Skip to content
PlanIndex Get alerts
Menu

Planning application

6 Perdieus Mount Dunfermline Fife KY12 7XE

Granted Fife 24/00580/FULL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey extension to rear of dwellinghouse

As published by the council, reference 24/00580/FULL

Application record

Reference
24/00580/FULL
Type
Full Planning Permission
Status
Decided
Decision
Application Permitted with Conditions
Received
4 Mar 2024
Validated
4 Mar 2024
Decided
16 Apr 2024
Ward
Dunfermline Central
Parish
Central Dunfermline
Decision by
Delegated - Local Developments
Postcode
KY12 7XE

Timeline

Dates from the published record

  1. 4 Mar 2024

    Received by Fife

  2. 16 Apr 2024

    Decision issued: Application Permitted with Conditions

  3. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 53 Elgin Street Dunfermline Fife KY12 7SA

    24/01160/FULL Submitted 3 May 2024 202m away

    Change of use of scrubland to form storage area (Class 6) including formation of hardstanding, erection of boundary/acoustic fence, installation of lighting columns and associated drainage and landscaping infrastructure

    Granted Full applications 32 docs
    Small domestic
  • 10 Abington Road Dunfermline Fife KY12 7XU

    22/01894/FULL Submitted 14 Jun 2022 207m away

    Two storey extension to side of dwellinghouse

    Granted Full applications Extension 15 docs
    Domestic
  • 9 Corpach Drive Dunfermline Fife KY12 7XG

    26/01354/CLP Submitted 11 May 2026 225m away

    Single storey extension to side of dwellinghouse

    Granted Full applications Extension 16 docs
    Small domestic
  • 9 Corpach Drive Dunfermline Fife KY12 7XG

    26/01354/FULL Submitted 11 May 2026 225m away

    Single storey extension to side of dwellinghouse

    Granted Full applications Extension 16 docs
    Small domestic
  • 31 Abington Road Dunfermline Fife KY12 7XU

    26/01745/TPO Submitted 24 Jun 2026 251m away

    Crown reduction to 1 No. Ash tree (TPO W0034-T010)

    Granted Trees 8 docs
  • Former Council Depot Elgin Street Dunfermline Fife KY12 7SH

    24/00406/CND009 Submitted 26 Aug 2026 256m away

    99% historically approved · decision due ~23 Oct

    Compliance with Condition 9 of planning permission 24/00406/FULL - Biodiversity Enhancement Address :- 6 Elgin Street, Dunfermline, KY12 7SH

    Awaiting decision Conditions 5 docs

In Fife

  • 26/01900/FULL Granted

    The Steadings Kinaldy Farm Lathockar St Andrews Fife KY16 8NA

    Change of use and refurbishment of steading to form dwellinghouse (Class 9) including installation of windows and doors and rooflights and solar panels including replacement of roofing and formation of hardstanding and ancillary drainage (renewal of 23/00519/FULL)

    7 Jul 2026 Full applications
  • 26/01862/FULL Granted

    56 High Street Elie Leven Fife KY9 1DB

    Installation of 4 replacement windows to dormer extension to rear of dwellinghouse

    6 Jul 2026 Full applications
  • 26/02417/FULL Awaiting decision

    41 Dronachy Road Kirkcaldy Fife KY2 5QL

    Single storey front and side extension

    1 Sep 2026 Full applications
  • 26/02418/FULL Awaiting decision

    10 Woodhead Street High Valleyfield Dunfermline Fife KY12 8SQ

    Alterations to roof to rear of dwellinghouse

    1 Sep 2026 Full applications
  • 26/01282/FULL Granted

    3 High Street Crail Anstruther Fife KY10 3TA

    Installation of replacement windows and repainting of walls and front door

    5 May 2026 Full applications