Planning application

Land To The East Of A915 Fife

Granted Fife 24/01097/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use of land to operational railway and construction of railway station car park and passenger facilities and formation of access and associated infrastructure (Section 42 to vary condition 8 of planning reference 22/03425/FULL with regard to timescales for provision of active travel route between the railway station and Methilhill)

As published by the council, reference 24/01097/FULL

Application record

Reference
24/01097/FULL
Type
Full Planning Permission
Status
Decided
Decision
Application Permitted with Conditions
Received
26 Apr 2024
Validated
26 Apr 2024
Decided
14 Jun 2024
Ward
Leven, Kennoway And Largo
Parish
Windygates
Decision by
Delegated - Local Developments

Site history

Applications at this address on the Fife register

This site has had 4 applications since 2022: 3 approved, 0 refused.

  • 24/01097/CND003 Granted

    Land To The East Of A915 Fife

    Compliance with condition 3 of approved 24/01097/FULL - Within 28 days of this consent, timescales for the installation of the toucan crossing to be delivered as part of active travel route between Windygates and the rail station as shown on Document 02 shall be submitted and approved. The toucan crossing shall be operational for public use within the agreed timescales.

    Decided 3 Jul 2024 Conditions
  • 24/01097/CND007 Granted

    Land To The East Of A915 Fife

    Compliance with Condition 7 of Planning Permission 24/01097/FULL - Details of the maintenance works proposed to the existing path between Methilhill and the A915 shown on drawing 02, including timescales for delivery shall be submitted and agreed by the Planning Authority within 28 days of the date of this consent.

    Decided 17 Jul 2024 Conditions
  • 22/03554/PN Decided

    Land To The East Of A915 Fife

    Installation of platforms, footbridge and ancillary operational railway development associated with development

    Decided 21 Nov 2022 Prior approval

Timeline

Dates from the published record

  1. 26 Apr 2024

    Received by Fife

  2. 14 Jun 2024

    Decision issued: Application Permitted with Conditions

  3. 18 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

2 later applications on the register refer to this one:

  • 24/01097/CND003 Granted

    Land To The East Of A915 Fife

    Compliance with condition 3 of approved 24/01097/FULL - Within 28 days of this consent, timescales for the installation of the toucan crossing to be delivered as part of active travel route between Windygates and the rail station as shown on Document 02 shall be submitted and approved. The toucan crossing shall be operational for public use within the agreed timescales.

    Decided 3 Jul 2024 Conditions
  • 24/01097/CND007 Granted

    Land To The East Of A915 Fife

    Compliance with Condition 7 of Planning Permission 24/01097/FULL - Details of the maintenance works proposed to the existing path between Methilhill and the A915 shown on drawing 02, including timescales for delivery shall be submitted and agreed by the Planning Authority within 28 days of the date of this consent.

    Decided 17 Jul 2024 Conditions

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Fife granted permission on 14 June 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land To The East Of A915 Fife

    24/01097/CND007 Submitted 18 Jun 2024 71m away

    Compliance with Condition 7 of Planning Permission 24/01097/FULL - Details of the maintenance works proposed to the existing path between Methilhill and the A915 shown on drawing 02, including timescales for delivery shall be submitted and agreed by the Planning Authority within 28 days of the date of this consent.

    Granted Conditions 4 docs
  • Land To The East Of A915 Fife

    24/01097/CND003 Submitted 24 Jun 2024 71m away

    Compliance with condition 3 of approved 24/01097/FULL - Within 28 days of this consent, timescales for the installation of the toucan crossing to be delivered as part of active travel route between Windygates and the rail station as shown on Document 02 shall be submitted and approved. The toucan crossing shall be operational for public use within the agreed timescales.

    Granted Conditions 3 docs
  • Cameron Bridge Station Leven Fife KY8 5RD

    24/01149/RCC Submitted 1 May 2024 112m away

    Roads Construction Consent - active travel route to Cameron Bridge Station

    Granted 70 docs
  • Land To The East Of A915 Fife

    22/03554/PN Submitted 7 Oct 2022 148m away

    Installation of platforms, footbridge and ancillary operational railway development associated with development

    Decided Prior approval 9 docs
  • Railway Bridge UB105 011 At Kennoway Burn Fife

    22/03060/PN Submitted 5 Sep 2022 175m away

    Prior notification for the installation of replacement handrail

    Decided Prior approval 6 docs
  • Land East Of River Leven Elm Park Leven Fife

    24/00646/FULL Submitted 11 Mar 2024 317m away

    Formation of footpath including installation of lighting columns

    Granted Full applications 23 docs

In Fife

  • 26/01900/FULL Granted

    The Steadings Kinaldy Farm Lathockar St Andrews Fife KY16 8NA

    Change of use and refurbishment of steading to form dwellinghouse (Class 9) including installation of windows and doors and rooflights and solar panels including replacement of roofing and formation of hardstanding and ancillary drainage (renewal of 23/00519/FULL)

    7 Jul 2026 Full applications
  • 26/01862/FULL Granted

    56 High Street Elie Leven Fife KY9 1DB

    Installation of 4 replacement windows to dormer extension to rear of dwellinghouse

    6 Jul 2026 Full applications
  • 26/02417/FULL Awaiting decision

    41 Dronachy Road Kirkcaldy Fife KY2 5QL

    Single storey front and side extension

    1 Sep 2026 Full applications
  • 26/02418/FULL Awaiting decision

    10 Woodhead Street High Valleyfield Dunfermline Fife KY12 8SQ

    Alterations to roof to rear of dwellinghouse

    1 Sep 2026 Full applications
  • 26/01282/FULL Granted

    3 High Street Crail Anstruther Fife KY10 3TA

    Installation of replacement windows and repainting of walls and front door

    5 May 2026 Full applications