26/02418/FULL Awaiting decision

    10 Woodhead Street High Valleyfield Dunfermline Fife KY12 8SQ

    Alterations to roof to rear of dwellinghouse

    1 Sep 2026 Full applications
  • 26/01282/FULL Granted

    3 High Street Crail Anstruther Fife KY10 3TA

    Installation of replacement windows and repainting of walls and front door

    5 May 2026 Full applications