Planning application
Land North And South Of A994 Conscience Bridge North Cairneyhill Fife
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Compliance with Condition 26 of Planning Permission 22/01344/FULL - PRIOR TO ANY WORKS COMMENCING ON SITE, a maintenance and aftercare strategy for the equipped play area shall be submitted for the written approval of the Planning Authority. Thereafter, the equipped play area shall be maintained in accordance with the approved strategy for the lifetime of the development
As published by the council, reference 22/01344/CND026
Application record
- Reference
- 22/01344/CND026
- Type
- Condition Compliance
- Status
- Decided
- Decision
- Application Permitted - no conditions
- Received
- 15 Feb 2024
- Validated
- 15 Feb 2024
- Decided
- 4 Mar 2024
- Ward
- West Fife And Coastal Villages
- Parish
- Cairneyhill
- Decision by
- Delegated - Other Consents
Site history
Applications at this address on the Fife register
This site has had 8 applications since 2024: 8 approved, 0 refused.
-
24/01005/ADV Granted
Land North And South Of A994 Conscience Bridge North Cairneyhill Fife
Display of non-illuminated freestanding sign
-
22/01344/CND033 Granted
Land North And South Of A994 Conscience Bridge North Cairneyhill Fife
Compliance with Condition 33 of Planning Permission 22/01344/FULL - That Prior to the occupation of the first dwelling, details of the proposed low/zero carbon generating technologies shall be submitted and approved in writing by the Local Planning Authority.
-
22/01344/CND012 Granted
Land North And South Of A994 Conscience Bridge North Cairneyhill Fife
Compliance with Condition 12 of Planning Permission 22/01344/FULL - That NO DEVELOPMENT SHALL COMMENCE ON SITE until the risk of actual or potential land contamination at the site has been investigated and a Preliminary Risk Assessment (Phase I Desk Study) has been submitted by the developer to and approved in writing by the planning authority. Where further investigation is recommended in the Preliminary Risk Assessment, no development shall commence until a suitable Intrusive Investigation (Phase II Investigation Report) has been submitted by the developer to and approved in writing by the planning authority. Where remedial action is recommended in the Phase II Intrusive Investigation Report, no development shall commence until a suitable Remedial Action Statement has been submitted by the developer to and approved in writing by the planning authority. The Remedial Action Statement shall include a timetable for the implementation and completion of the approved remedial measures. All land contamination reports shall be prepared in accordance with CLR11, PAN 33 and the Council's Advice for Developing Brownfield Sites in Fife documents or any subsequent revisions of those documents. Additional information can be found at www.fife.gov.uk/contaminatedland
-
22/01344/CND013 Granted
Land North And South Of A994 Conscience Bridge North Cairneyhill Fife
Compliance with Condition 13 of Planning Permission 22/01344/FULL - That NO BUILDING SHALL BE OCCUPIED UNTIL remedial action at the site has been completed in accordance with the Remedial Action Statement approved pursuant to condition 12. In the event that remedial action is unable to proceed in accordance with the approved Remedial Action Statement - or contamination not previously considered in either the Preliminary Risk Assessment or the Intrusive Investigation Report is identified or encountered on site - all development work on site (save for site investigation work) shall cease immediately and the planning authority shall be notified in writing within 2 working days. Unless otherwise agreed in writing with the local planning authority, development works shall not recommence until proposed revisions to the Remedial Action Statement have been submitted by the developer to and approved in writing by the planning authority. Remedial action at the site shall thereafter be completed in accordance with the approved revised Remedial Action Statement. Following completion of any measures identified in the approved Remedial Action Statement - or any approved revised Remedial Action Statement - a Verification Report shall be submitted by the developer to the local planning authority. Unless otherwise agreed in writing with the planning authority, no part of the site shall be brought into use until such time as the remedial measures for the whole site have been completed in accordance with the approved Remedial Action Statement - or the approved revised Remedial Action Statement - and a Verification Report in respect of those remedial measures has been submitted to and approved in writing by the local planning authority.
-
22/01344/CND024 Granted
Land North And South Of A994 Conscience Bridge North Cairneyhill Fife
Compliance with Condition 24 of Planning Permission 22/01344/FULL - PRIOR TO THE OCCUPATION OF THE FIRST RESIDENTIAL UNIT ON SITE, details of the construction and delivery of the informal paths shall be submitted for the written approval of Fife Council as planning authority. The details shall specify when each informal path will be delivered. The development shall be implemented in accordance with the details approved through this condition.
-
22/01344/CND027 Granted
Land North And South Of A994 Conscience Bridge North Cairneyhill Fife
Compliance with Condition 27 of Planning Permission 22/01344/FULL - BEFORE ANY WORKS START ON SITE, a scheme of landscaping indicating the siting, numbers, species and heights (at time of planting) of all trees, shrubs and hedges to be planted, and the extent and profile of any areas of earthmounding, shall be submitted for approval in writing by this Planning Authority. The scheme as approved shall be implemented within the first planting season following the completion or occupation of the development, whichever is the sooner.
-
22/01344/CND021 Granted
Land North And South Of A994 Conscience Bridge North Cairneyhill Fife
Compliance with Condition 21 of Planning Permission 22/01344/FULL - PRIOR TO ANY WORKS STARTING ON SITE, a public art strategy including the details of the proposed items of work relating to this strategy shall be submitted for the written approval of Fife Council as Planning Authority. The strategy shall demonstrate that the value of the works contributing to the public art strategy shall meet the terms of the Council's Guidance on Public Art in terms of the financial value of the items of work. The strategy shall propose a scheme of public consultation which shall involve Local Members and local community group or groups (if available) and shall include a phasing timescale for the implementation of the public art works. Thereafter the public art works shall be carried out entirely in accordance with the details and phasing approved under this condition.
Timeline
Dates from the published record
-
15 Feb 2024
Received by Fife
-
4 Mar 2024
Decision issued: Application Permitted - no conditions
-
30 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Fife granted permission on 4 March 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land North And South Of A994 Conscience Bridge North Cairneyhill Fife
Display of non-illuminated freestanding sign
Granted Advertising 7 docs -
Land North And South Of A994 Conscience Bridge North Cairneyhill Fife
Compliance with Condition 24 of Planning Permission 22/01344/FULL - PRIOR TO THE OCCUPATION OF THE FIRST RESIDENTIAL UNIT ON SITE, details of the construction and delivery of the informal paths shall be submitted for the written approval of Fife Council as planning authority. The details shall specify when each informal path will be delivered. The development shall be implemented in accordance with the details approved through this condition.
Granted Conditions 5 docs -
Land North And South Of A994 Conscience Bridge North Cairneyhill Fife
Compliance with Condition 33 of Planning Permission 22/01344/FULL - That Prior to the occupation of the first dwelling, details of the proposed low/zero carbon generating technologies shall be submitted and approved in writing by the Local Planning Authority.
Granted Conditions 3 docsDomestic -
Land North And South Of A994 Conscience Bridge North Cairneyhill Fife
Compliance with Condition 12 of Planning Permission 22/01344/FULL - That NO DEVELOPMENT SHALL COMMENCE ON SITE until the risk of actual or potential land contamination at the site has been investigated and a Preliminary Risk Assessment (Phase I Desk Study) has been submitted by the developer to and approved in writing by the planning authority. Where further investigation is recommended in the Preliminary Risk Assessment, no development shall commence until a suitable Intrusive Investigation (Phase II Investigation Report) has been submitted by the developer to and approved in writing by the planning authority. Where remedial action is recommended in the Phase II Intrusive Investigation Report, no development shall commence until a suitable Remedial Action Statement has been submitted by the developer to and approved in writing by the planning authority. The Remedial Action Statement shall include a timetable for the implementation and completion of the approved remedial measures. All land contamination reports shall be prepared in accordance with CLR11, PAN 33 and the Council's Advice for Developing Brownfield Sites in Fife documents or any subsequent revisions of those documents. Additional information can be found at www.fife.gov.uk/contaminatedland
Granted Conditions 4 docs -
Land North And South Of A994 Conscience Bridge North Cairneyhill Fife
Compliance with Condition 13 of Planning Permission 22/01344/FULL - That NO BUILDING SHALL BE OCCUPIED UNTIL remedial action at the site has been completed in accordance with the Remedial Action Statement approved pursuant to condition 12. In the event that remedial action is unable to proceed in accordance with the approved Remedial Action Statement - or contamination not previously considered in either the Preliminary Risk Assessment or the Intrusive Investigation Report is identified or encountered on site - all development work on site (save for site investigation work) shall cease immediately and the planning authority shall be notified in writing within 2 working days. Unless otherwise agreed in writing with the local planning authority, development works shall not recommence until proposed revisions to the Remedial Action Statement have been submitted by the developer to and approved in writing by the planning authority. Remedial action at the site shall thereafter be completed in accordance with the approved revised Remedial Action Statement. Following completion of any measures identified in the approved Remedial Action Statement - or any approved revised Remedial Action Statement - a Verification Report shall be submitted by the developer to the local planning authority. Unless otherwise agreed in writing with the planning authority, no part of the site shall be brought into use until such time as the remedial measures for the whole site have been completed in accordance with the approved Remedial Action Statement - or the approved revised Remedial Action Statement - and a Verification Report in respect of those remedial measures has been submitted to and approved in writing by the local planning authority.
Granted Conditions 4 docs -
Land North And South Of A994 Conscience Bridge North Cairneyhill Fife
Compliance with Condition 27 of Planning Permission 22/01344/FULL - BEFORE ANY WORKS START ON SITE, a scheme of landscaping indicating the siting, numbers, species and heights (at time of planting) of all trees, shrubs and hedges to be planted, and the extent and profile of any areas of earthmounding, shall be submitted for approval in writing by this Planning Authority. The scheme as approved shall be implemented within the first planting season following the completion or occupation of the development, whichever is the sooner.
Granted Conditions Trees 16 docs
Other condition discharge and variation applications
In Fife
-
25/00522/NMV1 Granted
Rockslea Cottage Links Road Earlsferry Leven Fife KY9 1AW
Erection of replacement porch and alteration of door to form window and the erection of a single storey extension to rear of dwellinghouse (Non-Material Variation of application 25/00522/FULL minor partial changes to finish from facing brick to horizontal timber cladding boards on proposed rear extension)
-
24/03182/NMV2 Awaiting decision
Lundin Golf Club Golf Road Lundin Links Leven Fife KY8 6BA
Installation of safety net (Non Material Variation from application 24/03182/FULL for a Minor change to move the net along from approved position.)
-
25/01881/NMV1 Granted
Balbirnie House Hotel Balbirnie Park Markinch Glenrothes Fife KY7 6NE
Change of use from open space to allow for siting of 12 woodland cabins to provide additional accommodation ancillary to existing hotel (Class 7), formation of footpaths and associated works - Non-material variation for external alterations to 25/01881/FULL
-
26/01291/OBL Granted
Buckthorns Farm Upper Largo Leven Fife KY8 6EA
Discharge of Planning Obligation 08/95/0035D
-
23/02427/CND005 Granted
The Meadows Equestrian Kinaldy Meadows Lathockar St Andrews Fife KY16 8NA
Compliance with Condition 5 of planning permission 23/02427/FULL - Landscaping