Planning application
Land To The East Of Station Court Pittenweem Fife
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Compliance with condition 10 of Planning Permission 22/02133/FULL - That prior to any development commencing on site, a construction management plan shall be submitted to Fife Council as Planning Authority for prior written approval. The construction management plan shall consider potential residential amenity and road safety impacts which may arise during the construction period and detail how these will be mitigated. Once approved, the development shall proceed in accordance with the approved document.
As published by the council, reference 22/02133/CND010
Application record
- Reference
- 22/02133/CND010
- Type
- Condition Compliance
- Status
- Decided
- Decision
- Application Permitted - no conditions
- Received
- 7 Mar 2024
- Validated
- 7 Mar 2024
- Decided
- 14 Mar 2024
- Ward
- East Neuk And Landward
- Parish
- Royal Burgh Of Pittenweem And District
- Decision by
- Delegated - Other Consents
Site history
Applications at this address on the Fife register
This site has had 3 applications since 2024: 3 approved, 0 refused.
-
22/02133/CND012 Granted
Land To The East Of Station Court Pittenweem Fife
Compliance with condition 12 of approved 22/02133/FULL -That no site clearance shall occur on site from 1st March through to 31st August each year unless otherwise agreed in writing with this Planning Authority prior to clearance works commencing. In the event that clearance is proposed between 1st March to 31st August, a suitable bird survey shall be carried out by a suitably qualified ecologist covering the proposed clearance area and shall be submitted to and approved in writing by this Planning Authority before those clearance works commence. Once written approval has been given the works themselves should be carried out within a specified and agreed timescale.
-
22/02133/CND004 Granted
Land To The East Of Station Court Pittenweem Fife
Compliance with condition 4 of Planning Permission 22/02133/FULL - That before any works (including construction) start on site full details of adequate wheel cleaning facilities to be provided at the entrance/exit to the site to ensure that no mud, debris, or other deleterious material is carried by vehicles onto the public roads shall be submitted for approval in writing by the Planning Authority. The approved facilities shall be provided, retained, and maintained for the duration of operations on the site.
Timeline
Dates from the published record
-
7 Mar 2024
Received by Fife
-
14 Mar 2024
Decision issued: Application Permitted - no conditions
-
30 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Fife granted permission on 14 March 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land To The East Of Station Court Pittenweem Fife
Compliance with condition 12 of approved 22/02133/FULL -That no site clearance shall occur on site from 1st March through to 31st August each year unless otherwise agreed in writing with this Planning Authority prior to clearance works commencing. In the event that clearance is proposed between 1st March to 31st August, a suitable bird survey shall be carried out by a suitably qualified ecologist covering the proposed clearance area and shall be submitted to and approved in writing by this Planning Authority before those clearance works commence. Once written approval has been given the works themselves should be carried out within a specified and agreed timescale.
Granted Conditions 2 docs -
Land To The East Of Station Court Pittenweem Fife
Compliance with condition 4 of Planning Permission 22/02133/FULL - That before any works (including construction) start on site full details of adequate wheel cleaning facilities to be provided at the entrance/exit to the site to ensure that no mud, debris, or other deleterious material is carried by vehicles onto the public roads shall be submitted for approval in writing by the Planning Authority. The approved facilities shall be provided, retained, and maintained for the duration of operations on the site.
Granted Conditions 4 docs -
15 New Grange Crescent Pittenweem Anstruther Fife KY10 2QX
Two storey extension to side of dwellinghouse
Granted Full applications Extension 12 docsDomestic -
Pittenweem Inn 42 Charles Street Pittenweem Anstruther Fife KY10 2QJ
99% historically approved · decision due ~31 Aug
Alterations and extension to building to include installation of windows, doors, flue and air source heat pumps, roofing works, stonework/repointing and paintwork, replacement guttering, erection of rear extension, boundary wall and gate (including part demolition), conversion of outbuilding to form additional rooms and siting of 3.no shepherd huts, formation of hardstanding with associated landscaping and bin storage (Non Material Variation from application 24/00084/FULL - alterations to internal layout and installation of rooflights)
Awaiting decision Conditions Extension Loft or dormer +2 19 docsSmall domestic -
Pittenweem Inn 42 Charles Street Pittenweem Anstruther Fife KY10 2QJ
98% historically approved · decision due ~25 Sep
Listed building consent for internal and external works including installation of windows, doors, roofing works, replacement guttering, internal downtakings to reconfigure layout and associated works (demolition of timber porch, boiler store room and boiler flue to rear of the building) (amendment to 24/00086/LBC)
Awaiting decision Heritage and listed buildings Extension Demolition +1 33 docsSmall domestic -
25 Session Street Pittenweem Anstruther Fife KY10 2QL
Change of use from vacant workshop to dwellinghouse (Class 9) and external alterations including erection of extension and associated works
Granted Full applications Extension 13 docsDomestic
Other condition discharge and variation applications
In Fife
-
25/00522/NMV1 Granted
Rockslea Cottage Links Road Earlsferry Leven Fife KY9 1AW
Erection of replacement porch and alteration of door to form window and the erection of a single storey extension to rear of dwellinghouse (Non-Material Variation of application 25/00522/FULL minor partial changes to finish from facing brick to horizontal timber cladding boards on proposed rear extension)
-
24/03182/NMV2 Awaiting decision
Lundin Golf Club Golf Road Lundin Links Leven Fife KY8 6BA
Installation of safety net (Non Material Variation from application 24/03182/FULL for a Minor change to move the net along from approved position.)
-
25/01881/NMV1 Granted
Balbirnie House Hotel Balbirnie Park Markinch Glenrothes Fife KY7 6NE
Change of use from open space to allow for siting of 12 woodland cabins to provide additional accommodation ancillary to existing hotel (Class 7), formation of footpaths and associated works - Non-material variation for external alterations to 25/01881/FULL
-
26/01291/OBL Granted
Buckthorns Farm Upper Largo Leven Fife KY8 6EA
Discharge of Planning Obligation 08/95/0035D
-
23/02427/CND005 Granted
The Meadows Equestrian Kinaldy Meadows Lathockar St Andrews Fife KY16 8NA
Compliance with Condition 5 of planning permission 23/02427/FULL - Landscaping