Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Roomlin Gardens Kirkcaldy Fife KY1 3BQ

Granted Fife 21/00079/FULL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey extension to rear of dwellinghouse

As published by the council, reference 21/00079/FULL

Application record

Reference
21/00079/FULL
Type
Full Planning Permission
Status
Decided
Decision
Application Permitted - no conditions
Received
12 Jan 2021
Validated
14 Jan 2021
Decided
26 Feb 2021
Ward
Kirkcaldy East
Parish
East Kirkcaldy (No CC)
Decision by
Delegated - Local Developments
Postcode
KY1 3BQ

Timeline

Dates from the published record

  1. 12 Jan 2021

    Received by Fife

  2. 14 Jan 2021

    Validated

    Checked as complete and ready for consideration.

  3. 26 Feb 2021

    Decision issued: Application Permitted - no conditions

  4. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 14 Viewforth Avenue Kirkcaldy Fife KY1 3BL

    24/01498/FULL Submitted 10 Jun 2024 144m away

    Single storey extension to rear of existing garage

    Granted Full applications Extension 11 docs
    Small domestic
  • 1 The Fairway Kirkcaldy Fife KY1 3AU

    26/01127/CLP Submitted 17 Apr 2026 194m away

    Certificate of lawfulness (proposed) for single storey extension to rear of dwellinghouse

    Granted Lawful development Extension 4 docs
    Small domestic
  • Scout Hall Quarry Brae Kirkcaldy Fife KY1 3AT

    26/01931/FULL Submitted 10 Jul 2026 214m away

    96% historically approved · decision due ~14 Oct

    Change of use from scout hall (Class 10) to gymnasium (Class 11), and alterations to car parking

    Awaiting decision Full applications 12 docs
  • Gallatown Nursery School Rosslyn Street Kirkcaldy Fife KY1 3AB

    26/00845/LBC Submitted 20 Mar 2026 323m away

    Listed building consent for external fabric repairs

    Granted Heritage and listed buildings 11 docs
  • 39 Rosslyn Street Kirkcaldy Fife

    23/03381/CND013 Submitted 17 Jun 2024 364m away

    Compliance with conditon 13 of approved 23/03381/FULL - NO BUILDING SHALL BE OCCUPIED UNTIL remedial action at the site has been completed in accordance with the Remedial Action Statement approved pursuant to condition ^IN;. In the event that remedial action is unable to proceed in accordance with the approved Remedial Action Statement - or contamination not previously considered in either the Preliminary Risk Assessment or the Intrusive Investigation Report is identified or encountered on site - all development work on site (save for site investigation work) shall cease immediately and the planning authority shall be notified in writing within 2 working days. Unless otherwise agreed in writing with the local planning authority, development works shall not recommence until proposed revisions to the Remedial Action Statement have been submitted by the developer to and approved in writing by the planning authority. Remedial action at the site shall thereafter be completed in accordance with the approved revised Remedial Action Statement. Following completion of any measures identified in the approved Remedial Action Statement - or any approved revised Remedial Action Statement - a Verification Report shall be submitted by the developer to the local planning authority.

    Granted Conditions 5 docs
  • 92 Loughborough Road Kirkcaldy Fife KY1 3DD

    22/02896/FULL Submitted 25 Aug 2022 367m away

    Erection of replacement detached double domestic garage/outbuilding with associated roof terrace to rear, and erection of replacement walls and gates to front/side of dwellinghouse

    Granted Full applications 25 docs
    Small domestic

In Fife

  • 26/01900/FULL Granted

    The Steadings Kinaldy Farm Lathockar St Andrews Fife KY16 8NA

    Change of use and refurbishment of steading to form dwellinghouse (Class 9) including installation of windows and doors and rooflights and solar panels including replacement of roofing and formation of hardstanding and ancillary drainage (renewal of 23/00519/FULL)

    7 Jul 2026 Full applications
  • 26/01862/FULL Granted

    56 High Street Elie Leven Fife KY9 1DB

    Installation of 4 replacement windows to dormer extension to rear of dwellinghouse

    6 Jul 2026 Full applications
  • 26/02417/FULL Awaiting decision

    41 Dronachy Road Kirkcaldy Fife KY2 5QL

    Single storey front and side extension

    1 Sep 2026 Full applications
  • 26/02418/FULL Awaiting decision

    10 Woodhead Street High Valleyfield Dunfermline Fife KY12 8SQ

    Alterations to roof to rear of dwellinghouse

    1 Sep 2026 Full applications
  • 26/01282/FULL Granted

    3 High Street Crail Anstruther Fife KY10 3TA

    Installation of replacement windows and repainting of walls and front door

    5 May 2026 Full applications