Planning application

Land To South Of Main Street Colinsburgh Fife

Granted Fife 24/00238/RCC Roads Construction Consent

Works: New dwelling

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Roads Construction Consent for construction of new roads, footways and associated infrastructure to serve new residential development

As published by the council, reference 24/00238/RCC

Application record

Reference
24/00238/RCC
Type
Roads Construction Consent
Status
Decided
Decision
Application Permitted with Conditions
Received
30 Jan 2024
Validated
30 Jan 2024
Decided
17 Jun 2024
Ward
East Neuk And Landward
Parish
Colinsburgh and Kilconquhar
Decision by
Delegated - Other Consents

Site history

Applications at this address on the Fife register

This site has had 6 applications since 2024: 5 approved, 0 refused.

  • 23/01632/NMV1 Granted

    Land To South Of Main Street Colinsburgh Fife

    Residential Development of 50 dwellings with associated infrastructure including access, landscaping, drainage, SUDS and open space (Non-material variation for amendments to 23/01632/FULL)

    Decided 17 Jan 2025 Conditions
  • 23/01632/CND002 Granted

    Land To South Of Main Street Colinsburgh Fife

    Compliance with Condition 2 of Planning Permission 23/01632/FULL -BEFORE ANY WORKS COMMENCE ON SITE; a Construction Method Statement and Management Plan, including an Environmental Protection Plan and a Scheme of Works to mitigate the effects on sensitive premises/areas from dust, noise and vibration relating to construction activities on site, shall be submitted to and approved in writing by Fife Council as Planning Authority. All construction works shall then be carried out in full accordance with any approved details.

    Decided 11 Jun 2024 Conditions
  • 23/01632/CND007 Awaiting decision

    Land To South Of Main Street Colinsburgh Fife

    Compliance with Condition 7 of Planning Permission 23/01632/FULL - BEFORE ANY WORKS COMMENCE ON SITE; the developer shall secure the implementation of the programme of archaeological works as set out within the, hereby approved, written scheme of investigation (Plan Reference: 86). A verification report shall then be submitted to and approved in writing by Fife Council as Planning Authority once all of these required archaeological works have been carried out in full and BEFORE ANY WORKS ASSOCIATED WITH THE DEVELOPMENT COMMENCE ON SITE.

    Submitted 1 May 2024 Conditions
  • 23/01632/CND005 Granted

    Land To South Of Main Street Colinsburgh Fife

    Compliance with Condition 5 of Planning Permission 23/01632/FULL - BEFORE ANY WORKS COMMENCE ON SITE; full details relating to the required biodiversity enhancement measures as set out in the approved PEA (Plan Reference: 85) or any subsequent approved PEA as required by condition 4 of this panning permission shall be submitted to and approved in writing by this Planning Authority. All works shall then be carried out in full accordance with any subsequent approved details and all approved biodiversity enhancement measures shall be provided BEFORE ANY PART OF THE DEVELOPMENT IS BROUGHT INTO USE; unless otherwise agreed in writing with Fife Council as Planning Authority.

    Decided 10 Jun 2024 Conditions
  • 24/00396/ADV Granted

    Land To South Of Main Street Colinsburgh Fife

    Display of 1 non-illuminated stack sign and 7 non-illuminated flag signs

    Decided 12 Mar 2024 Advertising

Timeline

Dates from the published record

  1. 30 Jan 2024

    Received by Fife

  2. 17 Jun 2024

    Decision issued: Application Permitted with Conditions

  3. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

27 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Fife granted permission on 17 June 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Fife's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Land To South Of Main Street Colinsburgh Fife

    23/01632/CND002 Submitted 21 May 2024 0m away

    Compliance with Condition 2 of Planning Permission 23/01632/FULL -BEFORE ANY WORKS COMMENCE ON SITE; a Construction Method Statement and Management Plan, including an Environmental Protection Plan and a Scheme of Works to mitigate the effects on sensitive premises/areas from dust, noise and vibration relating to construction activities on site, shall be submitted to and approved in writing by Fife Council as Planning Authority. All construction works shall then be carried out in full accordance with any approved details.

    Granted Conditions 6 docs
  • Land To South Of Main Street Colinsburgh Fife

    23/01632/NMV1 Submitted 27 Aug 2024 0m away

    Residential Development of 50 dwellings with associated infrastructure including access, landscaping, drainage, SUDS and open space (Non-material variation for amendments to 23/01632/FULL)

    Granted Conditions New dwelling 16 docs
    Major scheme
  • Land To South Of Main Street Colinsburgh Fife

    23/01632/CND005 Submitted 12 Apr 2024 0m away

    Compliance with Condition 5 of Planning Permission 23/01632/FULL - BEFORE ANY WORKS COMMENCE ON SITE; full details relating to the required biodiversity enhancement measures as set out in the approved PEA (Plan Reference: 85) or any subsequent approved PEA as required by condition 4 of this panning permission shall be submitted to and approved in writing by this Planning Authority. All works shall then be carried out in full accordance with any subsequent approved details and all approved biodiversity enhancement measures shall be provided BEFORE ANY PART OF THE DEVELOPMENT IS BROUGHT INTO USE; unless otherwise agreed in writing with Fife Council as Planning Authority.

    Granted Conditions 4 docs
  • Land To South Of Main Street Colinsburgh Fife

    23/01632/CND007 Submitted 1 May 2024 0m away

    99% historically approved · decision due ~26 Jun

    Compliance with Condition 7 of Planning Permission 23/01632/FULL - BEFORE ANY WORKS COMMENCE ON SITE; the developer shall secure the implementation of the programme of archaeological works as set out within the, hereby approved, written scheme of investigation (Plan Reference: 86). A verification report shall then be submitted to and approved in writing by Fife Council as Planning Authority once all of these required archaeological works have been carried out in full and BEFORE ANY WORKS ASSOCIATED WITH THE DEVELOPMENT COMMENCE ON SITE.

    Awaiting decision Conditions 3 docs
  • Land To South Of Main Street Colinsburgh Fife

    24/00396/ADV Submitted 15 Feb 2024 144m away

    Display of 1 non-illuminated stack sign and 7 non-illuminated flag signs

    Granted Advertising 4 docs
  • Village Hall 2 Main Street Colinsburgh Leven Fife KY9 1LN

    26/00831/FULL Submitted 18 Mar 2026 209m away

    Change of use of agricultural land to allow for installation of 2 no. polytunnels, storage shed, fencing, landscaping, and associated works (part retrospective)

    Granted Full applications 13 docs
    Small domestic