Activity Hub : East end of Regal Pass Jetty, Wellington Road, Enniskillen, BT74 7EF’ Waterways Ireland has put in place the resources to install a floating Blueway’s Activity Hub at Regal Pass jetty to facilitate and encourage recreational use of the waterway. This floating Activity Hub will be comprised of three floating concrete breakwater units or pontoons joined together and will be accessible using Waterways Irelands existing jetty at Regal Pass beside the footbridge over to Erne side off the Wellington Road. The Activity Hub will have an office unit, changing unit, storage unit, two portable toilets, a canoe cage for additional storage and a plastic floating canoe step to aid access and egress for participation in canoe sports.
As published by the council, reference LA10/2026/0425/F
Timeline
Dates from the published record
-
28 Apr 2026
Received by Fermanagh and Omagh
-
5 May 2026
Validated
Checked as complete and ready for consideration.
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Fermanagh and Omagh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
LA10/2025/1050/F Granted
35 Townhall Street, Enniskillen, BT74 7BD
Proposed Change of Use from Flower Shop to Delicatessan
-
LA10/2025/1036/F Granted
25 East Bridge Street, Enniskillen, BT74 7BW
Alterations to existing building to include, change of use and alterations of exsting lower ground floor storage areas to form retail unit including provision of new shop-front, removal of existing external stair and replacement with new external stair, change of use and alterations of existing first floor beauty salon and alterations to existing second and third floor flat to form a 3 bedroom flat and roofspace storage, replacement windows to first and second floor, and all associated works.
-
LA10/2025/1037/DCA Granted
25 East Bridge Street, Enniskillen, BT74 7BW
Alterations to existing building to include, change of use and alterations of exsting lower ground floor storage areas to form retail unit including provision of new shop-front, removal of existing external stair and replacement with new external stair, change of use and alterations of existing first floor beauty salon and alterations to existing second and third floor flat to form a 3 bedroom flat and roofspace storage, replacement windows to first and second floor, and all associated works.
-
LA10/2026/0489/DCA Awaiting decision
16-20 Townhall Street Enniskillen BT74 7BA
Demolition of outbuildings and boundary wall. Single-storey extension and alterations to ground floor retail units to form one larger unit to nos. 16 &18 (Shopfronts to remain unaltered). Forming new access to residential units. Alterations to first floor of nos. 16 & 18 to form 1no. two-bedroom apartment. Alterations to the second floor of nos. 16, 18 & 20 to form 2no. one-bedroom apartments to include removal of chimneys and extension.
-
LA10/2026/0488/F Awaiting decision
16-20 Townhall Street, Enniskillen, Fermanagh, BT74 7BA
Demolition of outbuildings and boundary wall. Single-storey extension and alterations to ground floor retail units to form one larger unit to nos. 16 &18 (Shopfronts to remain unaltered). Forming new access to residential units. Alterations to first floor of nos. 16 & 18 to form 1no. two-bedroom apartment. Alterations to the second floor of nos. 16, 18 & 20 to form 2no. one-bedroom apartments to include removal of chimneys and extension.
-
LA10/2025/1039/LBC Granted
Bank of Ireland, 7 Townhall Street, Enniskillen, BT74 7BD
Proposed installation of an external defibrillator unit to the front elevation of the existing premises
Other full applications applications
In Fermanagh and Omagh
-
LA10/2026/0702/F Awaiting decision
11 Tullyhill Road, Killashanbally, Maguiresbridge, BT94 4RN
Proposed single storey front extension
-
LA10/2026/0578/F Granted
Between 59 and 61 Camlough Road, Sixmilecross, Co. Tyrone, BT79 9LN
Dwelling & Garage-change of house type previously approved under LA10/2023/2088/O & LA10/2024/0752/RM (dwelling & garage)
-
LA10/2026/0568/F Granted
Adjacent to and NE of 63 Tirquin Road, Omagh
Renewal of Planning Permission LA10/2021/1495/F (Erection of Dwelling)
-
LA10/2026/0553/F Granted
1 Fallaghearn Road, Fallaghearn, Sixmilecross, Tyrone, BT79 9HZ
Proposed ground floor extension to front of dwelling
-
LA10/2026/0690/F Awaiting decision
Lands to the northeast of the existing Loughmacrory Hill Service Reservoir, approximately 0.5km northeast of No.32 Coolaharan Road, Loughmacrory, Sixmilecross, BT79 9LP
Proposed construction of a 5 megalitre Service Reservoir at Loughmacrory Hill including outlet infrastructure, upgrading and extending the existing site access road, perimeter fencing and landscaping, and all associated site works.