Planning application
Dalgairn Lodge Bank Street Cupar Fife KY15 4JU
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of dwellinghouse including formation of access, parking and turning area (amendment to 21/01529/FULL)
As published by the council, reference 22/02495/FULL
Application record
- Reference
- 22/02495/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Permitted with Conditions
- Received
- 22 Jul 2022
- Validated
- 22 Jul 2022
- Decided
- 25 Nov 2022
- Ward
- Cupar
- Parish
- Royal Burgh of Cupar and District
- Decision by
- Delegated - Local Developments
- Postcode
- KY15 4JU
Timeline
Dates from the published record
-
22 Jul 2022
Received by Fife
-
25 Nov 2022
Decision issued: Application Permitted with Conditions
-
4 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Andrew Allan Architecture Ltd Agent, an architecture practice registered in Dunfermline
Active · incorporated 2017 · Dunfermline
125 applications on PlanIndex · across 4 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Fife granted permission on 25 November 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Dalgairn Centre Bank Street Cupar Fife
Erection of combined 24-bedroom residential care and 12-unit one-bedroom one-person (1b1p) extra care housing building with associated vehicle parking, service areas and landscaped open space (Non Material Variation for additional tree felling to facilitate permanent works drainage and for heavy plant and crane access during construction phase to 21/01596/FULL)
Granted Conditions Trees 4 docsMajor scheme -
Dalgairn Centre Bank Street Cupar Fife
Compliance with Condition 6 of Planning Permission 21/01596/FULL - That before development starts on site, a Traffic Management Plan relating to the construction phase of the development shall be submitted for the prior written approval of Fife Council as Planning Authority. The Traffic Management Plan shall include details of construction timescales, the location of any site compound, parking for labour and construction traffic and details of any impacts on the road network in terms of road closures etc.to ensure that the impact of the construction phase of the development creates minimal disruption to the normal operation of the surrounding road network. The Traffic Management Plan shall include the type and size of construction vehicles to be used and shall detail how these will access the site. The development shall proceed in accordance with the terms of the approved Traffic Management Plan.
Granted Conditions 2 docs -
Dalgairn Centre Bank Street Cupar Fife
Compliance with Condition 8 of Planning Permission 21/01596/FULL-that PRIOR TO ANY WORKS COMMENCING ON SITE, details of the specification (including manufacturer's brochure) and location of external lighting shall be submitted for approval in writing by the Planning Authority. The external lighting shall be installed prior to the care home being brought into use and shall be retained throughout the lifetime of the development.
Granted Conditions -
Dalgairn Centre Bank Street Cupar Fife
Erection of combined 24-bedroom residential care and 12-unit one-bedroom one-person (1b1p) extra care housing building with associated vehicle parking, service areas and landscaped open space (Non Material Variation to form opening in existing stone wall to Bank Street to form access to proposed substation by Statutory Undertaker and facilitating consented drainage connections to be made to 21/01596/FULL)
Granted Conditions 4 docsMajor scheme -
104 Upper Dalgairn Cupar Fife KY15 4JQ
Single storey extension to rear of dwellinghouse
Granted Full applications Extension 11 docsSmall domestic -
The Garden Flat Dalgairn House Dalgairn Cupar Fife KY15 4PH
Installation of 2 No. replacement windows to flatted dwelling
Granted Full applications Windows or glazing 14 docsDomestic
Other full applications
In Fife
-
26/02136/FULL Granted
8 Hallowhill St Andrews Fife KY16 8SF
Single storey extension and replacement decking to the rear of dwellinghouse
-
26/01112/FULL Granted
Rathelpie Kennedy Gardens St Andrews Fife KY16 9DJ
Alterations including formation of entrance porch, orangery and terrace to first floor, single storey extension to rear, and erection of single domestic detached garage to front of dwellinghouse
-
26/02404/FULL Granted
West End Collessie Brae Collessie Cupar Fife KY15 7RQ
Alterations to external colour of lime wash
-
26/02326/FULL Granted
Cottage Bank Newmill Farm Foodie Cupar Fife KY15 4RF
Single storey extension to front of dwellinghouse
-
26/02309/FULL Granted
11 The Crescent Dura Den Pitscottie Cupar Fife KY15 5TL
Installation of solar panels and air source heat pump with associated apparatus